메뉴 건너뛰기




Volumn 11, Issue 4, 2004, Pages 259-274

Determinants of rework in building construction projects

Author keywords

Australia; Construction works; Costs; Production costs

Indexed keywords

ACCIDENT PREVENTION; COSTS; DATA ACQUISITION; PROFESSIONAL ASPECTS; PROJECT MANAGEMENT; REGRESSION ANALYSIS; RESEARCH;

EID: 4143055741     PISSN: 09699988     EISSN: None     Source Type: Journal    
DOI: 10.1108/09699980410547612     Document Type: Review
Times cited : (92)

References (79)
  • 4
    • 2342646505 scopus 로고    scopus 로고
    • The Australian Procurement and Construction Council Inc., Deakin West, ACT, Australia
    • Australian Procurement and Construction Council (APCC) (1997), Construct Australia: Building a Better Construction Industry in Australia, The Australian Procurement and Construction Council Inc., Deakin West, ACT, Australia.
    • (1997) Construct Australia: Building A Better Construction Industry in Australia
  • 8
    • 0001916379 scopus 로고
    • AIQS survey of building contract time performance
    • Bromilow, F.J., Hinds, M.F. and Moody, N.F. (1980), "AIQS survey of building contract time performance", The Building Economist, Vol. 19, pp. 79-82.
    • (1980) The Building Economist , vol.19 , pp. 79-82
    • Bromilow, F.J.1    Hinds, M.F.2    Moody, N.F.3
  • 12
    • 4143130936 scopus 로고
    • Quality Assurance in the Construction Industry, Concrete Institute of Australia, Melbourne, Australia
    • Burroughs, G. (1993), Concrete Quality Assurance: The Contractors Role, Quality Assurance in the Construction Industry, Concrete Institute of Australia, Melbourne, Australia.
    • (1993) Concrete Quality Assurance: The Contractors Role
    • Burroughs, G.1
  • 13
    • 84985841625 scopus 로고
    • The impact of alternative vendor/buyer communication structures of quality of purchased materials
    • Carter, J.R. and Miller, J.G. (1989), "The impact of alternative vendor/buyer communication structures of quality of purchased materials", Decision Sciences, Vol. 20, pp. 759-76.
    • (1989) Decision Sciences , vol.20 , pp. 759-776
    • Carter, J.R.1    Miller, J.G.2
  • 16
    • 4143102401 scopus 로고    scopus 로고
    • Relationship of safety programs and project performance
    • Chan, A.P.C. (2000), "Relationship of safety programs and project performance", Construction and Real Estate Review, Vol. 4 No. 2, pp. 1-4.
    • (2000) Construction and Real Estate Review , vol.4 , Issue.2 , pp. 1-4
    • Chan, A.P.C.1
  • 17
    • 0031078243 scopus 로고    scopus 로고
    • A comparative study of causes of time overruns in Hong Kong construction projects
    • Chan, D.W.M. and Kumaraswamy, M.M. (1997), "A comparative study of causes of time overruns in Hong Kong construction projects", International Journal of Project Management, Vol. 15 No. 1, pp. 55-63.
    • (1997) International Journal of Project Management , vol.15 , Issue.1 , pp. 55-63
    • Chan, D.W.M.1    Kumaraswamy, M.M.2
  • 18
    • 7944221137 scopus 로고
    • Construction Industry Development Agency (CIDA) in conjunction with the Australian Institute of Quantity Surveyors, Sydney, NSW, Australia
    • CIDA (1993), A Report on the Time and Cost Performance of Australian Building Projects Completed 1988-W93, Construction Industry Development Agency (CIDA) in conjunction with the Australian Institute of Quantity Surveyors, Sydney, NSW, Australia.
    • (1993) A Report on the Time and Cost Performance of Australian Building Projects Completed 1988-W93
  • 20
    • 0004032390 scopus 로고
    • Construction Industry Institute Design Task Force, University of Texas at Austin, Publication 8-2 July, USA
    • Construction Industry Institute (CII) (1987), Input Variables Impacting Design Effectiveness, Construction Industry Institute Design Task Force, University of Texas at Austin, Publication 8-2 July, USA.
