Fuzzy enabled hybrid genetic algorithm-particle swarm optimization approach to solve TCRO problems in construction project planning

Author keywords

Construction costs; Fuzzy sets; Ootimization; Resource allocation; Scheduling

Indexed keywords

CONSTRUCTION COSTS; CONSTRUCTION PROJECTS; HYBRID APPROACH; HYBRID GA-PSO; HYBRID GENETIC; INPUT DATAS; OOTIMIZATION; OPTIMAL RESOURCE ALLOCATION; OPTIMIZATION ALGORITHMS; OPTIMIZATION PROBLEMS; PROCESSING TIME; PROJECT COST; PROJECT DURATION; PROJECT PLANNERS; PROJECT SCHEDULES; RESOURCE LEVELING; SWARM OPTIMIZATION; TOTAL VARIATION; TRADE-OFF ANALYSIS;

EID: 84873627201     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)CO.1943-7862.0000513     Document Type: Article
Times cited : (44)

References (34)
  • 1
    • 70349318547 scopus 로고    scopus 로고
    • Construction project scheduling with time, cost, and material restrictions using fuzzy mathematical models and critical path method
    • Castro-Lacouture, D., Süer, G. A., Gonzalez-Joaqui, J., and Yates, J. K. (2009). "Construction project scheduling with time, cost, and material restrictions using fuzzy mathematical models and critical path method." J. Constr. Eng. Manage., 135(10), 1096-1104.
    • (2009) J. Constr. Eng. Manage. , vol.135 , Issue.10 , pp. 1096-1104
    • Castro-Lacouture, D.1    Süer, G.A.2    Gonzalez-Joaqui, J.3    Yates, J.K.4
  • 2
    • 3142756516 scopus 로고    scopus 로고
    • Handling multiple objectives with particle swarm optimization
    • Coello Coello, C., Pulido, G. T., and Lechuga, M. S. (2004). "Handling multiple objectives with particle swarm optimization. " IEEE Trans. Evol. Comput., 8(3), 256-279.
    • (2004) IEEE Trans. Evol. Comput. , vol.8 , Issue.3 , pp. 256-279
    • Coello Coello, C.1    Pulido, G.T.2    Lechuga, M.S.3
  • 3
    • 0016494906 scopus 로고
    • A review and evaluation of multiobjective programming techniques
    • Cohon, J. L., and Marks, D. H. (1975). "A review and evaluation of multiobjective programming techniques." J. Water Res., 11(2), 208-220.
    • (1975) J. Water Res. , vol.11 , Issue.2 , pp. 208-220
    • Cohon, J.L.1    Marks, D.H.2
  • 4
    • 84947807745 scopus 로고    scopus 로고
    • Comparison between genetic algorithms and particle swarm optimization
    • Springer, Berlin
    • Eberhart, R., and Shi, Y. (1998). "Comparison between genetic algorithms and particle swarm optimization. " Proc, 7th Int. Conf. on Evolut. Program, Springer, Berlin, 611-617.
    • (1998) Proc, 7th Int. Conf. on Evolut. Program , pp. 611-617
    • Eberhart, R.1    Shi, Y.2
  • 5
    • 0035335276 scopus 로고    scopus 로고
    • Object-oriented model for repetitive construction scheduling
    • El-Rayes, K. (2001). "Object-oriented model for repetitive construction scheduling." J. Constr. Eng. Manage., 127(3), 199-205.
    • (2001) J. Constr. Eng. Manage. , vol.127 , Issue.3 , pp. 199-205
    • El-Rayes, K.1
  • 6
    • 22344432656 scopus 로고    scopus 로고
    • Comparison among five evolutionary-based optimization algorithms
    • Elbeltagi, E., Hegazy, T., and Grierson, D. (2005). "Comparison among five evolutionary-based optimization algorithms." Adv. Eng. Inf., 19(1), 43-53.
