Volumn 20, Issue 8, 2011, Pages 1051-1059

Incorporating rework into construction schedule analysis

Author keywords

Acceleration; Computer application; Construction management; Cost; Delay analysis; Optimization; Rework; Scheduling

Indexed keywords

CONSTRUCTION MANAGEMENT; CONSTRUCTION PROJECTS; CONSTRUCTION SCHEDULES; CORRECTIVE ACTIONS; COST AND SCHEDULE; COST EFFECTIVE; DELAY ANALYSIS; OPTIMIZATION TECHNIQUES; PROJECT DELAYS; QUANTITATIVE APPROACH; RESEARCH EFFORTS; REWORK; SCHEDULE DELAY;

EID: 80053638754     PISSN: 09265805     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.autcon.2011.04.006     Document Type: Article
Times cited : (43)

References (29)
  • 1
    • 0002444471 scopus 로고
    • The cost of non-conformance during a highway project: A case study
    • H. Abdul-Rahman The cost of non-conformance during a highway project: a case study Constr. Mgmt. Econ. 13 1 1995 23 32
    • (1995) Constr. Mgmt. Econ. , vol.13 , Issue.1 , pp. 23-32
    • Abdul-Rahman, H.1
  • 2
    • 32644462382 scopus 로고    scopus 로고
    • Selecting a delay analysis method in resolving construction claims
    • DOI 10.1016/j.ijproman.2005.08.005, PII S0263786305000906
    • D. Arditi, and T. Pattanakitchamroon Selecting a delay analysis method in resolving construction claims Int. J. Proj. Mgmt. 24 2 2006 145 155 (Pubitemid 43246170)
    • (2006) International Journal of Project Management , vol.24 , Issue.2 , pp. 145-155
    • Arditi, D.1    Pattanakitchamroon, T.2
  • 6
    • 0003805578 scopus 로고
    • Construction Industry Institute (CII) The Univ. of Texas at Austin Austin, Texas RS 10-1 (Jan.)
    • Construction Industry Institute (CII) Costs of quality deviations in design and construction 1989 The Univ. of Texas at Austin Austin, Texas RS 10-1 (Jan.)
    • (1989) Costs of Quality Deviations in Design and Construction
  • 7
    • 0001906688 scopus 로고
    • The rework cycle: Benchmarks for the project manager
    • K.G. Cooper The rework cycle: benchmarks for the project manager Proj. Mgmt. J. 24 1 1993 17 21
    • (1993) Proj. Mgmt. J. , vol.24 , Issue.1 , pp. 17-21
    • Cooper, K.G.1
  • 9
    • 0033096878 scopus 로고    scopus 로고
    • Window analysis of compensable delays
    • M. Finke Window analysis of compensable delays J. Constr. Engrg. and Mgmt. ASCE 125 2 1999 96 100
    • (1999) J. Constr. Engrg. and Mgmt. ASCE , vol.125 , Issue.2 , pp. 96-100
    • Finke, M.1
  • 10
    • 33751371489 scopus 로고    scopus 로고
    • Simplified project management for construction practitioners
    • T. Hegazy "Simplified project management for construction practitioners" Cost Eng. J. AACE Int. 48 11 2006 20 28 (Pubitemid 44813160)
    • (2006) Cost Engineering (Morgantown, West Virginia) , vol.48 , Issue.11 , pp. 20-28
    • Hegazy, T.1
  • 12
    • 47749097935 scopus 로고    scopus 로고
    • Delay analysis under multiple baseline updates
    • T. Hegazy, and W. Menesi Delay analysis under multiple baseline updates J. Constr. Engrg. and Mgmt. 134 8 2008 575 582
    • (2008) J. Constr. Engrg. and Mgmt. , vol.134 , Issue.8 , pp. 575-582
    • Hegazy, T.1    Menesi, W.2
  • 15
    • 33846309085 scopus 로고    scopus 로고
    • Introductory concepts in delay claims
    • S. Holloway Introductory concepts in delay claims Constr. Law and Business. 2 6 2002 3 6
    • (2002) Constr. Law and Business. , vol.2 , Issue.6 , pp. 3-6
    • Holloway, S.1
  • 17
    • 0032593163 scopus 로고    scopus 로고
    • The causes and costs of defects in construction: A study of seven building projects
    • P.E. Josephson, and Y. Hammarlund The causes and costs of defects in construction: a study of seven building projects Automation in Construction 8 6 1999 681 687
    • (1999) Automation in Construction , vol.8 , Issue.6 , pp. 681-687
    • Josephson, P.E.1    Hammarlund, Y.2
  • 18
    • 0033342184 scopus 로고    scopus 로고
