Volumn 131, Issue 2, 2005, Pages 176-186

Stochastic time-cost optimization model incorporating fuzzy sets theory and nonreplaceable front

Author keywords

Algorithms; Cost control; Fuzzy sets; Productivity; Project management; Risk management; Stochastic processes; Time factors

Indexed keywords

ALGORITHMS; COSTS; DECISION MAKING; FUZZY SETS; MATHEMATICAL MODELS; OPTIMIZATION; PARETO PRINCIPLE; PRODUCTIVITY; PROJECT MANAGEMENT; RANDOM PROCESSES; RESOURCE ALLOCATION; RISK MANAGEMENT;

EID: 12744266507     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0733-9364(2005)131:2(176)     Document Type: Article
Times cited : (88)

References (24)
  • 1
    • 0004374576 scopus 로고    scopus 로고
    • A time-cost trade-off model with resource consideration using genetic algorithm
    • Chua, D. K. H., Chan, W. T., and Govindan, K. (1997). "A time-cost trade-off model with resource consideration using genetic algorithm." Civ. Eng. Sys., 14(4), 291-312.
    • (1997) Civ. Eng. Sys. , vol.14 , Issue.4 , pp. 291-312
    • Chua, D.K.H.1    Chan, W.T.2    Govindan, K.3
  • 2
    • 0035772309 scopus 로고    scopus 로고
    • A model for construction project budget and schedule performances using fuzzy data
    • Chua, D. K. H., Kog, Y. C., and Loh, P. K. (2001). "A model for construction project budget and schedule performances using fuzzy data." Civ. Eng. Environ. Syst., 18(4), 303-329.
    • (2001) Civ. Eng. Environ. Syst. , vol.18 , Issue.4 , pp. 303-329
    • Chua, D.K.H.1    Kog, Y.C.2    Loh, P.K.3
  • 3
    • 0031185451 scopus 로고    scopus 로고
    • Using genetic algorithms to solve construction time-cost trade-off problems
    • Feng, C., Liu, L., and Burns, S. (1997). "Using genetic algorithms to solve construction time-cost trade-off problems." J. Comput. Civ. Eng., 11(3), 184-189.
    • (1997) J. Comput. Civ. Eng. , vol.11 , Issue.3 , pp. 184-189
    • Feng, C.1    Liu, L.2    Burns, S.3
  • 4
    • 0034172005 scopus 로고    scopus 로고
    • Stochastic construction time-cost trade-off analysis
    • Feng, C., Liu, L., and Burns, S. (2000). "Stochastic construction time-cost trade-off analysis." J. Comput. Civ. Eng., 14(2), 117-126.
    • (2000) J. Comput. Civ. Eng. , vol.14 , Issue.2 , pp. 117-126
    • Feng, C.1    Liu, L.2    Burns, S.3
  • 7
    • 0033497302 scopus 로고    scopus 로고
    • Optimization of construction time-cost trade-off analysis using genetic algorithms
    • Hegazy, T. (1999). "Optimization of construction time-cost trade-off analysis using genetic algorithms." Can. J. Civ. Eng., 26(6), 685-697.
    • (1999) Can. J. Civ. Eng. , vol.26 , Issue.6 , pp. 685-697
    • Hegazy, T.1
  • 9
    • 0039502581 scopus 로고
    • Critical path planning and scheduling: Mathematical basis
    • Kelly, J. E. (1961). "Critical path planning and scheduling: Mathematical basis." Oper. Res., 9(3), 167-179.
    • (1961) Oper. Res. , vol.9 , Issue.3 , pp. 167-179
    • Kelly, J.E.1
  • 11
    • 12744251343 scopus 로고    scopus 로고
    • Use of fuzzy logic for predicting design cost overruns on building projects
    • Knight, K., and Fayek, A. R. (2002). "Use of fuzzy logic for predicting design cost overruns on building projects." J. Constr. Eng. Manage., 128(6), 503-512.
    • (2002) J. Constr. Eng. Manage. , vol.128 , Issue.6 , pp. 503-512
    • Knight, K.1    Fayek, A.R.2
  • 12
    • 0035193271 scopus 로고    scopus 로고
    • A GA-based fuzzy optimal model for construction time-cost trade-off
    • Leu, S. S., Chen, A. T., and Yang, C. H. (2001). "A GA-based fuzzy optimal model for construction time-cost trade-off." Int. J. Proj. Manage., 19(1), 47-58.
    • (2001) Int. J. Proj. Manage. , vol.19 , Issue.1 , pp. 47-58
    • Leu, S.S.1    Chen, A.T.2    Yang, C.H.3
  • 13
    • 0029470313 scopus 로고
    • Construction time-cost trade-off analysis using LP/IP hybrid method