    • (1987) Input Variables Impacting Design Effectiveness
  • 21
    • 4143124332 scopus 로고
    • Construction Industry Institute (CII), The University of Texas at Austin, Austin, Texas, Publication 6-10 April, USA
    • Construction Industry Institute (CII) (1990), The Impact of Changes on Construction Cost and Schedule, Construction Industry Institute (CII), The University of Texas at Austin, Austin, Texas, Publication 6-10 April, USA.
    • (1990) The Impact of Changes on Construction Cost and Schedule
  • 22
    • 0004603683 scopus 로고    scopus 로고
    • A quantitative study of post contract award design changes in construction
    • Cox, I.D., Morris, J., Rogerson, J.H. and Jared, G.E. (1999), "A quantitative study of post contract award design changes in construction", Construction Management and Economics, Vol. 17 No. 4, pp. 427-39.
    • (1999) Construction Management and Economics , vol.17 , Issue.4 , pp. 427-439
    • Cox, I.D.1    Morris, J.2    Rogerson, J.H.3    Jared, G.E.4
  • 23
    • 0344578201 scopus 로고
    • Building Research Establishment, Current Paper CP 60/76, Watford, UK
    • Crawshaw, D.T. (1976), Co-ordinating Working Drawings, Building Research Establishment, Current Paper CP 60/76, Watford, UK.
    • (1976) Co-ordinating Working Drawings
    • Crawshaw, D.T.1
  • 24
    • 0027675558 scopus 로고
    • Implementation of TQM in a consulting engineering firm
    • Culp, G. (1993), "Implementation of TQM in a consulting engineering firm", ASCE Journal of Management in Engineering, Vol. 9 No. 4, pp. 340-66.
    • (1993) ASCE Journal of Management in Engineering , vol.9 , Issue.4 , pp. 340-366
    • Culp, G.1
  • 25
    • 4143074659 scopus 로고
    • Implementation of ISO 9000 in construction
    • November, Gold Coast, Australia
    • Cusack, D. (1992), "Implementation of ISO 9000 in construction", ISO 9000 Forum Symposium, November, Gold Coast, Australia.
    • (1992) ISO 9000 Forum Symposium
    • Cusack, D.1
  • 27
    • 4143084812 scopus 로고
    • Building Research Establishment, Current Paper CP 18/73, Watford, UK
    • Dalty, C.D. and Crawshaw, D.T. (1973), Working Drawings in Use, Building Research Establishment, Current Paper CP 18/73, Watford, UK.
    • (1973) Working Drawings in Use
    • Dalty, C.D.1    Crawshaw, D.T.2
  • 28
    • 0038515886 scopus 로고    scopus 로고
    • Department of Industry Science and Tourism, Commonwealth of Australia Publication, February, Canberra, Australia
    • Department of Industry Science and Tourism (DIST) (1998), Building for Growth: A Draft Strategy for the Building and Construction Industry, Department of Industry Science and Tourism, Commonwealth of Australia Publication, February, Canberra, Australia.
    • (1998) Building for Growth: A Draft Strategy for the Building and Construction Industry
  • 29
    • 4143059076 scopus 로고    scopus 로고
    • Building for Growth: An Action Agenda for the Building and Construction Industries. The Department of Industry Science and Tourism, Canberra, Australia
    • Department of Industry Science and Tourism (DIST) (1999), A Report for Government by the National Building and Construction Committee, Building for Growth: An Action Agenda for the Building and Construction Industries. The Department of Industry Science and Tourism, Canberra, Australia.
    • (1999) A Report for Government by the National Building and Construction Committee
  • 30
    • 0442295628 scopus 로고    scopus 로고
    • Evaluating outcomes from ISO 9000-certified quality systems of Hong Kong contractors
    • Dissanayaka, S.M., Kurmaraswamy, M.M., Karim, K. and Marosszkey, M. (2001), "Evaluating outcomes from ISO 9000-certified quality systems of Hong Kong contractors", Total Quality Management, Vol. 12 No. 1, pp. 29-40.
