-
1
-
-
0002444471
-
The cost of non-conformance during a high-way project: A case study
-
Abdul-Rahman, H. (1995). "The cost of non-conformance during a high-way project: A case study." Constr. Manage. Econom., 13, 23-32.
-
(1995)
Constr. Manage. Econom.
, vol.13
, pp. 23-32
-
-
Abdul-Rahman, H.1
-
2
-
-
0003764618
-
-
Richard D. Irwin, Inc., Homewood, Ill.
-
Alreck, P. L., and Settle, R. B. (1985). "The survey research handbook." Richard D. Irwin, Inc., Homewood, Ill.
-
(1985)
The Survey Research Handbook
-
-
Alreck, P.L.1
Settle, R.B.2
-
4
-
-
0001326664
-
The cost of quality failures in major civil engineering projects
-
Barber, P., Sheath, D., Tomkins, C., and Graves, A. (2000). "The cost of quality failures in major civil engineering projects." Int. J. Quality Reliability Manage., 17(4/5), 479-492.
-
(2000)
Int. J. Quality Reliability Manage.
, vol.17
, Issue.4-5
, pp. 479-492
-
-
Barber, P.1
Sheath, D.2
Tomkins, C.3
Graves, A.4
-
5
-
-
13944269303
-
The effectiveness of building procurement systems in the attainment of client objectives
-
Univ. of Montreal, Montreal, 18th-22nd May
-
Bowen, P. A., Hindle, R. D., and Pearl, R. (1997). "The effectiveness of building procurement systems in the attainment of client objectives." Proc., CIB W-92 Procurement Symposium, Procurement - The Key to Innovation, Univ. of Montreal, Montreal, 18th-22nd May, 39-49.
-
(1997)
Proc., CIB W-92 Procurement Symposium, Procurement - The Key to Innovation
, pp. 39-49
-
-
Bowen, P.A.1
Hindle, R.D.2
Pearl, R.3
-
6
-
-
4143115568
-
Performance on site and the building client
-
Chartered Institute of Building, Ascot, U.K.
-
Bresnen, M. J., Haslam, C. O., Beardsworth, A. D., Bryman, A. E., and Hell, T. E. (1988). "Performance on site and the building client." Occasional Paper 42, Chartered Institute of Building, Ascot, U.K.
-
(1988)
Occasional Paper
, vol.42
-
-
Bresnen, M.J.1
Haslam, C.O.2
Beardsworth, A.D.3
Bryman, A.E.4
Hell, T.E.5
-
8
-
-
0026837054
-
Causes of quality deviations in design and construction
-
Burati, J. L., Farrington, J. J., and Ledbetter, W. B. (1992). "Causes of quality deviations in design and construction." J. Constr. Eng. Manage., 118(1), 34-49.
-
(1992)
J. Constr. Eng. Manage.
, vol.118
, Issue.1
, pp. 34-49
-
-
Burati, J.L.1
Farrington, J.J.2
Ledbetter, W.B.3
-
10
-
-
0000843382
-
Enhanced design and build - An innovative system to procure a hospital project
-
January 25th-28th Chiang Mai, Thailand
-
Chan, A. P. C., Yu, A. N. T., and Tam, C. M. (1999). "Enhanced design and build - An innovative system to procure a hospital project." Proc., CIB W-92 Procurement Symposium - Harmony and Profit, January 25th-28th Chiang Mai, Thailand, 405-415.
-
(1999)
Proc., CIB W-92 Procurement Symposium - Harmony and Profit
, pp. 405-415
-
-
Chan, A.P.C.1
Yu, A.N.T.2
Tam, C.M.3
-
12
-
-
0004603683
-
A quantitative study of post contract award design changes in construction
-
Cox, I. D., Morris, J., Rogerson, J. H., and Jared, G. E. (1999). "A quantitative study of post contract award design changes in construction." Constr. Manage. Econom., 17(4), pp
-
(1999)
Constr. Manage. Econom.
, vol.17
, Issue.4
-
-
Cox, I.D.1
Morris, J.2
Rogerson, J.H.3
Jared, G.E.4
-
13
-
-
84930774438
-
Measuring design and construction quality costs
-
Davis, K., Ledbetter, W. B., and Burati, Jr., J. L., (1989). "Measuring design and construction quality costs." J. Constr. Eng. Manage., 115(3), 385-400.
-
(1989)
J. Constr. Eng. Manage.
, vol.115
, Issue.3
, pp. 385-400
-
-
Davis, K.1
Ledbetter, W.B.2
Burati Jr., J.L.3
-
14
-
-
0030569924
-
Towards a concurrent engineering model for design-and-build projects
-
Evbuomwan, N. F. O., and Anumba, C. J. (1996). "Towards a concurrent engineering model for design-and-build projects," Struct. Eng., 74(5), 73-78.
