메뉴 건너뛰기




Volumn 133, Issue 7, 2007, Pages 498-505

Using elitist particle swarm optimization to facilitate bicriterion time-cost trade-off analysis

Author keywords

Algorithms; Computer aided scheduling; Construction industry; Multiple objective analysis; Optimization

Indexed keywords

ALGORITHMS; CONSTRUCTION INDUSTRY; COST FUNCTIONS; PARETO PRINCIPLE;

EID: 34250644399     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0733-9364(2007)133:7(498)     Document Type: Article
Times cited : (96)

References (36)
  • 1
    • 24344505520 scopus 로고    scopus 로고
    • A MOPSO algorithm based exclusively on Pareto dominance concepts
    • Springer, Heidelberg, Germany
    • Alvarez-Benitez, J. E., Everson, R. M., and Fieldsend, J. E. (2005). " A MOPSO algorithm based exclusively on Pareto dominance concepts.. " Lecture notes in computer science, Springer, Heidelberg, Germany, 459-473.
    • (2005) Lecture Notes in Computer Science , pp. 459-473
    • Alvarez-Benitez, J.E.1    Everson, R.M.2    Fieldsend, J.E.3
  • 2
    • 0035350696 scopus 로고    scopus 로고
    • Swarm intelligence: A whole new way to think about business
    • Bonabeau, E., and Meyer, C. (2001). " Swarm intelligence: A whole new way to think about business.. " Harvard Bus. Rev., 79 (5), 107-114.
    • (2001) Harvard Bus. Rev. , vol.79 , Issue.5 , pp. 107-114
    • Bonabeau, E.1    Meyer, C.2
  • 3
    • 0004374576 scopus 로고    scopus 로고
    • A time-cost trade-off model with resource consideration using genetic algorithm
    • Chua, D. K. H., Chan, W. T., and Govindan, K. (1997). " A time-cost trade-off model with resource consideration using genetic algorithm.. " Civ. Eng. Syst., 14, 291-311.
    • (1997) Civ. Eng. Syst. , vol.14 , pp. 291-311
    • Chua, D.K.H.1    Chan, W.T.2    Govindan, K.3
  • 4
    • 3142756516 scopus 로고    scopus 로고
    • Handling multiple objectives with particle swarm optimization
    • Coello, C. A. C., Pulido, G. T., and Lechuga, M. S. (2004). " Handling multiple objectives with particle swarm optimization.. " IEEE Trans. Evol. Comput., 8 (3), 256-279.
    • (2004) IEEE Trans. Evol. Comput. , vol.8 , Issue.3 , pp. 256-279
    • Coello, C.A.C.1    Pulido, G.T.2    Lechuga, M.S.3
  • 5
    • 0029632618 scopus 로고
    • The discrete time-cost trade-off problem revisited
    • De, P., Dunne, E. J., Ghosh, J. B., and Welles, C. E. (1995). " The discrete time-cost trade-off problem revisited.. " Eur. J. Oper. Res., 81 (2), 225-238.
    • (1995) Eur. J. Oper. Res. , vol.81 , Issue.2 , pp. 225-238
    • De, P.1    Dunne, E.J.2    Ghosh, J.B.3    Welles, C.E.4
  • 7
    • 18444417707 scopus 로고    scopus 로고
    • Searching for better negotiation agreement based on genetic algorithm
    • Dzeng, R. J., and Lin, Y. C. (2005). " Searching for better negotiation agreement based on genetic algorithm.. " Comput. Aided Civ. Infrastruct. Eng., 20 (4), 280-293.
    • (2005) Comput. Aided Civ. Infrastruct. Eng. , vol.20 , Issue.4 , pp. 280-293
    • Dzeng, R.J.1    Lin, Y.C.2
  • 8
    • 0027302082 scopus 로고
    • Resource allocation via dynamic programming in activity networks
    • Elmaghraby, S. E. (1993). " Resource allocation via dynamic programming in activity networks.. " Eur. J. Oper. Res., 64, 199-215.