    • (2005) Adv. Eng. Inf. , vol.19 , Issue.1 , pp. 43-53
    • Elbeltagi, E.1    Hegazy, T.2    Grierson, D.3
  • 8
    • 0032642926 scopus 로고    scopus 로고
    • Optimization of resource allocation and leveling using genetic algorithms
    • Hegazy, T. (1999). "Optimization of resource allocation and leveling using genetic algorithms." J Constr. Eng. Manage., 125(3), 167-175.
    • (1999) J Constr. Eng. Manage. , vol.125 , Issue.3 , pp. 167-175
    • Hegazy, T.1
  • 10
    • 1842535329 scopus 로고    scopus 로고
    • A hybrid of genetic algorithm and particle swarm optimization for recurrent network design
    • Juang, C. F. (2004). "A hybrid of genetic algorithm and particle swarm optimization for recurrent network design. " IEEE Trans. Syst. Man Cybem. B Cybern., 34(2), 997-1006.
    • (2004) IEEE Trans. Syst. Man Cybem. B Cybern. , vol.34 , Issue.2 , pp. 997-1006
    • Juang, C.F.1
  • 11
    • 33646171275 scopus 로고    scopus 로고
    • Parallel genetic algorithms for optimizing resource utilization in large-scale construction projects
    • Kandil, A., and El-Rayes, K. (2006). "Parallel genetic algorithms for optimizing resource utilization in large-scale construction projects." J. Constr. Eng. Manage., 132(5), 491-498.
    • (2006) J. Constr. Eng. Manage. , vol.132 , Issue.5 , pp. 491-498
    • Kandil, A.1    El-Rayes, K.2
  • 13
    • 75649117074 scopus 로고    scopus 로고
    • Comparing schedule generation schemes in resource-constrained project scheduling using elitist genetic algorithm
    • Kim, J. L., and Ellis, R. (2010). "Comparing schedule generation schemes in resource-constrained project scheduling using elitist genetic algorithm." J. Constr. Eng. Manage., 136(2), 160-169.
    • (2010) J. Constr. Eng. Manage. , vol.136 , Issue.2 , pp. 160-169
    • Kim, J.L.1    Ellis, R.2
  • 14
    • 12744251343 scopus 로고    scopus 로고
    • Use of fuzzy logic for predicting design cost overruns on building projects
    • Knight, K., and Fayek, A. R. (2002). "Use of fuzzy logic for predicting design cost overruns on building projects." J. Constr. Eng. Manage., 128(6), 503-512.
    • (2002) J. Constr. Eng. Manage. , vol.128 , Issue.6 , pp. 503-512
    • Knight, K.1    Fayek, A.R.2
  • 15
    • 33745727034 scopus 로고    scopus 로고
    • Multi-objective optimization using genetic algorithms: A tutorial
    • Konak, A., Coitb, D. W., and Smith, A. E. (2006). "Multi-objective optimization using genetic algorithms: A tutorial." Reliab. Eng. Syst. Saf, 91(9), 992-1007.
    • (2006) Reliab. Eng. Syst. Saf , vol.91 , Issue.9 , pp. 992-1007
    • Konak, A.1    Coitb, D.W.2    Smith, A.E.3
  • 16
    • 0033312040 scopus 로고    scopus 로고
    • GA-based multi-criteria optimal model for construction scheduling
    • Leu, S., and Yang, C. (1999). "GA-based multi-criteria optimal model for construction scheduling." J. Constr. Eng. Manage., 125(6), 420-427.
    • (1999) J. Constr. Eng. Manage. , vol.125 , Issue.6 , pp. 420-427
    • Leu, S.1    Yang, C.2
  • 17
    • 0000466018 scopus 로고    scopus 로고
    • Resource leveling of linear schedules using integer linear programming
    • Mattila, K., and Abraham, D. M. (1998). "Resource leveling of linear schedules using integer linear programming." J. Constr. Eng. Manage., 124(3), 232-242.