-
(1996)
Struct. Eng.
, vol.74
, Issue.5
, pp. 73-78
-
-
Evbuomwan, N.F.O.1
Anumba, C.J.2
-
15
-
-
0032656251
-
Impact of change orders on the labor efficiency for mechanical contractors
-
Hanna, A., Russell, J. S., Gotzin, T. W., and Nordheim, E. V. (1999). "Impact of change orders on the labor efficiency for mechanical contractors." J. Constr. Eng. Manage., 125(3), 176-184.
-
(1999)
J. Constr. Eng. Manage.
, vol.125
, Issue.3
, pp. 176-184
-
-
Hanna, A.1
Russell, J.S.2
Gotzin, T.W.3
Nordheim, E.V.4
-
16
-
-
13944256001
-
Clients' criteria on the experience of procurement systems - A Malaysian experience
-
Univ. of Montreal, Montreal, 18th-22nd May
-
Hashim, M. (1997). "Clients' criteria on the experience of procurement systems - A Malaysian experience." Proc., of the CIB W-92 Procurement Symposium, Procurement - The Key to Innovation, Univ. of Montreal, Montreal, 18th-22nd May, 273-284.
-
(1997)
Proc., of the CIB W-92 Procurement Symposium, Procurement - The Key to Innovation
, pp. 273-284
-
-
Hashim, M.1
-
17
-
-
0040941588
-
Construction changes and change orders: Their magnitude and impact
-
Construction Industry Institute, Univ. of Texas at Austin, Austin, Tex.
-
Hester, W. T., Kuprenas, J. A., and Chang, T. C. (1991). "Construction changes and change orders: Their magnitude and impact." Source Document 66, Construction Industry Institute, Univ. of Texas at Austin, Austin, Tex.
-
(1991)
Source Document
, vol.66
-
-
Hester, W.T.1
Kuprenas, J.A.2
Chang, T.C.3
-
18
-
-
0003471087
-
-
Houghton-Mifflin, Boston
-
Hinkle, D. E., Wiersma, W., and Jurs, S. G. (1988). Applied statistics for the behavioural sciences. 2nd Ed., Houghton-Mifflin, Boston.
-
(1988)
Applied Statistics for the Behavioural Sciences. 2nd Ed.
-
-
Hinkle, D.E.1
Wiersma, W.2
Jurs, S.G.3
-
19
-
-
0033438622
-
Limits to concurrency
-
Hoedemaker, G. M., Blackburn, J. D., and Van Wassenhove, L. N. (1999). "Limits to concurrency." Decision Sci., 30(1), 1-17.
-
(1999)
Decision Sci.
, vol.30
, Issue.1
, pp. 1-17
-
-
Hoedemaker, G.M.1
Blackburn, J.D.2
Van Wassenhove, L.N.3
-
20
-
-
2342638600
-
Survey findings on UK construction procurement: Is it achieving lowest cost, or value?
-
Holt, G. D., Proverbs, D., and Love, P. E. D. (2000). "Survey findings on UK construction procurement: Is it achieving lowest cost, or value?" Asia Pac. Building Construct. Manage. J., 5, 13-20.
-
(2000)
Asia Pac. Building Construct. Manage. J.
, vol.5
, pp. 13-20
-
-
Holt, G.D.1
Proverbs, D.2
Love, P.E.D.3
-
21
-
-
11344268966
-
Quantitative impacts of project change
-
Construction Industry Institute, Univ. of Texas at Austin, Austin, Tex.
-
Ibbs, C. W., and Allen, W. E. (1995). "Quantitative impacts of project change." Source Document 108, Construction Industry Institute, Univ. of Texas at Austin, Austin, Tex.
-
(1995)
Source Document
, vol.108
-
-
Ibbs, C.W.1
Allen, W.E.2
-
22
-
-
12444256858
-
-
Estimating Information Service, 34, Autumn. Institute of Building, Ascot, U.K.
-
Institute of Building. (1979). Contractor selection - A guide to good practice. Estimating Information Service, 34, Autumn. Institute of Building, Ascot, U.K.
-
(1979)
Contractor Selection - A Guide to Good Practice
-
-
-
23
-
-
0025494340
-
Predictors of cost-overrun rates
-
Jahren, C. T., and Asha, A. M. (1990). "Predictors of cost-overrun rates." J. Constr. Eng. Manage., 116(3), 548-552.
-
(1990)
J. Constr. Eng. Manage.
, vol.116
, Issue.3
, pp. 548-552
-
-
Jahren, C.T.1
Asha, A.M.2
-
24
-
-
0032593163
-
The causes and costs of defects in construction. A study of seven building projects
-
Josephson, P.-E., and Hammarlund, Y. (1999). "The causes and costs of defects in construction. A study of seven building projects." Autom. Constr., 8(6), 681-642.