    • (1993) Eur. J. Oper. Res. , vol.64 , pp. 199-215
    • Elmaghraby, S.E.1
  • 10
    • 0015484051 scopus 로고
    • Critical path problems with concave cost-time curves
    • Falk, J., and Horowitz, J. L. (1972). " Critical path problems with concave cost-time curves.. " Manage. Sci., 19, 446-455.
    • (1972) Manage. Sci. , vol.19 , pp. 446-455
    • Falk, J.1    Horowitz, J.L.2
  • 11
    • 0031185451 scopus 로고    scopus 로고
    • Using genetic algorithms to solve construction time-cost trade-off problems
    • Feng, C. W., Liu, L. Y., and Burns, S. A. (1997). " Using genetic algorithms to solve construction time-cost trade-off problems.. " J. Comput. Civ. Eng., 11 (3), 184-189.
    • (1997) J. Comput. Civ. Eng. , vol.11 , Issue.3 , pp. 184-189
    • Feng, C.W.1    Liu, L.Y.2    Burns, S.A.3
  • 12
    • 0037803427 scopus 로고    scopus 로고
    • Using unconstrained elite archives for multi-objective optimization
    • Fieldsend, J. E., Everson, R. M., and Singh, S. (2003). " Using unconstrained elite archives for multi-objective optimization.. " IEEE Trans. Evol. Comput., 7 (3), 305-323.
    • (2003) IEEE Trans. Evol. Comput. , vol.7 , Issue.3 , pp. 305-323
    • Fieldsend, J.E.1    Everson, R.M.2    Singh, S.3
  • 13
    • 0027222453 scopus 로고
    • PERT and crashing revisited: Mathematical generalizations
    • Foldes, S., and Soumis, F. (1993). " PERT and crashing revisited: Mathematical generalizations.. " Eur. J. Oper. Res., 64, 286-294.
    • (1993) Eur. J. Oper. Res. , vol.64 , pp. 286-294
    • Foldes, S.1    Soumis, F.2
  • 14
    • 0000181338 scopus 로고
    • A network flow computation for project cost curves
    • Fulkerson, D. R. (1961). " A network flow computation for project cost curves.. " Manage. Sci., 7, 167-178.
    • (1961) Manage. Sci. , vol.7 , pp. 167-178
    • Fulkerson, D.R.1
  • 16
    • 0033497302 scopus 로고    scopus 로고
    • Optimization of construction time-cost trade-off analysis using genetic algorithms
    • Hegazy, T. (1999). " Optimization of construction time-cost trade-off analysis using genetic algorithms.. " Can. J. Civ. Eng., 26 (6), 685-697.
    • (1999) Can. J. Civ. Eng. , vol.26 , Issue.6 , pp. 685-697
    • Hegazy, T.1
  • 17
    • 34250621813 scopus 로고
    • Project crashing with variations in reward and penalty functions: Some mathematical programming formulations
    • Kanda, A., and Singh, N. (1988). " Project crashing with variations in reward and penalty functions: Some mathematical programming formulations.. " Eng. Optimiz., 13 (4), 307-315.
    • (1988) Eng. Optimiz. , vol.13 , Issue.4 , pp. 307-315
    • Kanda, A.1    Singh, N.2
  • 19
    • 0033312040 scopus 로고    scopus 로고
    • GA-based multicriteria optimal model for construction scheduling
    • Leu, S. S., and Yang, C. H. (1999). " GA-based multicriteria optimal model for construction scheduling.. " J. Constr. Eng. Manage., 125 (6), 420-427.
    • (1999) J. Constr. Eng. Manage. , vol.125 , Issue.6 , pp. 420-427
    • Leu, S.S.1    Yang, C.H.2
  • 20
    • 0032638332 scopus 로고    scopus 로고
    • Using machine learning and GA to solve time-cost trade-off problems
