-
1
-
-
70349318547
-
Construction project scheduling with time, cost, and material restrictions using fuzzy mathematical models and critical path method
-
Castro-Lacouture, D., Süer, G. A., Gonzalez-Joaqui, J., and Yates, J. K. (2009). "Construction project scheduling with time, cost, and material restrictions using fuzzy mathematical models and critical path method." J. Constr. Eng. Manage., 135(10), 1096-1104.
-
(2009)
J. Constr. Eng. Manage.
, vol.135
, Issue.10
, pp. 1096-1104
-
-
Castro-Lacouture, D.1
Süer, G.A.2
Gonzalez-Joaqui, J.3
Yates, J.K.4
-
2
-
-
3142756516
-
Handling multiple objectives with particle swarm optimization
-
Coello Coello, C., Pulido, G. T., and Lechuga, M. S. (2004). "Handling multiple objectives with particle swarm optimization. " IEEE Trans. Evol. Comput., 8(3), 256-279.
-
(2004)
IEEE Trans. Evol. Comput.
, vol.8
, Issue.3
, pp. 256-279
-
-
Coello Coello, C.1
Pulido, G.T.2
Lechuga, M.S.3
-
3
-
-
0016494906
-
A review and evaluation of multiobjective programming techniques
-
Cohon, J. L., and Marks, D. H. (1975). "A review and evaluation of multiobjective programming techniques." J. Water Res., 11(2), 208-220.
-
(1975)
J. Water Res.
, vol.11
, Issue.2
, pp. 208-220
-
-
Cohon, J.L.1
Marks, D.H.2
-
4
-
-
84947807745
-
Comparison between genetic algorithms and particle swarm optimization
-
Springer, Berlin
-
Eberhart, R., and Shi, Y. (1998). "Comparison between genetic algorithms and particle swarm optimization. " Proc, 7th Int. Conf. on Evolut. Program, Springer, Berlin, 611-617.
-
(1998)
Proc, 7th Int. Conf. on Evolut. Program
, pp. 611-617
-
-
Eberhart, R.1
Shi, Y.2
-
5
-
-
0035335276
-
Object-oriented model for repetitive construction scheduling
-
El-Rayes, K. (2001). "Object-oriented model for repetitive construction scheduling." J. Constr. Eng. Manage., 127(3), 199-205.
-
(2001)
J. Constr. Eng. Manage.
, vol.127
, Issue.3
, pp. 199-205
-
-
El-Rayes, K.1
-
6
-
-
22344432656
-
Comparison among five evolutionary-based optimization algorithms
-
Elbeltagi, E., Hegazy, T., and Grierson, D. (2005). "Comparison among five evolutionary-based optimization algorithms." Adv. Eng. Inf., 19(1), 43-53.
-
(2005)
Adv. Eng. Inf.
, vol.19
, Issue.1
, pp. 43-53
-
-
Elbeltagi, E.1
Hegazy, T.2
Grierson, D.3
-
7
-
-
0003722376
-
-
Addison-Wesley, Reading, MA
-
Goldberg, D. (1989). Genetic algorithms in search, optimization, and machine learning, Addison-Wesley, Reading, MA.
-
(1989)
Genetic Algorithms in Search, Optimization, and Machine Learning
-
-
Goldberg, D.1
-
8
-
-
0032642926
-
Optimization of resource allocation and leveling using genetic algorithms
-
Hegazy, T. (1999). "Optimization of resource allocation and leveling using genetic algorithms." J Constr. Eng. Manage., 125(3), 167-175.
-
(1999)
J Constr. Eng. Manage.
, vol.125
, Issue.3
, pp. 167-175
-
-
Hegazy, T.1
-
10
-
-
1842535329
-
A hybrid of genetic algorithm and particle swarm optimization for recurrent network design
-
Juang, C. F. (2004). "A hybrid of genetic algorithm and particle swarm optimization for recurrent network design. " IEEE Trans. Syst. Man Cybem. B Cybern., 34(2), 997-1006.
-
(2004)
IEEE Trans. Syst. Man Cybem. B Cybern.
, vol.34
, Issue.2
, pp. 997-1006
-
-
Juang, C.F.1
-
11
-
-
33646171275
-
Parallel genetic algorithms for optimizing resource utilization in large-scale construction projects
-
Kandil, A., and El-Rayes, K. (2006). "Parallel genetic algorithms for optimizing resource utilization in large-scale construction projects." J. Constr. Eng. Manage., 132(5), 491-498.
-
(2006)
J. Constr. Eng. Manage.
, vol.132
, Issue.5
, pp. 491-498
-
-
Kandil, A.1
El-Rayes, K.2
-
12
-
-
0029535737
-
Particle swarm optimization
-
IEEE, Perth, Australia
-
Kennedy, J., and Eberhart, R. (1995). "Particle swarm optimization. " Proc, 4th Int. Conf. on Neural Networks, IEEE, Perth, Australia, 1942-1948.
