-
1
-
-
0013081348
-
-
Smithsonian Institution Press, Washington, DC.
-
Agar, M.H. (1986) Independents Declared, Smithsonian Institution Press, Washington, DC.
-
(1986)
Independents Declared
-
-
Agar, M.H.1
-
3
-
-
8844221973
-
Implementation projects: Decisions and expenditures
-
Heim, J. and Compton, W. (eds), National Academy Press, Washington, DC.
-
Bovven, H. (1992) Implementation projects: decisions and expenditures, in Manufacturing Systems: Foundations of World-Class Practice, Heim, J. and Compton, W. (eds), National Academy Press, Washington, DC.
-
(1992)
In Manufacturing Systems: Foundations of World-Class Practice
-
-
Bovven, H.1
-
5
-
-
0026837054
-
-
Burati, J.L., Farrington, J.J., and Ledbetter W.B. (1992) Causes of quality deviations in design and construction, Journal of Construction Engineering and Management, 118(1), 34-49.
-
(1992)
Causes of Quality Deviations in Design and Construction, Journal of Construction Engineering and Management
, vol.118
, Issue.1
, pp. 34-49
-
-
Burati, J.L.1
Farrington, J.J.2
Ledbetter, W.B.3
-
6
-
-
0026169337
-
-
Burati, J.L., Matthews, M.F. and Kalidlindi, N. (1989) Quality management in the construction industry, ASCE Journal of Construction Engineering and Management, 117, 341-57.
-
(1989)
Quality Management in the Construction Industry, ASCE Journal of Construction Engineering and Management
, vol.117
, pp. 341-357
-
-
Burati, J.L.1
Matthews, M.F.2
Kalidlindi, N.3
-
9
-
-
33744492576
-
-
Chentiz, W.C. and Swanson, J.M. (1986) From Practice to Grounded Theory, Addison-Wesley, Menlo Park, CA.
-
(1986)
From Practice to Grounded Theory, Addison-Wesley, Menlo Park, CA.
-
-
Chentiz, W.C.1
Swanson, J.M.2
-
12
-
-
7944229862
-
Lack of quality in construction economic losses
-
Lisbon, Portugal, 30 September4 October, pp. 508-15.
-
Cnuddle, M. (1991) Lack of quality in construction economic losses, in Proceedings of the European Symposium on Management, Quality and Economics in Housing and Other Building Sectors, Lisbon, Portugal, 30 September4 October, pp. 508-15.
-
(1991)
In Proceedings of the European Symposium on Management, Quality and Economics in Housing and Other Building Sectors
-
-
Cnuddle, M.1
-
18
-
-
0004209785
-
-
Easterby-Smith, M., Thorpe, R. and Lowe, A. (1991) Management Research: An Introduction, Sage Publications, London.
-
(1991)
Management Research: an Introduction, Sage Publications, London.
-
-
Easterby-Smith, M.1
Thorpe, R.2
Lowe, A.3
-
22
-
-
2042477906
-
Sources of quality failures in building
-
Lisbon, Portugal, 30 September 4 October, pp. 671-9.
-
Hammarlund, Y. and Josephson, P. E. (1991) Sources of quality failures in building, in European Symposium on Management, Quality and Economics in Housing and Other Building Sectors. Lisbon, Portugal, 30 September 4 October, pp. 671-9.
-
(1991)
In European Symposium on Management, Quality and Economics in Housing and Other Building Sectors.
-
-
Hammarlund, Y.1
Josephson, P.E.2
-
25
-
-
78649558691
-
The Cost of Defects in Construction
-
University of Strathclyde, UK, Vol. 2.
-
Josephson, P.E. and Hammarlund, Y. (1996) The Cost of Defects in Construction, in Proceedings of CIB-W65: International Symposium for the Organization and Management of Construction -Shaping Theory and Practice, University of Strathclyde, UK, Vol. 2.
-
(1996)
In Proceedings of CIB-W65: International Symposium for the Organization and Management of Construction -Shaping Theory and Practice
-
-
Josephson, P.E.1
Hammarlund, Y.2
-
29
-
-
0002076415
-
On foundations of concurrent engineering
-
London, 3-4 June, The Institution of Engineers
-
Koskela, L. and Huovila, P. (1997) On foundations of concurrent engineering, in Proceedings of the First International Conference on Concurrent Engineering in Construction, London, 3-4 June, The Institution of Engineers, pp. 22-31.