    • (2001) Total Quality Management , vol.12 , Issue.1 , pp. 29-40
    • Dissanayaka, S.M.1    Kurmaraswamy, M.M.2    Karim, K.3    Marosszkey, M.4
  • 32
    • 4143080221 scopus 로고
    • Management of design documentation, where do we go from here?
    • Wakefield, R.R. and Carmichael, D.G. (eds). Balkema, Rotterdam
    • Gardiner, J. (1994), "Management of design documentation, where do we go from here?", in Wakefield, R.R. and Carmichael, D.G. (eds). Construction and Management, Recent Advances, Balkema, Rotterdam, pp. 113-18.
    • (1994) Construction and Management, Recent Advances , pp. 113-118
    • Gardiner, J.1
  • 36
    • 4143128716 scopus 로고
    • Source Document 108, Construction Industry Institute, The University of Texas at Austin, Tx
    • Ibbs, C.W. and Allen, W.E. (1993), Quantitative Impacts of Project Change, Source Document 108, Construction Industry Institute, The University of Texas at Austin, Tx.
    • (1993) Quantitative Impacts of Project Change
    • Ibbs, C.W.1    Allen, W.E.2
  • 37
    • 0001845897 scopus 로고
    • The role of managerial actions in the cost, time and quality performance of high rise commercial projects
    • Ireland, V. (1985), "The role of managerial actions in the cost, time and quality performance of high rise commercial projects", Construction Management and Economics, Vol. 3 No. 1, pp. 59-87.
    • (1985) Construction Management and Economics , vol.3 , Issue.1 , pp. 59-87
    • Ireland, V.1
  • 38
    • 79959628100 scopus 로고    scopus 로고
    • Human factors in the Australian construction industry: Towards total quality management
    • Jaafari, A. (1996), "Human factors in the Australian construction industry: towards total quality management", Australian Journal of Management, Vol. 21 No. 2, pp. 159-85.
    • (1996) Australian Journal of Management , vol.21 , Issue.2 , pp. 159-185
    • Jaafari, A.1
  • 39
    • 0343038761 scopus 로고
    • Quality management in the Australian construction industry
    • Wakefield, R.R. and Carmichael, D.G. (Eds), Balkema, Rotterdam
    • Jaafari, A., Chan, MA and Cassab, R. (1994), "Quality management in the Australian construction industry", in Wakefield, R.R. and Carmichael, D.G. (Eds), Construction and Management, Recent Advances, Balkema, Rotterdam, pp. 89-112.
    • (1994) Construction and Management, Recent Advances , pp. 89-112
    • Jaafari, A.1    Chan, M.A.2    Cassab, R.3
  • 41
    • 0032593163 scopus 로고    scopus 로고
    • The causes and costs of defects in construction. A study of seven building projects
    • Josephson, P-E. and Hammarlund, Y. (1999), "The causes and costs of defects in construction. A study of seven building projects", Automation in Construction, Vol. 8 No. 6.
    • (1999) Automation in Construction , vol.8 , Issue.6
    • Josephson, P.-E.1    Hammarlund, Y.2
  • 42
    • 4143067931 scopus 로고    scopus 로고
    • Illustrative benchmarking rework and rework costs in Swedish construction industry
    • Josephson, P-E., Larsson, B. and Li, H. (2002), "Illustrative benchmarking rework and rework costs in Swedish construction industry", ASCE Journal of Management in Engineering, Vol. 18 No. 2, pp. 76-83.
    • (2002) ASCE Journal of Management in Engineering , vol.18 , Issue.2 , pp. 76-83
    • Josephson, P.-E.1    Larsson, B.2    Li, H.3
  • 43
    • 2142703708 scopus 로고    scopus 로고
    • A comparative study of ISO 9000 quality management systems in the construction industry: Australia, Hong Kong, and Singapore
    • 25-27 April, Shangri-La's Rasa Sentosa Resort, Singapore
    • Karim, K., Marosszkey, M., Chung, H.W., Kurmaraswamy, M. and Low, S.P. (2000), "A comparative study of ISO 9000 quality management systems in the construction industry: Australia, Hong Kong, and Singapore", Proceedings of the Fifth International Conference on ISO 9000 and TQM, 25-27 April, Shangri-La's Rasa Sentosa Resort, Singapore, pp. 440-4.