    • (1998) J. Constr. Eng. Manage. , vol.124 , Issue.3 , pp. 232-242
    • Mattila, K.1    Abraham, D.M.2
  • 18
    • 0036672003 scopus 로고    scopus 로고
    • Ant colony optimization for resource-constrained project scheduling
    • Merkle, D., Middendorf, M., and Schmeck, H. (2002). "Ant colony optimization for resource-constrained project scheduling." IEEE J. Transport. Evol. Comput., 6(4), 333-346.
    • (2002) IEEE J. Transport. Evol. Comput. , vol.6 , Issue.4 , pp. 333-346
    • Merkle, D.1    Middendorf, M.2    Schmeck, H.3
  • 19
    • 0027828985 scopus 로고
    • Least impact algorithm for resource allocation
    • Moselhi, A., and Lorterapong, P. (1993). "Least impact algorithm for resource allocation. " Can. J. Civil Eng., 20(2), 180-188.
    • (1993) Can. J. Civil Eng. , vol.20 , Issue.2 , pp. 180-188
    • Moselhi, A.1    Lorterapong, P.2
  • 20
    • 49749102449 scopus 로고    scopus 로고
    • Optimizing construction time and cost using ant colony optimization approach
    • Ng, S. T., and Zhang, Y. (2008). "Optimizing construction time and cost using ant colony optimization approach." J. Constr. Eng. Manage., 134(9), 721-728.
    • (2008) J. Constr. Eng. Manage. , vol.134 , Issue.9 , pp. 721-728
    • Ng, S.T.1    Zhang, Y.2
  • 22
    • 0035510392 scopus 로고    scopus 로고
    • Dynamic planning for fast-tracking building construction projects
    • Pena-Mora, R, and Park, M. (2001). "Dynamic planning for fast-tracking building construction projects." J. Constr. Eng. Manage., 127(6), 445-456.
    • (2001) J. Constr. Eng. Manage. , vol.127 , Issue.6 , pp. 445-456
    • Pena-Mora, R.1    Park, M.2
  • 23
    • 13944251756 scopus 로고    scopus 로고
    • Use of genetic algorithms in resource scheduling of construction projects
    • Senouci, A., and Eldin, N. (2004). "Use of genetic algorithms in resource scheduling of construction projects." J. Constr. Eng. Manage., 130(6), 869-877.
    • (2004) J. Constr. Eng. Manage. , vol.130 , Issue.6 , pp. 869-877
    • Senouci, A.1    Eldin, N.2
  • 24
  • 25
    • 12244256802 scopus 로고    scopus 로고
    • An improved GA and a novel PSO-GA-based hybrid algorithm
    • Shi, X. H., Liang, Y. C., Lee, H. P., Lu, C., and Wang, L. M. (2004). "An improved GA and a novel PSO-GA-based hybrid algorithm." Inf. Process. Lett., 93(none), 255-261.
    • (2004) Inf. Process. Lett. , vol.93 , pp. 255-261
    • Shi, X.H.1    Liang, Y.C.2    Lee, H.P.3    Lu, C.4    Wang, L.M.5
  • 26
    • 0032633457 scopus 로고    scopus 로고
    • Multi-heuristic approach for resource leveling problem in construction engineering: Hybrid approach
    • Son, J., and Skibniewski, M. (1999). "Multi-heuristic approach for resource leveling problem in construction engineering: Hybrid approach." J. Construct. Eng. Manage., 125(1), 23-31.
    • (1999) J. Construct. Eng. Manage. , vol.125 , Issue.1 , pp. 23-31
    • Son, J.1    Skibniewski, M.2
  • 27
    • 0000852513 scopus 로고
    • Multiobjective function optimization using nondominated sorting in genetic algorithms
    • Srinivas, N., and Deb, K. (1995). "Multiobjective function optimization using nondominated sorting in genetic algorithms." J. Evol. Comput., 2(3), 221-248.