-
(1999)
Autom. Constr.
, vol.8
, Issue.6
, pp. 681-1642
-
-
Josephson, P.-E.1
Hammarlund, Y.2
-
27
-
-
13944265771
-
Construction procurement systems in the Asia Pacific countries
-
Lam, P. T. I., and Chan, A. P. C. (1995). "Construction procurement systems in the Asia Pacific countries." Australian Project Manager, 16(2), 12-17.
-
(1995)
Australian Project Manager
, vol.16
, Issue.2
, pp. 12-17
-
-
Lam, P.T.I.1
Chan, A.P.C.2
-
28
-
-
0032342510
-
Concurrent engineering: A strategy for procuring construction projects
-
Love, P. E. D., Gunasekaran, A., and Li, H. (1998a). "Concurrent engineering: A strategy for procuring construction projects." Int. J. Proj. Manage., 16(6), 375-383.
-
(1998)
Int. J. Proj. Manage.
, vol.16
, Issue.6
, pp. 375-383
-
-
Love, P.E.D.1
Gunasekaran, A.2
Li, H.3
-
29
-
-
13944274245
-
Overcoming the problems associated with quality certification
-
Love, P. E. D., and Li, H. (2000a). "Overcoming the problems associated with quality certification." Constr. Manage. Econom., 18(2), 139-149.
-
(2000)
Constr. Manage. Econom.
, vol.18
, Issue.2
, pp. 139-149
-
-
Love, P.E.D.1
Li, H.2
-
30
-
-
0000797825
-
Quantifying the causes and costs of rework in construction
-
Love, P. E. D., and Li, H. (2000b). "Quantifying the causes and costs of rework in construction." Constr. Manage. Econom., 18(4), 479-490.
-
(2000)
Constr. Manage. Econom.
, vol.18
, Issue.4
, pp. 479-490
-
-
Love, P.E.D.1
Li, H.2
-
31
-
-
13944280445
-
Construction rework: The multiplier effect in practice
-
HK Baptist Univ. & Productivity & Quality Research Centre, National Univ. of Singapore, Singapore
-
Love, P. E. D., Li, H., and Irani, Z. (2000c). "Construction rework: The multiplier effect in practice." 5th Int. Conf. on ISO 9000 & TQM School of Business, HK Baptist Univ. & Productivity & Quality Research Centre, National Univ. of Singapore, Singapore, 435-439.
-
(2000)
5th Int. Conf. on ISO 9000 & TQM School of Business
, pp. 435-439
-
-
Love, P.E.D.1
Li, H.2
Irani, Z.3
-
32
-
-
0001187120
-
Determining the causal structure of rework in construction projects
-
Love, P. E. D., Mandal, P., and Li, H. (1999). "Determining the causal structure of rework in construction projects." Constr. Manage. Econom., 17(4), 505-517.
-
(1999)
Constr. Manage. Econom.
, vol.17
, Issue.4
, pp. 505-517
-
-
Love, P.E.D.1
Mandal, P.2
Li, H.3
-
33
-
-
2142718584
-
Modelling the dynamics of design error induced rework in construction
-
Love, P. E. D., Mandal, P., Smith, J., and Li, H. (2000a). "Modelling the dynamics of design error induced rework in construction." Constr. Manage. Econom., 18(5), 575-586.
-
(2000)
Constr. Manage. Econom.
, vol.18
, Issue.5
, pp. 575-586
-
-
Love, P.E.D.1
Mandal, P.2
Smith, J.3
Li, H.4
-
34
-
-
0000611906
-
Selecting a suitable procurement method for a building project
-
Love, P. E. D., Skitmore, R. M., and Earl, G. (1998b). "Selecting a suitable procurement method for a building project." Constr. Manage. Econom., 16(2), 221-233.
-
(1998)
Constr. Manage. Econom.
, vol.16
, Issue.2
, pp. 221-233
-
-
Love, P.E.D.1
Skitmore, R.M.2
Earl, G.3
-
35
-
-
84993086760
-
Some empirical observations of service quality in construction
-
Love, P. E. D., Smith, J., Treloar, G., and Li, H. (2000b). "Some empirical observations of service quality in construction." Eng. Constr. Architectural Manage., 7(2), 191-201.
-
(2000)
Eng. Constr. Architectural Manage.
, vol.7
, Issue.2
, pp. 191-201
-
-
Love, P.E.D.1
Smith, J.2
Treloar, G.3
Li, H.4
-
36
-
-
4143063528
-
Communication and rework: Case studies of construction projects
-
Australia
-
Love, P. E. D., and Wyatt, A. D. (1997). "Communication and rework: Case studies of construction projects." CSIRO, DBCE DOC 97/38 (B), Australia.