    • Liu, L., Burns, S., and Feng, C. (1995). "Construction time-cost trade-off analysis using LP/IP hybrid method." J, Constr. Eng. Manage., 121(4), 446-454.
    • (1995) J, Constr. Eng. Manage. , vol.121 , Issue.4 , pp. 446-454
    • Liu, L.1    Burns, S.2    Feng, C.3
  • 14
    • 5244262334 scopus 로고    scopus 로고
    • Using improved genetic algorithms to facilitate time-cost optimization
    • Li, H., and Love, P. E. (1997). "Using improved genetic algorithms to facilitate time-cost optimization." J. Constr. Eng. Manage., 123(3), 233-237.
    • (1997) J. Constr. Eng. Manage. , vol.123 , Issue.3 , pp. 233-237
    • Li, H.1    Love, P.E.2
  • 15
    • 0032638332 scopus 로고    scopus 로고
    • Using machine learning and GA to solve time-cost trade-off problems
    • Li, H., Cao, J. N., and Love, P. E. (1999). "Using machine learning and GA to solve time-cost trade-off problems." J. Constr. Eng. Manage., 125(5), 347-353.
    • (1999) J. Constr. Eng. Manage. , vol.125 , Issue.5 , pp. 347-353
    • Li, H.1    Cao, J.N.2    Love, P.E.3
  • 16
    • 0000732919 scopus 로고    scopus 로고
    • Project-network analysis using fuzzy sets theory
    • Lorterapong, P., and Moselhi, O. (1996). "Project-network analysis using fuzzy sets theory." J. Constr. Eng. Manage., 122(4), 308-318.
    • (1996) J. Constr. Eng. Manage. , vol.122 , Issue.4 , pp. 308-318
    • Lorterapong, P.1    Moselhi, O.2
  • 17
    • 0027545671 scopus 로고
    • Schedule compression using the direct stiffness method
    • Moselhi, O. (1993). "Schedule compression using the direct stiffness method." Can. J. Civ. Eng., 20(1), 65-72.
    • (1993) Can. J. Civ. Eng. , vol.20 , Issue.1 , pp. 65-72
    • Moselhi, O.1
  • 18
    • 12344311786 scopus 로고    scopus 로고
    • A conceptual case-based decision module for mitigating construction delays
    • Ng, S. T., Deng, M. Z. M., Skitmore, R. M., and Lam, K. C. (2000). "A conceptual case-based decision module for mitigating construction delays." Int. J. Constr. Inf. Technol., 8(2), 1-20.
    • (2000) Int. J. Constr. Inf. Technol. , vol.8 , Issue.2 , pp. 1-20
    • Ng, S.T.1    Deng, M.Z.M.2    Skitmore, R.M.3    Lam, K.C.4
  • 19
    • 0036540210 scopus 로고    scopus 로고
    • Fuzzy membership functions of procurement selection criteria
    • Ng, S. T., Luu, D. T., Chen, S. E., and Lam, K. C. (2002). "Fuzzy membership functions of procurement selection criteria." Constr. Manage. Econom., 20(3), 285-296.
    • (2002) Constr. Manage. Econom. , vol.20 , Issue.3 , pp. 285-296
    • Ng, S.T.1    Luu, D.T.2    Chen, S.E.3    Lam, K.C.4
  • 20
    • 19244376018 scopus 로고
    • A simple CPM time-cost trade-off algorithm
    • Siemens, N. (1971). "A simple CPM time-cost trade-off algorithm." Manage. Sci., 17(6), 354-363.
    • (1971) Manage. Sci. , vol.17 , Issue.6 , pp. 354-363
    • Siemens, N.1
  • 22
    • 34248666540 scopus 로고
    • Fuzzy sets
    • Zadeh, L. A. (1965). "Fuzzy sets." Inf. Control, 8(3), 338-353.
    • (1965) Inf. Control , vol.8 , Issue.3 , pp. 338-353
    • Zadeh, L.A.1
  • 23
    • 1642598653 scopus 로고    scopus 로고
    • Application of fuzzy logic to simulation for construction operations
    • Zhang, H., Tam, C. M., and Shi, J. (2003). "Application of fuzzy logic to simulation for construction operations." J. Comput. Civ. Eng., 17(1), 38-45.
    • (2003) J. Comput. Civ. Eng. , vol.17 , Issue.1 , pp. 38-45
    • Zhang, H.1    Tam, C.M.2    Shi, J.3
  • 24
    • 2342615793 scopus 로고    scopus 로고
    • Applying a Genetic Algorithm-based multiobjective approach for time-cost optimization
    • Zheng, D. X. M., Ng, T. S. T., and Kumaraswamy, M. M. (2004). "Applying a Genetic Algorithm-based multiobjective approach for time-cost optimization." J. Constr. Eng. Manage., 130(2), 168-176.
    • (2004) J. Constr. Eng. Manage. , vol.130 , Issue.2 , pp. 168-176
    • Zheng, D.X.M.1    Ng, T.S.T.2    Kumaraswamy, M.M.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.