    • (2000) Proceedings of the Fifth International Conference on ISO 9000 and TQM , pp. 440-444
    • Karim, K.1    Marosszkey, M.2    Chung, H.W.3    Kurmaraswamy, M.4    Low, S.P.5
  • 44
    • 0031642811 scopus 로고    scopus 로고
    • Visualisation of building interior design to reduce rework
    • School of Oriental and African Studies, University of London, 29-31 July, London
    • Li, H. and Love, P.E.D. (1998), "Visualisation of building interior design to reduce rework", Proceedings of the International Conference on Information Visualisation, School of Oriental and African Studies, University of London, 29-31 July, London, pp. 187-91.
    • (1998) Proceedings of the International Conference on Information Visualisation , pp. 187-191
    • Li, H.1    Love, P.E.D.2
  • 45
    • 0043191027 scopus 로고    scopus 로고
    • Engineers Australia
    • Lomas, K. (1996), Quality Pays, Engineers Australia, p. 26.
    • (1996) Quality Pays , pp. 26
    • Lomas, L.K.1
  • 46
    • 0042689966 scopus 로고    scopus 로고
    • Influence of project type and procurement method on rework costs in building construction projects
    • Love, P.E.D. (2002a), "Influence of project type and procurement method on rework costs in building construction projects", ASCE Journal of Construction Engineering and Management, Vol. 128 No. 1, pp. 18-29.
    • (2002) ASCE Journal of Construction Engineering and Management , vol.128 , Issue.1 , pp. 18-29
    • Love, P.E.D.1
  • 47
    • 84986104505 scopus 로고    scopus 로고
    • Auditing the indirect consequences of rework in construction: A case based approach
    • Love, P.E.D. (2002b), "Auditing the indirect consequences of rework in construction: a case based approach", Managerial Auditing Journal, Vol. 17 No. 3, pp. 138-46.
    • (2002) Managerial Auditing Journal , vol.17 , Issue.3 , pp. 138-146
    • Love, P.E.D.1
  • 48
    • 0042131539 scopus 로고    scopus 로고
    • A project management quality cost information system for construction
    • Love, P.E.D. and Irani, Z. (2003), "A project management quality cost information system for construction", Information and Management, Vol. 40, pp. 649-61.
    • (2003) Information and Management , vol.40 , pp. 649-661
    • Love, P.E.D.1    Irani, Z.2
  • 49
    • 2642539100 scopus 로고    scopus 로고
    • Benchmarking, bench-action and bench-learning: Rework mitigation in projects
    • Love, P.E.D. and Smith, J. (2003), "Benchmarking, bench-action and bench-learning: rework mitigation in projects", ASCE Journal of Management in Engineering, Vol. 19 No. 4, pp. 147-59.
    • (2003) ASCE Journal of Management in Engineering , vol.19 , Issue.4 , pp. 147-159
    • Love, P.E.D.1    Smith, J.2
  • 51
    • 2542461920 scopus 로고    scopus 로고
    • Learning to reduce rework in projects: Analysis of firms learning and quality practices
    • Love, P.E.D., Irani, Z. and Edwards, D. (2003), "Learning to reduce rework in projects: analysis of firms learning and quality practices", Project Management Journal, Vol. 34 No. 3, pp. 13-25.
    • (2003) Project Management Journal , vol.34 , Issue.3 , pp. 13-25
    • Love, P.E.D.1    Irani, Z.2    Edwards, D.3
  • 54
    • 0000611906 scopus 로고    scopus 로고
    • Selecting a suitable procurement method for a building project
    • Love, P.E.D., Skitmore, R.M. and Earl, G. (1998), "Selecting a suitable procurement method for a building project", Construction Management and Economics, Vol. 16 No. 2, pp. 221-33.