    • Li, H., Cao, J. N., and Love, P. E. D. (1999). " Using machine learning and GA to solve time-cost trade-off problems.. " J. Constr. Eng. Manage., 125 (5), 347-353.
    • (1999) J. Constr. Eng. Manage. , vol.125 , Issue.5 , pp. 347-353
    • Li, H.1    Cao, J.N.2    Love, P.E.D.3
  • 21
    • 5244262334 scopus 로고    scopus 로고
    • Improved genetic algorithms for time-cost optimization
    • Li, H., and Love, P. E. D. (1997). " Improved genetic algorithms for time-cost optimization.. " J. Constr. Eng. Manage., 123 (3), 233-237.
    • (1997) J. Constr. Eng. Manage. , vol.123 , Issue.3 , pp. 233-237
    • Li, H.1    Love, P.E.D.2
  • 22
    • 0029470313 scopus 로고
    • Construction time-cost trade-off analysis using LP/IP hybrid method
    • Liu, L. Y., Burns, S. A., and Feng, C. W. (1995). " Construction time-cost trade-off analysis using LP/IP hybrid method.. " J. Constr. Eng. Manage., 121 (4), 446-454.
    • (1995) J. Constr. Eng. Manage. , vol.121 , Issue.4 , pp. 446-454
    • Liu, L.Y.1    Burns, S.A.2    Feng, C.W.3
  • 24
    • 13944265628 scopus 로고    scopus 로고
    • Flexible model for time-cost trade-off problem
    • Moussourakis, J., and Haksever, C. (2004). " Flexible model for time-cost trade-off problem.. " J. Constr. Eng. Manage., 130 (3), 307-314.
    • (2004) J. Constr. Eng. Manage. , vol.130 , Issue.3 , pp. 307-314
    • Moussourakis, J.1    Haksever, C.2
  • 25
    • 0017638717 scopus 로고
    • Solving the project time-cost trade-off problem using the minimal cut concept
    • Phillips, S., and Dessouky, M. I. (1977). " Solving the project time-cost trade-off problem using the minimal cut concept.. " Manage. Sci., 24, 393-400.
    • (1977) Manage. Sci. , vol.24 , pp. 393-400
    • Phillips, S.1    Dessouky, M.I.2
  • 26
    • 0006690345 scopus 로고
    • Time-cost trade-offs among related activities
    • Reda, R. M., and Carr, R. I. (1989). " Time-cost trade-offs among related activities.. " J. Constr. Eng. Manage., 115 (3), 475-486.
    • (1989) J. Constr. Eng. Manage. , vol.115 , Issue.3 , pp. 475-486
    • Reda, R.M.1    Carr, R.I.2
  • 27
    • 84879015433 scopus 로고    scopus 로고
    • Parameter selection in particle swarm optimization
    • V. W.Porto, N.Saravanan, D.Waagen, and A. E.Eiben, eds., Springer, Berlin, Germany
    • Shi, Y., and Eberhart, R. C. (1998). " Parameter selection in particle swarm optimization.. " Lecture notes in computer science 1447: Evolutionary programming VII, V. W. Porto, N. Saravanan, D. Waagen, and, A. E. Eiben, eds., Springer, Berlin, Germany, 591-600.
    • (1998) Lecture Notes in Computer Science 1447: Evolutionary Programming VII , pp. 591-600
    • Shi, Y.1    Eberhart, R.C.2
  • 28
    • 0032208139 scopus 로고    scopus 로고
    • Approximation algorithms for the discrete time-cost trade-off problem
    • Skutella, M. (1998). " Approximation algorithms for the discrete time-cost trade-off problem.. " Math. Op. Res., 23 (4), 909-929.
    • (1998) Math. Op. Res. , vol.23 , Issue.4 , pp. 909-929
    • Skutella, M.1
  • 29
    • 31944448941 scopus 로고    scopus 로고
    • A study of particle swarm optimization particle trajectories
    • van den Bergh, F., and Engelbrecht, A. P. (2006). " A study of particle swarm optimization particle trajectories.. " Inf. Sci. (N.Y.), 176 (8), 937-971.