-
(1995)
Proc, 4th Int. Conf. on Neural Networks
, pp. 1942-1948
-
-
Kennedy, J.1
Eberhart, R.2
-
13
-
-
75649117074
-
Comparing schedule generation schemes in resource-constrained project scheduling using elitist genetic algorithm
-
Kim, J. L., and Ellis, R. (2010). "Comparing schedule generation schemes in resource-constrained project scheduling using elitist genetic algorithm." J. Constr. Eng. Manage., 136(2), 160-169.
-
(2010)
J. Constr. Eng. Manage.
, vol.136
, Issue.2
, pp. 160-169
-
-
Kim, J.L.1
Ellis, R.2
-
14
-
-
12744251343
-
Use of fuzzy logic for predicting design cost overruns on building projects
-
Knight, K., and Fayek, A. R. (2002). "Use of fuzzy logic for predicting design cost overruns on building projects." J. Constr. Eng. Manage., 128(6), 503-512.
-
(2002)
J. Constr. Eng. Manage.
, vol.128
, Issue.6
, pp. 503-512
-
-
Knight, K.1
Fayek, A.R.2
-
15
-
-
33745727034
-
Multi-objective optimization using genetic algorithms: A tutorial
-
Konak, A., Coitb, D. W., and Smith, A. E. (2006). "Multi-objective optimization using genetic algorithms: A tutorial." Reliab. Eng. Syst. Saf, 91(9), 992-1007.
-
(2006)
Reliab. Eng. Syst. Saf
, vol.91
, Issue.9
, pp. 992-1007
-
-
Konak, A.1
Coitb, D.W.2
Smith, A.E.3
-
16
-
-
0033312040
-
GA-based multi-criteria optimal model for construction scheduling
-
Leu, S., and Yang, C. (1999). "GA-based multi-criteria optimal model for construction scheduling." J. Constr. Eng. Manage., 125(6), 420-427.
-
(1999)
J. Constr. Eng. Manage.
, vol.125
, Issue.6
, pp. 420-427
-
-
Leu, S.1
Yang, C.2
-
17
-
-
0000466018
-
Resource leveling of linear schedules using integer linear programming
-
Mattila, K., and Abraham, D. M. (1998). "Resource leveling of linear schedules using integer linear programming." J. Constr. Eng. Manage., 124(3), 232-242.
-
(1998)
J. Constr. Eng. Manage.
, vol.124
, Issue.3
, pp. 232-242
-
-
Mattila, K.1
Abraham, D.M.2
-
18
-
-
0036672003
-
Ant colony optimization for resource-constrained project scheduling
-
Merkle, D., Middendorf, M., and Schmeck, H. (2002). "Ant colony optimization for resource-constrained project scheduling." IEEE J. Transport. Evol. Comput., 6(4), 333-346.
-
(2002)
IEEE J. Transport. Evol. Comput.
, vol.6
, Issue.4
, pp. 333-346
-
-
Merkle, D.1
Middendorf, M.2
Schmeck, H.3
-
19
-
-
0027828985
-
Least impact algorithm for resource allocation
-
Moselhi, A., and Lorterapong, P. (1993). "Least impact algorithm for resource allocation. " Can. J. Civil Eng., 20(2), 180-188.
-
(1993)
Can. J. Civil Eng.
, vol.20
, Issue.2
, pp. 180-188
-
-
Moselhi, A.1
Lorterapong, P.2
-
20
-
-
49749102449
-
Optimizing construction time and cost using ant colony optimization approach
-
Ng, S. T., and Zhang, Y. (2008). "Optimizing construction time and cost using ant colony optimization approach." J. Constr. Eng. Manage., 134(9), 721-728.
-
(2008)
J. Constr. Eng. Manage.
, vol.134
, Issue.9
, pp. 721-728
-
-
Ng, S.T.1
Zhang, Y.2
-
22
-
-
0035510392
-
Dynamic planning for fast-tracking building construction projects
-
Pena-Mora, R, and Park, M. (2001). "Dynamic planning for fast-tracking building construction projects." J. Constr. Eng. Manage., 127(6), 445-456.
-
(2001)
J. Constr. Eng. Manage.
, vol.127
, Issue.6
, pp. 445-456
-
-
Pena-Mora, R.1
Park, M.2
-
23
-
-
13944251756
-
Use of genetic algorithms in resource scheduling of construction projects
-
Senouci, A., and Eldin, N. (2004). "Use of genetic algorithms in resource scheduling of construction projects." J. Constr. Eng. Manage., 130(6), 869-877.
-
(2004)
J. Constr. Eng. Manage.
, vol.130
, Issue.6
, pp. 869-877
-
-
Senouci, A.1
Eldin, N.2
-
24
-
-
33947408713
-
Fuzzy numbers in cost range estimating
-
Shaheen, A., Fayek, A. R., and Abourizk, S. (2007). "Fuzzy numbers in cost range estimating." J. Constr. Eng. Manage., 133(4), 325-334.
