메뉴 건너뛰기




Volumn 30, Issue 7, 2012, Pages 817-826

Construction project change management in Singapore: Status, importance and impact

Author keywords

Best practice; Change; Change management; Construction project; Cost; Performance; Quality; Schedule; Singapore

Indexed keywords

BEST PRACTICE; CHANGE; CHANGE MANAGEMENT; CONSTRUCTION PROJECTS; PERFORMANCE; SCHEDULE; SINGAPORE;

EID: 84865384217     PISSN: 02637863     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ijproman.2011.11.001     Document Type: Article
Times cited : (77)

References (26)
  • 1
    • 4444266567 scopus 로고    scopus 로고
    • Causes of Discrepancies between Design and Construction
    • Arain F.M., Assaf S., Low S.P. Causes of Discrepancies between Design and Construction. Architectural Science Review 2004, 47(3):237-249.
    • (2004) Architectural Science Review , vol.47 , Issue.3 , pp. 237-249
    • Arain, F.M.1    Assaf, S.2    Low, S.P.3
  • 2
    • 24944534096 scopus 로고    scopus 로고
    • The potential effects of variation orders on institutional building projects
    • Arain F.M., Low S.P. The potential effects of variation orders on institutional building projects. Facilities 2005, 23(11/12):496-510.
    • (2005) Facilities , vol.23 , Issue.11-12 , pp. 496-510
    • Arain, F.M.1    Low, S.P.2
  • 4
    • 84992986606 scopus 로고    scopus 로고
    • Web-based application for managing change orders in construction projects
    • Charoenngam C., Coquinco S., Hadikusumo B. Web-based application for managing change orders in construction projects. Construction Innovation 2003, 3:197-215.
    • (2003) Construction Innovation , vol.3 , pp. 197-215
    • Charoenngam, C.1    Coquinco, S.2    Hadikusumo, B.3
  • 6
    • 4143128716 scopus 로고
    • Construction Industry Institute, University of Texas at Austin, Austin, TX
    • CII Qualitative Effects of Project Changes 1995, Construction Industry Institute, University of Texas at Austin, Austin, TX.
    • (1995) CII Qualitative Effects of Project Changes
  • 13
    • 38149114645 scopus 로고    scopus 로고
    • Feasibility study of an automated tool for identifying the implications of changes in construction projects
    • Isaac S., Navon R. Feasibility study of an automated tool for identifying the implications of changes in construction projects. Journal of Construction Engineering and Management 2008, 134(2):139-145.
    • (2008) Journal of Construction Engineering and Management , vol.134 , Issue.2 , pp. 139-145
    • Isaac, S.1    Navon, R.2
  • 14
    • 0032670219 scopus 로고    scopus 로고
    • CONSCOM: An OO Construction Scheduling and Change Management System
    • Karim A., Adeli H. CONSCOM: An OO Construction Scheduling and Change Management System. Journal of Construction Engineering and Management 1999, 125(5):368-377.
    • (1999) Journal of Construction Engineering and Management , vol.125 , Issue.5 , pp. 368-377
    • Karim, A.1    Adeli, H.2
  • 16
    • 33846659892 scopus 로고    scopus 로고
    • System dynamics approach for error and change management in concurrent design and construction
    • Lee S.H., Peña-Mora F. System dynamics approach for error and change management in concurrent design and construction. Proc. of the 2005 Winter Simulation Conf., Orlando, FL 2005, 1508-1514.
    • (2005) Proc. of the 2005 Winter Simulation Conf., Orlando, FL , pp. 1508-1514
    • Lee, S.H.1    Peña-Mora, F.2
  • 17
    • 25444435990 scopus 로고    scopus 로고
    • Quality and Change Management Model for Large Scale Concurrent Design and Construction Projects
    • Lee S.H., Peña-Mora F., Park M. Quality and Change Management Model for Large Scale Concurrent Design and Construction Projects. Journal of Construction Engineering and Management 2005, 131(8):890-902.
    • (2005) Journal of Construction Engineering and Management , vol.131 , Issue.8 , pp. 890-902
    • Lee, S.H.1    Peña-Mora, F.2    Park, M.3
  • 18
    • 0036680986 scopus 로고    scopus 로고
    • Using systems dynamics to better understand change and rework in construction project management systems
    • Love P.E., Holt G.D., Shen L.Y., Li H., Irani Z. Using systems dynamics to better understand change and rework in construction project management systems. International Journal of Project Management 2002, 20(6):425-436.
    • (2002) International Journal of Project Management , vol.20 , Issue.6 , pp. 425-436
    • Love, P.E.1    Holt, G.D.2    Shen, L.Y.3    Li, H.4    Irani, Z.5
  • 22
    • 80054789187 scopus 로고    scopus 로고
    • Retrieved June 22, 2010, from Building and Fire Research Laboratory: Fire on the Web:
    • Park M. Dynamic Change Management for Fast-tracking Construction Projects Retrieved June 22, 2010, from Building and Fire Research Laboratory: Fire on the Web:. http://fire.nist.gov/bfrlpubs/build02/art129.html.
    • Dynamic Change Management for Fast-tracking Construction Projects
    • Park, M.1
  • 23
    • 84865350571 scopus 로고    scopus 로고
    • Retrieved May 10, 2010, from NW Ohio Great Lakes Construction Alliance:, (September)
    • Roundtable T.C. Construction Project Controls: Cost, Schedule, and Change Management Retrieved May 10, 2010, from NW Ohio Great Lakes Construction Alliance:, (September). http://www.nwoglca.org/PDF_Files/Construction%20Project%20Controls_%20Cost,%20Schedule%20and%20Change%20Management.pdf.
    • Construction Project Controls: Cost, Schedule, and Change Management
    • Roundtable, T.C.1
  • 26
    • 42049119234 scopus 로고    scopus 로고
    • The impacts of change management practices on project change cost performance
    • Zou Y., Lee S.-H. The impacts of change management practices on project change cost performance. Construction Management and Economics 2008, 26(4):387-393.
    • (2008) Construction Management and Economics , vol.26 , Issue.4 , pp. 387-393
    • Zou, Y.1    Lee, S.-H.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.