-
(1997)
In Proceedings of the First International Conference on Concurrent Engineering in Construction
, pp. 22-31
-
-
Koskela, L.1
Huovila, P.2
-
30
-
-
0344550818
-
Strategic alliances between contractors and subcontractors - A tender evaluation criterion for the Public Works sector in
-
14-15 July, Gold Coast, Queensland, Australia
-
Kwok, T.L. and Hampson, K.D. (1997) Strategic alliances between contractors and subcontractors - a tender evaluation criterion for the Public Works sector in Proceedings of the International Conference on Construction Process Re-engineering, 14-15 July, Gold Coast, Queensland, Australia, pp.671-84.
-
(1997)
Proceedings of the International Conference on Construction Process Re-engineering
, pp. 671-684
-
-
Kwok, T.L.1
Hampson, K.D.2
-
33
-
-
0031649165
-
-
Love, P.E.D., Gunasekaran, A. and Li, H. (1998a) Improving the competitiveness of manufacturing companies through continuous incremental change, TQM Magazine, 10(3), 177-85.
-
(1998)
Improving the Competitiveness of Manufacturing Companies through Continuous Incremental Change, TQM Magazine
, vol.10
, Issue.3
, pp. 177-185
-
-
Love, P.E.D.1
Gunasekaran, A.2
Li, H.3
-
34
-
-
14744306765
-
Benchmarking the costs of poor quality in construction: A case study
-
9-11 February, Monash University, Australia
-
Love, P.E.D., Smith, J. and Li, H. (1998b) Benchmarking the costs of poor quality in construction: a case study, in Proceedings of the Second International and Fifth National Conference on Quality Management, 9-11 February, Monash University, Australia pp. 114-24.
-
(1998)
In Proceedings of the Second International and Fifth National Conference on Quality Management
, pp. 114-124
-
-
Love, P.E.D.1
Smith, J.2
Li, H.3
-
36
-
-
1542524906
-
-
Mandai, P., Howell, A. and Sohal, A.S. (1998) A systematic approach to quality improvements: the interactions between the technical, human and quality systems, Total Quality Management Journal, 9(1), 79-100.
-
(1998)
A Systematic Approach to Quality Improvements: the Interactions between the Technical, Human and Quality Systems, Total Quality Management Journal
, vol.9
, Issue.1
, pp. 79-100
-
-
Mandai, P.1
Howell, A.2
Sohal, A.S.3
-
38
-
-
11544340944
-
-
Mohapatra, P.KJ. and Mandai, P. (1989) The system dynamics paradigm, Decision, 16(4), 251-66.
-
(1989)
The System Dynamics Paradigm, Decision
, vol.16
, Issue.4
, pp. 251-266
-
-
Mohapatra, P.K.J.1
Mandai, P.2
-
39
-
-
33744458170
-
-
Mohapatra, P.K.J., Mandai, P. and Bora, M.C. (1994) Introduction to System Dynamics Modelling, Universities Press, New Delhi, India.
-
(1994)
Introduction to System Dynamics Modelling, Universities Press, New Delhi, India.
-
-
Mohapatra, P.K.J.1
Mandai, P.2
Bora, M.C.3
-
40
-
-
21144482645
-
-
Parke, A. (1993) Messy research, methodological predispositions, and theory development in international joint ventures, Academy of Management Review, 18(2), 227-68.
-
(1993)
Messy Research, Methodological Predispositions, and Theory Development in International Joint Ventures, Academy of Management Review
, vol.18
, Issue.2
, pp. 227-268
-
-
Parke, A.1
-
41
-
-
33744490072
-
-
Perry, C. and Coote, L. (1994) Process of a Case Study Research Methodology: Tool for Management Development, Proceedings of Australian and New Zealand Association for Management ANZAM Conference, December, Victoria University of Wellington, New Zealand.
-
(1994)
Process of a Case Study Research Methodology: Tool for Management Development, Proceedings of Australian and New Zealand Association for Management ANZAM Conference, December, Victoria University of Wellington, New Zealand.