    • Generic methodology for analyzing delay claims
    • DOI 10.1061/(ASCE)0733-9364(1999)125:6(409)
    • S. Kartam Generic methodology for analyzing delay claims J. Constr. Engrg. and Mgmt. ASCE 125 6 1999 409 419 (Pubitemid 30509595)
    • (1999) Journal of Construction Engineering and Management , vol.125 , Issue.6 , pp. 409-419
    • Kartam, S.1
  • 19
    • 77149177666 scopus 로고    scopus 로고
    • Rework in civil infrastructure projects: Determination of cost predictors
    • P.E.D. Love, D.J. Edwards, H. Watson, and P. Davis "Rework in civil infrastructure projects: determination of cost predictors" J. Constr. Engrg. and Mgmt. ASCE 136 3 2010 275 282
    • (2010) J. Constr. Engrg. and Mgmt. ASCE , vol.136 , Issue.3 , pp. 275-282
    • Love, P.E.D.1    Edwards, D.J.2    Watson, H.3    Davis, P.4
  • 20
    • 27944504058 scopus 로고    scopus 로고
    • Forensic project management: The underlying causes of rework in construction projects
    • DOI 10.1080/10286600412331295955, PII XG0Y761JXKWEY0PP
    • P.E.D. Love, and D. Edwards Forensic project management: the underlying causes of rework in construction projects Civ. Eng. Environ. Syst. 12 3 2004 207 228 (Pubitemid 44121663)
    • (2004) Civil Engineering and Environmental Systems , vol.21 , Issue.3 , pp. 207-228
    • Love, P.1    Edwards, D.J.2
  • 21
    • 2642539100 scopus 로고    scopus 로고
    • Benchmarking, benchaction, and benchlearning: Rework mitigation in projects
    • DOI 10.1061/(ASCE)0742-597X(2003)19:4(147)
    • P.E.D. Love, and J. Smith Bench-marking, bench-action and bench-learning: rework mitigation in projects J. Mgmt. Eng. ASCE 19 4 2003 147 159 (Pubitemid 40337158)
    • (2003) Journal of Management in Engineering , vol.19 , Issue.4 , pp. 147-159
    • Love, P.E.D.1    Smith, J.2
  • 22
    • 0000797825 scopus 로고    scopus 로고
    • Quantifying the causes and costs of rework in construction
    • P.E.D. Love, and H. Li Quantifying the causes and costs of rework in construction Constr. Mgmt. Econ. 18 4 2000 479 490
    • (2000) Constr. Mgmt. Econ. , vol.18 , Issue.4 , pp. 479-490
    • Love, P.E.D.1    Li, H.2
  • 23
    • 0001187120 scopus 로고    scopus 로고
    • Determining the casual structure of rework influences in construction
    • P.E.D. Love, P. Mandal, and H. Li Determining the casual structure of rework influences in construction Constr. Mgmt. Econ. 17 4 1999 505 517
    • (1999) Constr. Mgmt. Econ. , vol.17 , Issue.4 , pp. 505-517
    • Love, P.E.D.1    Mandal, P.2    Li, H.3
  • 24
    • 36349001859 scopus 로고    scopus 로고
    • System dynamics applied to project management: A survey, assessment, and directions for future research
    • DOI 10.1002/sdr.377, Exploring tne Next Great Frontier: System Dynamics at 50
    • J.M. Lyneis, and D.N. Ford System dynamics applied to project management: a survey, assessment, and directions for future research Syst. Dyn. Rev. 23 2-3 2007 157 189 (Pubitemid 350148315)
    • (2007) System Dynamics Review , vol.23 , Issue.2-3 , pp. 157-189
    • Lyneis, J.M.1    Ford, D.N.2
  • 27
    • 0034225662 scopus 로고    scopus 로고
    • Schedule delay analysis
    • G.R. Stumpf Schedule delay analysis Cost. Eng. Jr. AACE Int 42 7 2000 32 43
    • (2000) Cost. Eng. Jr. AACE Int , vol.42 , Issue.7 , pp. 32-43
    • Stumpf, G.R.1
  • 29
    • 0042689966 scopus 로고    scopus 로고
    • Influence of project type and procurement method on rework costs in building construction projects
    • DOI 10.1061/(ASCE)0733-9364(2002)128:1(18)
    • P.E.D. Love Influence of Project Type and Procurement Method on Rework Costs in Building Construction Projects J. Constr. Engrg. and Mgmt. ASCE 128 1 2002 18 29 (Pubitemid 40264891)
    • (2002) Journal of Construction Engineering and Management , vol.128 , Issue.1 , pp. 18-29
    • Love, P.E.D.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.