    • (1995) J. Evol. Comput. , vol.2 , Issue.3 , pp. 221-248
    • Srinivas, N.1    Deb, K.2
  • 28
    • 34250644399 scopus 로고    scopus 로고
    • Using elitist particle swarm optimization to facilitate bi-criterion time-cost trade-off analysis
    • Yang, I. T. (2007). "Using elitist particle swarm optimization to facilitate bi-criterion time-cost trade-off analysis." J. Constr. Eng. Manage., 133(7), 498-505.
    • (2007) J. Constr. Eng. Manage. , vol.133 , Issue.7 , pp. 498-505
    • Yang, I.T.1
  • 29
    • 33645213044 scopus 로고    scopus 로고
    • A hybrid particle swarm optimization algorithm for optimal task assignment in distributed systems
    • Yin, P. Y, Yu, S., Wang, P.-P., and Wang, Y.-T. (2006). "A hybrid particle swarm optimization algorithm for optimal task assignment in distributed systems." J. Comput. Stand. Interfaces, 28(4), 441-450.
    • (2006) J. Comput. Stand. Interfaces , vol.28 , Issue.4 , pp. 441-450
    • Yin, P.Y.1    Yu, S.2    Wang, P.-P.3    Wang, Y.-T.4
  • 30
    • 70350070859 scopus 로고    scopus 로고
    • Stochastic time-cost-resource utilization optimization using non-dominated sorting genetic algorithm and discrete fuzzy sets
    • Zahraie, B., and Tavakolan, M. (2009). "Stochastic time-cost-resource utilization optimization using non-dominated sorting genetic algorithm and discrete fuzzy sets." J. Constr. Eng. Manage., 135(11), 1162-1173.
    • (2009) J. Constr. Eng. Manage. , vol.135 , Issue.11 , pp. 1162-1173
    • Zahraie, B.1    Tavakolan, M.2
  • 31
    • 32944474678 scopus 로고    scopus 로고
    • Particle swarm optimization for preemptive scheduling under break and resource-constraints
    • Zhang, H., Li, H., and Tarn, C. (2006). "Particle swarm optimization for preemptive scheduling under break and resource-constraints." J. Constr. Eng. Manage., 132(3), 259-267.
    • (2006) J. Constr. Eng. Manage. , vol.132 , Issue.3 , pp. 259-267
    • Zhang, H.1    Li, H.2    Tarn, C.3
  • 32
    • 2342615793 scopus 로고    scopus 로고
    • Applying a genetic algorithm-based multi-objective approach for time-cost optimization
    • Zheng, D., Ng, T., and Kumaraswamy, M. (2004). "Applying a genetic algorithm-based multi-objective approach for time-cost optimization. " J. Constr. Eng. Manage., 130(2), 168-176.
    • (2004) J. Constr. Eng. Manage. , vol.130 , Issue.2 , pp. 168-176
    • Zheng, D.1    Ng, T.2    Kumaraswamy, M.3
  • 33
    • 12744266507 scopus 로고    scopus 로고
    • Stochastic time-cost optimization model incorporating fuzzy sets theory and non-replaceable front
    • Zheng, D., and Ng, T. (2005). "Stochastic time-cost optimization model incorporating fuzzy sets theory and non-replaceable front." J. Constr. Eng. Manage., 131(2), 176-186.
    • (2005) J. Constr. Eng. Manage. , vol.131 , Issue.2 , pp. 176-186
    • Zheng, D.1    Ng, T.2
  • 34
    • 0034199979 scopus 로고    scopus 로고
    • Comparison of multi-objective evolutionary algorithms: Empirical results
    • Zitzler, E., Thiele, L., and Deb, K. (2000). "Comparison of multi-objective evolutionary algorithms: Empirical results." J. Evol. Comput., 8(2), 173-195.
    • (2000) J. Evol. Comput. , vol.8 , Issue.2 , pp. 173-195
    • Zitzler, E.1    Thiele, L.2    Deb, K.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.