메뉴 건너뛰기




Volumn 22, Issue 1, 2005, Pages 11-27

Calculating total rework costs in Australian construction projects

Author keywords

Australia; Costs; Defects; Deviations; Failures; Non conformance; Rework

Indexed keywords

DATA ACQUISITION; DEFECTS; KNOWLEDGE ACQUISITION; PROJECT MANAGEMENT;

EID: 27944450797     PISSN: 10286608     EISSN: 10290249     Source Type: Journal    
DOI: 10.1080/10286600500049904     Document Type: Article
Times cited : (33)

References (39)
  • 4
    • 0001326664 scopus 로고    scopus 로고
    • The cost of quality failures in major civil engineering projects
    • Barber, P., Sheath, D., Tomkins, C. and Graves, A., The cost of quality failures in major civil engineering projects. Int. J. Qual Reliab. Manage., 2000, 17(4/5), 479-192.
    • (2000) Int. J. Qual Reliab. Manage. , vol.17 , Issue.4-5 , pp. 479-1192
    • Barber, P.1    Sheath, D.2    Tomkins, C.3    Graves, A.4
  • 8
    • 14844336201 scopus 로고
    • Concrete quality assurance: The contractors role
    • Concrete Institute of Australia: Melbourne, Australia
    • Burroughs, G., Concrete quality assurance: the contractors role. Quality Assurance in the Construction Industry, 1993 (Concrete Institute of Australia: Melbourne, Australia).
    • (1993) Quality Assurance in the Construction Industry
    • Burroughs, G.1
  • 14
    • 4143080221 scopus 로고
    • Management of design documentation, where do we go from here?
    • edited by R.R. Wakefield and D.G. Carmichael, Balkema: Rotterdam
    • Gardiner, J., Management of design documentation, where do we go from here? In Construction and Management, Recent Advances, edited by R.R. Wakefield and D.G. Carmichael, pp. 113-118. 1994 (Balkema: Rotterdam).
    • (1994) Construction and Management, Recent Advances , pp. 113-118
    • Gardiner, J.1
  • 18
    • 0343038761 scopus 로고
    • Quality management in the Australian construction industry
    • edited by R.R. Wakefield and D.G. Carmichael, Balkema: Rotterdam
    • Jaafari, A., Chan, M.A. and Cassab, R., Quality management in the Australian construction industry. In Construction and Management, Recent Advances, edited by R.R. Wakefield and D.G. Carmichael, pp. 89-112,1994 (Balkema: Rotterdam).
    • (1994) Construction and Management, Recent Advances , pp. 89-112
    • Jaafari, A.1    Chan, M.A.2    Cassab, R.3
  • 21
    • 0032593163 scopus 로고    scopus 로고
    • The causes and costs of defects in construction. A study of seven building projects
    • Josephson, P.-E., and Hammarlund, Y. The causes and costs of defects in construction. A study of seven building projects. Automat. Constr., 1999, 8(6), 681-642.
    • (1999) Automat. Constr. , vol.8 , Issue.6 , pp. 681-1642
    • Josephson, P.-E.1    Hammarlund, Y.2
  • 23
    • 4143067931 scopus 로고    scopus 로고
    • Illustrative benchmarking rework and rework costs in Swedish construction industry
    • Josephson, P.-E., Larsson, B. and Li, H., Illustrative benchmarking rework and rework costs in Swedish construction industry. ASCE J. Manage. Eng., 2002, 18(2), 76-83.
    • (2002) ASCE J. Manage. Eng. , vol.18 , Issue.2 , pp. 76-83
    • Josephson, P.-E.1    Larsson, B.2    Li, H.3
  • 24
    • 27944475320 scopus 로고    scopus 로고
    • Quality pays
    • Lomas, K., Quality pays. Eng. Aus., 1996, February, pp. 26.
    • (1996) Eng. Aus. , vol.FEBRUARY , pp. 26
    • Lomas, K.1
  • 25
    • 0000797825 scopus 로고    scopus 로고
    • Quantifying the causes and costs of rework in construction
    • Love, P.E.D. and Li, H., Quantifying the causes and costs of rework in construction. Constr. Manage. Econ., 2000, 18(4), 479-190.
    • (2000) Constr. Manage. Econ. , vol.18 , Issue.4 , pp. 479-1190
    • Love, P.E.D.1    Li, H.2
  • 26
    • 0042689966 scopus 로고    scopus 로고
    • Influence of project type and procurement method on rework costs in building construction projects
    • Love, P.E.D., Influence of project type and procurement method on rework costs in building construction projects. ASCEJ. Constr. Eng. Manage., 2002a, 128(1), 18-29.
    • (2002) ASCEJ. Constr. Eng. Manage. , vol.128 , Issue.1 , pp. 18-29
    • Love, P.E.D.1
