Volumn 128, Issue 6, 2002, Pages 503-512

Use of fuzzy logic for predicting design cost overruns on building projects

Author keywords

Construction; Cost control; Decision making; Fuzzy sets; Project management

Indexed keywords

COST BENEFIT ANALYSIS; DECISION MAKING; FORMAL LOGIC; MATHEMATICAL MODELS; PROJECT MANAGEMENT; RISK MANAGEMENT; STANDARDS;

EID: 12744251343     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0733-9364(2002)128:6(503)     Document Type: Article
Times cited : (79)

References (15)
  • 1
    • 0042585041 scopus 로고
    • Construction industry clients: A survey of their attributes and project management practices
    • Bresnen, M. J., and Haslam, C. O. (1991). "Construction industry clients: A survey of their attributes and project management practices." Constr. Manage. Econom., 9, 327-342.
    • (1991) Constr. Manage. Econom. , vol.9 , pp. 327-342
    • Bresnen, M.J.1    Haslam, C.O.2
  • 3
    • 0042084015 scopus 로고
    • Publication 6-2, Cost/Schedule Controls Task Force, Austin, Tex.
    • Construction Industry Institute (CII). (1986). "Scope definition and control." Publication 6-2, Cost/Schedule Controls Task Force, Austin, Tex.
    • (1986) Scope Definition and Control
  • 4
    • 13944261278 scopus 로고    scopus 로고
    • PDRI: Project definition rating index - Industrial projects
    • Front End Planning Research Team, Austin, Tex.
    • Construction Industry Institute (CII). (1996). "PDRI: Project definition rating index - Industrial projects." Implementation Resource, 113-2, Front End Planning Research Team, Austin, Tex.
    • (1996) Implementation Resource , vol.113 , Issue.2
  • 5
    • 63049092049 scopus 로고    scopus 로고
    • PDRI: Project definition rating index-building projects
    • PDRI for Building Projects Research Team, Austin, Tex.
    • Construction Industry Institute (CII). (1999). "PDRI: Project definition rating index-Building projects." Implementation Resource, 155-2, PDRI for Building Projects Research Team, Austin, Tex.
    • (1999) Implementation Resource , vol.155 , Issue.2
  • 6
    • 0004603683 scopus 로고    scopus 로고
    • A quantitative study of post contract award design changes in construction
    • Cox, I. D., Morris, J. P., Rogerson, J. H., and Tared, G. E. (1999). "A quantitative study of post contract award design changes in construction." Constr. Manage. Econom., 17, 427-439.
    • (1999) Constr. Manage. Econom. , vol.17 , pp. 427-439
    • Cox, I.D.1    Morris, J.P.2    Rogerson, J.H.3    Tared, G.E.4
  • 7
    • 0031235507 scopus 로고    scopus 로고
    • Scope management using project definition rating index
    • Dumont, P. R., Gibson, Jr., G. E., and Fish, J. R. (1997). "Scope management using project definition rating index." J. Manage. Eng., 13(5), 54-60.
    • (1997) J. Manage. Eng. , vol.13 , Issue.5 , pp. 54-60
    • Dumont, P.R.1    Gibson Jr., G.E.2    Fish, J.R.3
  • 8
    • 0030721785 scopus 로고    scopus 로고
    • Scope development problems in estimating
    • Morgantown, W. Va.
    • Dysert, L. R. (1997). "Scope development problems in estimating." Transactions, AACE Int., Morgantown, W. Va., 128-131.
    • (1997) Transactions, AACE Int. , pp. 128-131
    • Dysert, L.R.1
  • 9
    • 2342423753 scopus 로고
    • Improving constructability during design phase
    • Glavinich, T. E. (1995). "Improving constructability during design phase." J. Archit. Eng., 1(2), 73-76.
    • (1995) J. Archit. Eng. , vol.1 , Issue.2 , pp. 73-76
    • Glavinich, T.E.1
  • 11
    • 0343263572 scopus 로고
    • Quantifying client-generated risk by project consultants
    • Kometa, S. T., Olomolaiye, P. O., and Harris, F. C. (1995). "Quantifying client-generated risk by project consultants." Constr. Manage. Econom., 13, 137-147.
    • (1995) Constr. Manage. Econom. , vol.13 , pp. 137-147
    • Kometa, S.T.1    Olomolaiye, P.O.2    Harris, F.C.3
  • 12
    • 0342393999 scopus 로고    scopus 로고
    • Validation of the model for evaluating client-generated risk by project consultants
    • Kometa, S. T., Olomolaiye, P. O., and Harris, F. C. (1996). "Validation of the model for evaluating client-generated risk by project consultants." Constr. Manage. Econom., 14, 131-145.
    • (1996) Constr. Manage. Econom. , vol.14 , pp. 131-145
    • Kometa, S.T.1    Olomolaiye, P.O.2    Harris, F.C.3
  • 13
    • 2142718584 scopus 로고    scopus 로고
    • Modelling the dynamics of design error induced rework in construction
    • Love, P. E. D., Mandai, P., Smith, J., and Li, H. (2000). "Modelling the dynamics of design error induced rework in construction." Constr. Manage. Econom., 18, 567-574.
    • (2000) Constr. Manage. Econom. , vol.18 , pp. 567-574
    • Love, P.E.D.1    Mandai, P.2    Smith, J.3    Li, H.4
  • 14
    • 0024088979 scopus 로고
    • Design productivity: Quality problem
    • McGeorge, J. F. (1988). "Design productivity: Quality problem." J. Manage. Eng., 4(4), 350-362.
    • (1988) J. Manage. Eng. , vol.4 , Issue.4 , pp. 350-362
    • McGeorge, J.F.1
  • 15
    • 0022128664 scopus 로고
    • Tender evaluation by fuzzy sets
    • Nguyen, V. U. (1985). "Tender evaluation by fuzzy sets." J. Constr. Eng. Manage., 111(3), 231-243.
    • (1985) J. Constr. Eng. Manage. , vol.111 , Issue.3 , pp. 231-243
    • Nguyen, V.U.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.