-
1
-
-
0002444471
-
The cost of non-conformance during a highway project: A case study
-
H. Abdul-Rahman The cost of non-conformance during a highway project: a case study Constr. Mgmt. Econ. 13 1 1995 23 32
-
(1995)
Constr. Mgmt. Econ.
, vol.13
, Issue.1
, pp. 23-32
-
-
Abdul-Rahman, H.1
-
2
-
-
32644462382
-
Selecting a delay analysis method in resolving construction claims
-
DOI 10.1016/j.ijproman.2005.08.005, PII S0263786305000906
-
D. Arditi, and T. Pattanakitchamroon Selecting a delay analysis method in resolving construction claims Int. J. Proj. Mgmt. 24 2 2006 145 155 (Pubitemid 43246170)
-
(2006)
International Journal of Project Management
, vol.24
, Issue.2
, pp. 145-155
-
-
Arditi, D.1
Pattanakitchamroon, T.2
-
4
-
-
0001326664
-
Quality failure costs in civil engineering projects
-
P. Barber, A. Graves, M. Hall, D. Sheath, and C. Tomkins Quality failure costs in civil engineering projects Int. J. Qual. Reliab. Mgmt. 17 4/5 2000 479 492
-
(2000)
Int. J. Qual. Reliab. Mgmt.
, vol.17
, Issue.4-5
, pp. 479-492
-
-
Barber, P.1
Graves, A.2
Hall, M.3
Sheath, D.4
Tomkins, C.5
-
6
-
-
0003805578
-
-
Construction Industry Institute (CII) The Univ. of Texas at Austin Austin, Texas RS 10-1 (Jan.)
-
Construction Industry Institute (CII) Costs of quality deviations in design and construction 1989 The Univ. of Texas at Austin Austin, Texas RS 10-1 (Jan.)
-
(1989)
Costs of Quality Deviations in Design and Construction
-
-
-
7
-
-
0001906688
-
The rework cycle: Benchmarks for the project manager
-
K.G. Cooper The rework cycle: benchmarks for the project manager Proj. Mgmt. J. 24 1 1993 17 21
-
(1993)
Proj. Mgmt. J.
, vol.24
, Issue.1
, pp. 17-21
-
-
Cooper, K.G.1
-
8
-
-
4544250875
-
Measuring and Classifying Construction Field Rework: A Pilot Study
-
The University of Alberta Edmonton, Al., Canada
-
A.R. Fayek, M. Dissanayake, and O. Campero Measuring and Classifying Construction Field Rework: A Pilot Study Research Rep. (May), Construction Owners Association of Alberta (COAA) 2003 The University of Alberta Edmonton, Al., Canada
-
(2003)
Research Rep. (May), Construction Owners Association of Alberta (COAA)
-
-
Fayek, A.R.1
Dissanayake, M.2
Campero, O.3
-
9
-
-
0033096878
-
Window analysis of compensable delays
-
M. Finke Window analysis of compensable delays J. Constr. Engrg. and Mgmt. ASCE 125 2 1999 96 100
-
(1999)
J. Constr. Engrg. and Mgmt. ASCE
, vol.125
, Issue.2
, pp. 96-100
-
-
Finke, M.1
-
10
-
-
33751371489
-
Simplified project management for construction practitioners
-
T. Hegazy "Simplified project management for construction practitioners" Cost Eng. J. AACE Int. 48 11 2006 20 28 (Pubitemid 44813160)
-
(2006)
Cost Engineering (Morgantown, West Virginia)
, vol.48
, Issue.11
, pp. 20-28
-
-
Hegazy, T.1
-
12
-
-
47749097935
-
Delay analysis under multiple baseline updates
-
T. Hegazy, and W. Menesi Delay analysis under multiple baseline updates J. Constr. Engrg. and Mgmt. 134 8 2008 575 582
-
(2008)
J. Constr. Engrg. and Mgmt.
, vol.134
, Issue.8
, pp. 575-582
-
-
Hegazy, T.1
Menesi, W.2
-
15
-
-
33846309085
-
Introductory concepts in delay claims
-
S. Holloway Introductory concepts in delay claims Constr. Law and Business. 2 6 2002 3 6
-
(2002)
Constr. Law and Business.