-
(2007)
J. Constr. Eng. Manage.
, vol.133
, Issue.4
, pp. 325-334
-
-
Shaheen, A.1
Fayek, A.R.2
Abourizk, S.3
-
25
-
-
12244256802
-
An improved GA and a novel PSO-GA-based hybrid algorithm
-
Shi, X. H., Liang, Y. C., Lee, H. P., Lu, C., and Wang, L. M. (2004). "An improved GA and a novel PSO-GA-based hybrid algorithm." Inf. Process. Lett., 93(none), 255-261.
-
(2004)
Inf. Process. Lett.
, vol.93
, pp. 255-261
-
-
Shi, X.H.1
Liang, Y.C.2
Lee, H.P.3
Lu, C.4
Wang, L.M.5
-
26
-
-
0032633457
-
Multi-heuristic approach for resource leveling problem in construction engineering: Hybrid approach
-
Son, J., and Skibniewski, M. (1999). "Multi-heuristic approach for resource leveling problem in construction engineering: Hybrid approach." J. Construct. Eng. Manage., 125(1), 23-31.
-
(1999)
J. Construct. Eng. Manage.
, vol.125
, Issue.1
, pp. 23-31
-
-
Son, J.1
Skibniewski, M.2
-
27
-
-
0000852513
-
Multiobjective function optimization using nondominated sorting in genetic algorithms
-
Srinivas, N., and Deb, K. (1995). "Multiobjective function optimization using nondominated sorting in genetic algorithms." J. Evol. Comput., 2(3), 221-248.
-
(1995)
J. Evol. Comput.
, vol.2
, Issue.3
, pp. 221-248
-
-
Srinivas, N.1
Deb, K.2
-
28
-
-
34250644399
-
Using elitist particle swarm optimization to facilitate bi-criterion time-cost trade-off analysis
-
Yang, I. T. (2007). "Using elitist particle swarm optimization to facilitate bi-criterion time-cost trade-off analysis." J. Constr. Eng. Manage., 133(7), 498-505.
-
(2007)
J. Constr. Eng. Manage.
, vol.133
, Issue.7
, pp. 498-505
-
-
Yang, I.T.1
-
29
-
-
33645213044
-
A hybrid particle swarm optimization algorithm for optimal task assignment in distributed systems
-
Yin, P. Y, Yu, S., Wang, P.-P., and Wang, Y.-T. (2006). "A hybrid particle swarm optimization algorithm for optimal task assignment in distributed systems." J. Comput. Stand. Interfaces, 28(4), 441-450.
-
(2006)
J. Comput. Stand. Interfaces
, vol.28
, Issue.4
, pp. 441-450
-
-
Yin, P.Y.1
Yu, S.2
Wang, P.-P.3
Wang, Y.-T.4
-
30
-
-
70350070859
-
Stochastic time-cost-resource utilization optimization using non-dominated sorting genetic algorithm and discrete fuzzy sets
-
Zahraie, B., and Tavakolan, M. (2009). "Stochastic time-cost-resource utilization optimization using non-dominated sorting genetic algorithm and discrete fuzzy sets." J. Constr. Eng. Manage., 135(11), 1162-1173.
-
(2009)
J. Constr. Eng. Manage.
, vol.135
, Issue.11
, pp. 1162-1173
-
-
Zahraie, B.1
Tavakolan, M.2
-
31
-
-
32944474678
-
Particle swarm optimization for preemptive scheduling under break and resource-constraints
-
Zhang, H., Li, H., and Tarn, C. (2006). "Particle swarm optimization for preemptive scheduling under break and resource-constraints." J. Constr. Eng. Manage., 132(3), 259-267.
-
(2006)
J. Constr. Eng. Manage.
, vol.132
, Issue.3
, pp. 259-267
-
-
Zhang, H.1
Li, H.2
Tarn, C.3
-
32
-
-
2342615793
-
Applying a genetic algorithm-based multi-objective approach for time-cost optimization
-
Zheng, D., Ng, T., and Kumaraswamy, M. (2004). "Applying a genetic algorithm-based multi-objective approach for time-cost optimization. " J. Constr. Eng. Manage., 130(2), 168-176.
-
(2004)
J. Constr. Eng. Manage.
, vol.130
, Issue.2
, pp. 168-176
-
-
Zheng, D.1
Ng, T.2
Kumaraswamy, M.3
-
33
-
-
12744266507
-
Stochastic time-cost optimization model incorporating fuzzy sets theory and non-replaceable front
-
Zheng, D., and Ng, T. (2005). "Stochastic time-cost optimization model incorporating fuzzy sets theory and non-replaceable front." J. Constr. Eng. Manage., 131(2), 176-186.
-
(2005)
J. Constr. Eng. Manage.
, vol.131
, Issue.2
, pp. 176-186
-
-
Zheng, D.1
Ng, T.2
-
34
-
-
0034199979
-
Comparison of multi-objective evolutionary algorithms: Empirical results
-
Zitzler, E., Thiele, L., and Deb, K. (2000). "Comparison of multi-objective evolutionary algorithms: Empirical results." J. Evol. Comput., 8(2), 173-195.
-
(2000)
J. Evol. Comput.
, vol.8
, Issue.2
, pp. 173-195
-
-
Zitzler, E.1
Thiele, L.2
Deb, K.3
|