    • (2006) Inf. Sci. (N.Y.) , vol.176 , Issue.8 , pp. 937-971
    • Van Den Bergh, F.1    Engelbrecht, A.P.2
  • 30
    • 3142674350 scopus 로고    scopus 로고
    • An approach to multimodal biomedical image registration utilizing particle swarm optimization
    • Wachowiak, M. P., Smolikova, R., Zheng, Y., Zurada, J. M., and Elmaghraby, A. S. (2004). " An approach to multimodal biomedical image registration utilizing particle swarm optimization.. " IEEE Trans. Evol. Comput., 8 (3), 289-301.
    • (2004) IEEE Trans. Evol. Comput. , vol.8 , Issue.3 , pp. 289-301
    • Wachowiak, M.P.1    Smolikova, R.2    Zheng, Y.3    Zurada, J.M.4    Elmaghraby, A.S.5
  • 31
    • 0031118203 scopus 로고    scopus 로고
    • The no free lunch theorems for optimization
    • Wolpert, D. H., and Macready, W. G. (1997). " The no free lunch theorems for optimization.. " IEEE Trans. Evol. Comput., 1 (1), 67-82.
    • (1997) IEEE Trans. Evol. Comput. , vol.1 , Issue.1 , pp. 67-82
    • Wolpert, D.H.1    MacReady, W.G.2
  • 32
    • 24944537152 scopus 로고    scopus 로고
    • Chance-constrained time-cost tradeoff analysis considering funding variability
    • Yang, I. T. (2005a). " Chance-constrained time-cost tradeoff analysis considering funding variability.. " J. Constr. Eng. Manage., 131 (9), 1002-1012.
    • (2005) J. Constr. Eng. Manage. , vol.131 , Issue.9 , pp. 1002-1012
    • Yang, I.T.1
  • 33
    • 18544385344 scopus 로고    scopus 로고
    • Impact of budget uncertainty on project time-cost tradeoff
    • Yang, I. T. (2005b). " Impact of budget uncertainty on project time-cost tradeoff.. " IEEE Trans. Eng. Manage., 52 (2), 167-174.
    • (2005) IEEE Trans. Eng. Manage. , vol.52 , Issue.2 , pp. 167-174
    • Yang, I.T.1
  • 34
    • 13244273704 scopus 로고    scopus 로고
    • Particle swarm optimization-based schemes for resource-constrained project scheduling
    • Zhang, H., Li, X., Li, H., and Huang, F. (2005). " Particle swarm optimization-based schemes for resource-constrained project scheduling.. " Autom. Constr., 14 (3), 393-404.
    • (2005) Autom. Constr. , vol.14 , Issue.3 , pp. 393-404
    • Zhang, H.1    Li, X.2    Li, H.3    Huang, F.4
  • 35
    • 2342615793 scopus 로고    scopus 로고
    • Applying a genetic algorithm-based multiobjective approach for time-cost optimization
    • Zheng, D. X. M., Ng, S. T., and Kumaraswamy, M. M. (2004). " Applying a genetic algorithm-based multiobjective approach for time-cost optimization.. " J. Constr. Eng. Manage., 130 (2), 168-176.
    • (2004) J. Constr. Eng. Manage. , vol.130 , Issue.2 , pp. 168-176
    • Zheng, D.X.M.1    Ng, S.T.2    Kumaraswamy, M.M.3
  • 36
    • 12344265028 scopus 로고    scopus 로고
    • Applying Pareto ranking and niche formation to genetic algorithm-based multiobjective time-cost optimization
    • Zheng, D. X. M., Ng, S. T., and Kumaraswamy, M. M. (2005). " Applying Pareto ranking and niche formation to genetic algorithm-based multiobjective time-cost optimization.. " J. Constr. Eng. Manage., 131 (1), 81-91.
    • (2005) J. Constr. Eng. Manage. , vol.131 , Issue.1 , pp. 81-91
    • Zheng, D.X.M.1    Ng, S.T.2    Kumaraswamy, M.M.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.