-
(1997)
CSIRO, DBCE DOC
, vol.97
, Issue.38 B
-
-
Love, P.E.D.1
Wyatt, A.D.2
-
37
-
-
0000421913
-
A construction quality costs quantifying system for the building industry
-
Low, S. P., and Yeo, H. K. C. (1998). "A construction quality costs quantifying system for the building industry." Int. J. Quality Reliability Manage., 15(3), 329-349.
-
(1998)
Int. J. Quality Reliability Manage.
, vol.15
, Issue.3
, pp. 329-349
-
-
Low, S.P.1
Yeo, H.K.C.2
-
38
-
-
0008842494
-
Design decision-making in architectural practice
-
Institute of Advanced Architectural Studies, Univ. of York, U.K.
-
Mackinder, M., and Marvin, H. (1982). "Design decision-making in architectural practice." Research Paper 19, Institute of Advanced Architectural Studies, Univ. of York, U.K.
-
(1982)
Research Paper
, vol.19
-
-
Mackinder, M.1
Marvin, H.2
-
40
-
-
0039688676
-
Influences of the client, designer and procurement methods on project performance
-
Department of Surveying, Univ. of Hong Kong, Hong Kong
-
Naoum, S., and Mustapha, F. H. (1994). "Influences of the client, designer and procurement methods on project performance." Proc., CIB W-92 Procurement Systems Symposium, East Meets West, Department of Surveying, Univ. of Hong Kong, Hong Kong, 221-228.
-
(1994)
Proc., CIB W-92 Procurement Systems Symposium, East Meets West
, pp. 221-228
-
-
Naoum, S.1
Mustapha, F.H.2
-
41
-
-
0003853476
-
-
HMSO, London
-
National Economic Development Office (NEDO). (1988). "Faster building for commerce." HMSO, London.
-
(1988)
Faster Building for Commerce
-
-
-
42
-
-
4244208223
-
-
Licentiate thesis, Division of Construction Management and Economics, Department of Real Estate and Construction Management, Royal Institute of Technology, Stockholm, Sweden
-
Nylén, K.-O. (1996). "Cost of failure in a major civil engineering project." Licentiate thesis, Division of Construction Management and Economics, Department of Real Estate and Construction Management, Royal Institute of Technology, Stockholm, Sweden.
-
(1996)
Cost of Failure in a Major Civil Engineering Project
-
-
Nylén, K.-O.1
-
45
-
-
0347234955
-
The insensitivity of the procurement processes in the UK construction industry to the problems of the occasional buyers from the industry
-
Univ. of Montreal, Montreal, Canada
-
Sharif, A., and Morledge, R. (1997). "The insensitivity of the procurement processes in the UK construction industry to the problems of the occasional buyers from the industry." Proc., CIB W-92 Procurement Symposium, Procurement - A Key to Innovation, Univ. of Montreal, Montreal, Canada, 693-703.
-
(1997)
Proc., CIB W-92 Procurement Symposium, Procurement - A Key to Innovation
, pp. 693-703
-
-
Sharif, A.1
Morledge, R.2
-
46
-
-
13944275055
-
Design and documentation quality survey designers' perspectives
-
CSIRO - Building, Construction and Engineering, Melbourne, Australia
-
Tilley, P. A., and McFallan, S. L. (2000). "Design and documentation quality survey designers' perspectives." BCE DOC 00/113. CSIRO - Building, Construction and Engineering, Melbourne, Australia.
-
(2000)
BCE DOC
, vol.113
-
-
Tilley, P.A.1
McFallan, S.L.2
-
48
-
-
0003688603
-
-
PhD thesis, Department of-Building and Construction Economics, Faculty of Environmental De sign and Construction, Royal Melbourne Institute of Technology, Melbourne, Australia
-
Walker, D. H. T. (1994). "An investigation into the factors that determine building construction time performance." PhD thesis, Department of-Building and Construction Economics, Faculty of Environmental De sign and Construction, Royal Melbourne Institute of Technology, Melbourne, Australia.
-
(1994)
An Investigation into the Factors that Determine Building Construction Time Performance
-
-
Walker, D.H.T.1
-
49
-
-
4143094721
-
Procurement alternatives
-
Autumn. Nottingham, U.K.
-
Watkinson, E. D. (1992). "Procurement alternatives." Faculty of Building Journal, Autumn. Nottingham, U.K. 4-6.
-
(1992)
Faculty of Building Journal
, pp. 4-6
-
-
Watkinson, E.D.1
-
50
-
-
4143124331
-
Early warning signs of project changes
-
Construction Industry Institute, Univ. of Texas at Austin, Austin, Tex.
-
Zeitoun, A. A., and Oberlander, G. D. (1993). "Early warning signs of project changes." Source Document 91, Construction Industry Institute, Univ. of Texas at Austin, Austin, Tex.
-
(1993)
Source Document
, vol.91
-
-
Zeitoun, A.A.1
Oberlander, G.D.2
|