  • 27
    • 84986104505 scopus 로고    scopus 로고
    • E.D., Auditing the indirect consequences of rework in construction: A case based approach
    • Love, P.E.D., Auditing the indirect consequences of rework in construction: a case based approach. Manage. Auditing J., 2002b, 17(3), 138-46.
    • (2002) Manage. Auditing J. , vol.17 , Issue.3 , pp. 138-146
    • Love, P.1
  • 28
    • 0042131539 scopus 로고    scopus 로고
    • Project management quality cost information system for the construction industry
    • Love, P.E.D. and Irani, Z. A., Project management quality cost information system for the construction industry. Inform. Manage., 2003, 40, 649-661.
    • (2003) Inform. Manage. , vol.40 , pp. 649-661
    • Love, P.E.D.1    Irani, Z.A.2
  • 29
    • 2642539100 scopus 로고    scopus 로고
    • Bench-marking, bench-action and bench-learning: Rework mitigation in projects
    • Love, P.E.D. and Smith, J., Bench-marking, bench-action and bench-learning: rework mitigation in projects. ASCE J. Manage. Eng., 2003, 19(4), 147-159.
    • (2003) ASCE J. Manage. Eng. , vol.19 , Issue.4 , pp. 147-159
    • Love, P.E.D.1    Smith, J.2
  • 30
    • 27944504058 scopus 로고    scopus 로고
    • Forensic project management: The underlying causes of rework in construction projects. Civil Environ
    • Love, P.E.D. and Edwards, D., Forensic project management: the underlying causes of rework in construction projects. Civil Environ. Eng. Syst., 2004, 12(3), 207-228.
    • (2004) Eng. Syst. , vol.12 , Issue.3 , pp. 207-228
    • Love, P.E.D.1    Edwards, D.2
  • 31
    • 2542461920 scopus 로고    scopus 로고
    • Learning to reduce rework in projects: Analysis of firms learning and quality practices
    • Love, P.E.D., Irani, Z. and Edwards, D., Learning to reduce rework in projects: analysis of firms learning and quality practices. Project Manage. J., 2003, 34(3), 13-25.
    • (2003) Project Manage. J. , vol.34 , Issue.3 , pp. 13-25
    • Love, P.E.D.1    Irani, Z.2    Edwards, D.3
  • 34
    • 4244208223 scopus 로고    scopus 로고
    • Licentiate thesis, Division of Construction Management and Economics, Department of Real Estate and Construction Management, Royal Institute of Technology, Stockholm, Sweden
    • Nylén, K.-O., Cost of failure in a major civil engineering project. Licentiate thesis, Division of Construction Management and Economics, Department of Real Estate and Construction Management, Royal Institute of Technology, Stockholm, Sweden, 1996.
    • (1996) Cost of Failure in a Major Civil Engineering Project
    • Nylén, K.-O.1
  • 36
    • 0004503169 scopus 로고    scopus 로고
    • PhD thesis, No. 23, The Royal Institute of Technology, Department of Materials Processing Production Engineering, Stockholm, Sweden
    • Sörqvist, L., Poor quality costing. PhD thesis, No. 23, The Royal Institute of Technology, Department of Materials Processing Production Engineering, Stockholm, Sweden, 1998.
    • (1998) Poor Quality Costing
    • Sörqvist, L.1
  • 38
    • 0003688603 scopus 로고
    • Unpublished Ph.D. Thesis, Department of Building and Construction Economics, Faculty of Environmental Design and Construction, Royal Melbourne Institute of Technology, Melbourne, Australia
    • Walker, D.H.T., An investigation into the factors that determine building construction time performance. Unpublished Ph.D. Thesis, Department of Building and Construction Economics, Faculty of Environmental Design and Construction, Royal Melbourne Institute of Technology, Melbourne, Australia, 1994.
    • (1994) An Investigation into the Factors That Determine Building Construction Time Performance
    • Walker, D.H.T.1
  • 39
    • 0042188854 scopus 로고    scopus 로고
    • A quality performance management system for industrial construction engineering projects
    • Willis, T.H. and Willis, W.D., A quality performance management system for industrial construction engineering projects. Int. J. Qual. Reliab. Manage., 1996, 13(9), 38-18.
    • (1996) Int. J. Qual. Reliab. Manage. , vol.13 , Issue.9 , pp. 38-118
    • Willis, T.H.1    Willis, W.D.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.