-
-
Perry, C.1
Coote, L.2
-
42
-
-
0002177557
-
Contextualist research: A naturalistic way to link theory and practice
-
E.E Lawler (ed), Jossey-Bass, San Francisco.
-
Pettigew, A. (1985) Contextualist research: a naturalistic way to link theory and practice, in Doing Research That is Useful in Theory and Practice, E.E Lawler (ed), Jossey-Bass, San Francisco.
-
(1985)
In Doing Research that Is Useful in Theory and Practice
-
-
Pettigew, A.1
-
43
-
-
0003114898
-
-
Phillips, L.W., Chang, W.D. and Buzell, R.D. (1983) Quality, cost position and business performance: a test of some key hypotheses, Journal of Marketing, 7, 26-43.
-
(1983)
Quality, Cost Position and Business Performance: a Test of some Key Hypotheses, Journal of Marketing
, vol.7
, pp. 26-43
-
-
Phillips, L.W.1
Chang, W.D.2
Buzell, R.D.3
-
44
-
-
0030211890
-
-
Rodrigues, A. and Bowers, J. (1996) The role of system dynamics in project management, International Journal of Project Management, 14(4), 213-20.
-
(1996)
The Role of System Dynamics in Project Management, International Journal of Project Management
, vol.14
, Issue.4
, pp. 213-220
-
-
Rodrigues, A.1
Bowers, J.2
-
47
-
-
0029539990
-
-
Seymour, D. and Rooke, D. (1995) The culture of the industry and the culture of research, Construction Management and Economics, 13, 511-23.
-
(1995)
The Culture of the Industry and the Culture of Research, Construction Management and Economics
, vol.13
, pp. 511-523
-
-
Seymour, D.1
Rooke, D.2
-
48
-
-
85034497270
-
The influence of management on construction system productivity towards a conceptual system causal model
-
in GIB W-65: Waterloo, Ontario.
-
Shaddad, M.Y.I, and Pilcher, R. (1984) The influence of management on construction system productivity towards a conceptual system causal model, in GIB W-65: The Organisation and Management of Construction Symposium, Waterloo, Ontario.
-
(1984)
The Organisation and Management of Construction Symposium
-
-
Shaddad, M.Y.I.1
Pilcher, R.2
-
50
-
-
0003770903
-
-
a pilot survey report, CSIRO, DBCE DOC 96/29(M), May.
-
Tucker, S.N., Love, P.E.D., Tilley P.A., Salomonsson, G.S., MacSporran, C. and Mohamed, S. (1996) Perspectives of Construction Contractors Communication and Performances Practices, a pilot survey report, CSIRO, DBCE DOC 96/29(M), May.
-
(1996)
Perspectives of Construction Contractors Communication and Performances Practices
-
-
Tucker, S.N.1
Love, P.E.D.2
Tilley, P.A.3
Salomonsson, G.S.4
MacSporran, C.5
Mohamed, S.6
-
51
-
-
33744485239
-
-
Walker, D.H.T. (1994) An investigation into factors that determine building construction time performance, Ph.D. thesis, Royal Melbourne University of Technology, Melbourne, Australia.
-
(1994)
An Investigation into Factors that Determine Building Construction Time Performance, Ph.D. Thesis, Royal Melbourne University of Technology, Melbourne, Australia.
-
-
Walker, D.H.T.1
-
52
-
-
0029342363
-
-
Williams, T., Eden, C., Ackerman, F. and Tait, A. (1995) The effects of design changes and delays on project costs, Journal of Operational Research Society, 46, 809-18.
-
(1995)
The Effects of Design Changes and Delays on Project Costs, Journal of Operational Research Society
, vol.46
, pp. 809-818
-
-
Williams, T.1
Eden, C.2
Ackerman, F.3
Tait, A.4
-
53
-
-
0029316324
-
-
Williams, T., Eden, G., Ackerman, F. and Tait, A. (1996) Vicious circles of parallelism, International Journal of Project Management, 13(3), 151-5.
-
(1996)
Vicious Circles of Parallelism, International Journal of Project Management
, vol.13
, Issue.3
, pp. 151-155
-
-
Williams, T.1
Eden, G.2
Ackerman, F.3
Tait, A.4
|