    • (1998) Construction Management and Economics , vol.16 , Issue.2 , pp. 221-233
    • Love, P.E.D.1    Skitmore, R.M.2    Earl, G.3
  • 55
    • 2142718584 scopus 로고    scopus 로고
    • Modelling the dynamics of design error induced rework in construction
    • Love, P.E.D., Mandal, P., Smith, J. and Li, H. (2000), "Modelling the dynamics of design error induced rework in construction", Construction Management and Economics, Vol. 18 No. 5, pp. 575-86.
    • (2000) Construction Management and Economics , vol.18 , Issue.5 , pp. 575-586
    • Love, P.E.D.1    Mandal, P.2    Smith, J.3    Li, H.4
  • 56
    • 0039688676 scopus 로고
    • Influences of the client, designer and procurement methods on project performance
    • 4-7 December, East Meets West, Department of Surveying, The University of Hong Kong, Hong Kong
    • Naoum, S. and Mustapha, F.H. (1994), "influences of the client, designer and procurement methods on project performance", Proceedings of CIB W-92 Procurement Systems Symposium, 4-7 December, East Meets West, Department of Surveying, The University of Hong Kong, Hong Kong, pp. 221-8.
    • (1994) Proceedings of CIB W-92 Procurement Systems Symposium , pp. 221-228
    • Naoum, S.1    Mustapha, F.H.2
  • 57
    • 0011269229 scopus 로고
    • Millbank, London, UK
    • National Economic Development Office (NEDO) (1987), Achieving Quality on Building Sites, Millbank, London, UK, pp. 18-19.
    • (1987) Achieving Quality on Building Sites , pp. 18-19
  • 58
    • 0003853476 scopus 로고
    • Millbank, London, UK
    • National Economic Development Office (NEDO) (1988), Faster Building for Commerce, Millbank, London, UK.
    • (1988) Faster Building for Commerce
  • 62
    • 85011453113 scopus 로고    scopus 로고
    • Responding to marginalisation
    • Powell, C. (1997), "Responding to marginalisation", Architectural Research Quarterly, Vol. 2, pp. 84-9.
    • (1997) Architectural Research Quarterly , vol.2 , pp. 84-89
    • Powell, C.1
  • 65
    • 0032048057 scopus 로고    scopus 로고
    • Quality, waste, and cost consideration in architectural building design management
    • Rounce, G. (1998), "Quality, waste, and cost consideration in architectural building design management". International Journal of Project Management, Vol. 16 No. 2, pp. 123-7.
    • (1998) International Journal of Project Management , vol.16 , Issue.2 , pp. 123-127
    • Rounce, G.1
  • 77
    • 0003688603 scopus 로고
    • unpublished PhD thesis, Department of Building and Construction Economics, Faculty of Environmental Design and Construction, Royal Melbourne Institute of Technology, Melbourne, Australia
    • Walker, D.H.T. (1994), "An investigation into the factors that determine building construction time performance", unpublished PhD thesis, Department of Building and Construction Economics, Faculty of Environmental Design and Construction, Royal Melbourne Institute of Technology, Melbourne, Australia.
    • (1994) An Investigation into the Factors That Determine Building Construction Time Performance
    • Walker, D.H.T.1
  • 78
    • 4143094721 scopus 로고
    • Procurement alternatives
    • Autumn, Nottingham: Faculty of Building Ltd
    • Watkinson, E.D. (1992), "Procurement alternatives", Faculty of Building Journal, Autumn, Nottingham: Faculty of Building Ltd, pp. 4-6.
    • (1992) Faculty of Building Journal , pp. 4-6
    • Watkinson, E.D.1
  • 79
    • 4143124331 scopus 로고
    • Early warning signs of project changes
    • Construction Industry Institute, The University of Texas at Austin, Texas, USA
    • Zeitoun, A. and Oberlander, G. (1993), "Early warning signs of project changes", Source Document 91, Construction Industry Institute, The University of Texas at Austin, Texas, USA.
    • (1993) Source Document , vol.91
    • Zeitoun, A.1    Oberlander, G.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.