, vol.2
, Issue.6
, pp. 3-6
-
-
Holloway, S.1
-
16
-
-
60449091309
-
Measuring the impacts of rework on construction cost performance
-
B.G. Hwang, S.R. Thomas, C.T. Haas, and C.H. Caldas Measuring the impacts of rework on construction cost performance J. Constr. Engrg. and Mgmt. ASCE 135 3 2009 187 198
-
(2009)
J. Constr. Engrg. and Mgmt. ASCE
, vol.135
, Issue.3
, pp. 187-198
-
-
Hwang, B.G.1
Thomas, S.R.2
Haas, C.T.3
Caldas, C.H.4
-
17
-
-
0032593163
-
The causes and costs of defects in construction: A study of seven building projects
-
P.E. Josephson, and Y. Hammarlund The causes and costs of defects in construction: a study of seven building projects Automation in Construction 8 6 1999 681 687
-
(1999)
Automation in Construction
, vol.8
, Issue.6
, pp. 681-687
-
-
Josephson, P.E.1
Hammarlund, Y.2
-
18
-
-
0033342184
-
Generic methodology for analyzing delay claims
-
DOI 10.1061/(ASCE)0733-9364(1999)125:6(409)
-
S. Kartam Generic methodology for analyzing delay claims J. Constr. Engrg. and Mgmt. ASCE 125 6 1999 409 419 (Pubitemid 30509595)
-
(1999)
Journal of Construction Engineering and Management
, vol.125
, Issue.6
, pp. 409-419
-
-
Kartam, S.1
-
19
-
-
77149177666
-
Rework in civil infrastructure projects: Determination of cost predictors
-
P.E.D. Love, D.J. Edwards, H. Watson, and P. Davis "Rework in civil infrastructure projects: determination of cost predictors" J. Constr. Engrg. and Mgmt. ASCE 136 3 2010 275 282
-
(2010)
J. Constr. Engrg. and Mgmt. ASCE
, vol.136
, Issue.3
, pp. 275-282
-
-
Love, P.E.D.1
Edwards, D.J.2
Watson, H.3
Davis, P.4
-
20
-
-
27944504058
-
Forensic project management: The underlying causes of rework in construction projects
-
DOI 10.1080/10286600412331295955, PII XG0Y761JXKWEY0PP
-
P.E.D. Love, and D. Edwards Forensic project management: the underlying causes of rework in construction projects Civ. Eng. Environ. Syst. 12 3 2004 207 228 (Pubitemid 44121663)
-
(2004)
Civil Engineering and Environmental Systems
, vol.21
, Issue.3
, pp. 207-228
-
-
Love, P.1
Edwards, D.J.2
-
21
-
-
2642539100
-
Benchmarking, benchaction, and benchlearning: Rework mitigation in projects
-
DOI 10.1061/(ASCE)0742-597X(2003)19:4(147)
-
P.E.D. Love, and J. Smith Bench-marking, bench-action and bench-learning: rework mitigation in projects J. Mgmt. Eng. ASCE 19 4 2003 147 159 (Pubitemid 40337158)
-
(2003)
Journal of Management in Engineering
, vol.19
, Issue.4
, pp. 147-159
-
-
Love, P.E.D.1
Smith, J.2
-
22
-
-
0000797825
-
Quantifying the causes and costs of rework in construction
-
P.E.D. Love, and H. Li Quantifying the causes and costs of rework in construction Constr. Mgmt. Econ. 18 4 2000 479 490
-
(2000)
Constr. Mgmt. Econ.
, vol.18
, Issue.4
, pp. 479-490
-
-
Love, P.E.D.1
Li, H.2
-
23
-
-
0001187120
-
Determining the casual structure of rework influences in construction
-
P.E.D. Love, P. Mandal, and H. Li Determining the casual structure of rework influences in construction Constr. Mgmt. Econ. 17 4 1999 505 517
-
(1999)
Constr. Mgmt. Econ.
, vol.17
, Issue.4
, pp. 505-517
-
-
Love, P.E.D.1
Mandal, P.2
Li, H.3
-
24
-
-
36349001859
-
System dynamics applied to project management: A survey, assessment, and directions for future research
-
DOI 10.1002/sdr.377, Exploring tne Next Great Frontier: System Dynamics at 50
-
J.M. Lyneis, and D.N. Ford System dynamics applied to project management: a survey, assessment, and directions for future research Syst. Dyn. Rev. 23 2-3 2007 157 189 (Pubitemid 350148315)
-
(2007)
System Dynamics Review
, vol.23
, Issue.2-3
, pp. 157-189
-
-
Lyneis, J.M.1
Ford, D.N.2
-
26
-
-
33645713197
-
Most significant causes for rework due to engineering deliverables
-
M. Massièra, N. El-Jabi, CSCE Moncton, N.B June 2003
-
J.Y. Ruwanpura, D. Meek, T. Nutting, D. Greaves, J. Hamlin, and M. Timler Most significant causes for rework due to engineering deliverables M. Massièra, N. El-Jabi, Proceedings of the 5th Construction Specialty Conference 2003 CSCE Moncton, N.B June 2003
-
(2003)
Proceedings of the 5th Construction Specialty Conference
-
-
Ruwanpura, J.Y.1
Meek, D.2
Nutting, T.3
Greaves, D.4
Hamlin, J.5
Timler, M.6
-
27
-
-
0034225662
-
Schedule delay analysis
-
G.R. Stumpf Schedule delay analysis Cost. Eng. Jr. AACE Int 42 7 2000 32 43
-
(2000)
Cost. Eng. Jr. AACE Int
, vol.42
, Issue.7
, pp. 32-43
-
-
Stumpf, G.R.1
-
29
-
-
0042689966
-
Influence of project type and procurement method on rework costs in building construction projects
-
DOI 10.1061/(ASCE)0733-9364(2002)128:1(18)
-
P.E.D. Love Influence of Project Type and Procurement Method on Rework Costs in Building Construction Projects J. Constr. Engrg. and Mgmt. ASCE 128 1 2002 18 29 (Pubitemid 40264891)
-
(2002)
Journal of Construction Engineering and Management
, vol.128
, Issue.1
, pp. 18-29
-
-
Love, P.E.D.1
|