-
1
-
-
0028518189
-
Optimal resource leveling using non-serial dynamic programming
-
Bandelloni, M., Tucci, M., and Rinaldi, R. (1994). "Optimal resource leveling using non-serial dynamic programming." Eur. J. Operation Res., 78(2), 162-177.
-
(1994)
Eur. J. Operation Res.
, vol.78
, Issue.2
, pp. 162-177
-
-
Bandelloni, M.1
Tucci, M.2
Rinaldi, R.3
-
2
-
-
0002679297
-
Variation in activity level on a cyclic arrow diagram
-
Burgess, A. R., and Killebrew, J. B. (1962). "Variation in activity level on a cyclic arrow diagram." J. Industrial Engrg., 13(2), 76-83.
-
(1962)
J. Industrial Engrg.
, vol.13
, Issue.2
, pp. 76-83
-
-
Burgess, A.R.1
Killebrew, J.B.2
-
3
-
-
0001195356
-
Resource leveling in construction by optimization
-
ASCE
-
Easa, S. M. (1989). "Resource leveling in construction by optimization." J. Constr. Engrg. and Mgmt., ASCE, 115(2), 302-316.
-
(1989)
J. Constr. Engrg. and Mgmt.
, vol.115
, Issue.2
, pp. 302-316
-
-
Easa, S.M.1
-
5
-
-
0025444361
-
Packing method for resource leveling (pack)
-
ASCE
-
Harris, R. B. (1990). "Packing method for resource leveling (pack)." J. Constr. Engrg. and Mgmt., ASCE, 116(2), 331-350.
-
(1990)
J. Constr. Engrg. and Mgmt.
, vol.116
, Issue.2
, pp. 331-350
-
-
Harris, R.B.1
-
6
-
-
26444479778
-
Optimization by simulated annealing
-
Kirkpatrick, S., Gellat, C. D., and Veccchi, M. P. (1983). "Optimization by simulated annealing." Sci., 220, 671-680.
-
(1983)
Sci.
, vol.220
, pp. 671-680
-
-
Kirkpatrick, S.1
Gellat, C.D.2
Veccchi, M.P.3
-
7
-
-
0039466086
-
Multiship, multishop, workload-smoothing program
-
Levy, F. K., Thompson, G. L., and Wiest, J. D. (1962). "Multiship, multishop, workload-smoothing program." Naval Res. Logistics Quarterly, 9(1), 37-44.
-
(1962)
Naval Res. Logistics Quarterly
, vol.9
, Issue.1
, pp. 37-44
-
-
Levy, F.K.1
Thompson, G.L.2
Wiest, J.D.3
-
8
-
-
0027308352
-
Resource leveling based on the modified minimum moment heuristic
-
ASCE, Reston, Va.
-
Martinez, J., and Ioannou, P. (1993). "Resource leveling based on the modified minimum moment heuristic." Proc., 5th Int. Conf., Computing in Civ. and Build. Engrg., ASCE, Reston, Va., 287-294.
-
(1993)
Proc., 5th Int. Conf., Computing in Civ. and Build. Engrg.
, pp. 287-294
-
-
Martinez, J.1
Ioannou, P.2
-
9
-
-
0343370619
-
-
Wiley, New York
-
Popescu, C. M., and Charoenngam, C. (1995). Project planning, scheduling, and control in construction. Wiley, New York.
-
(1995)
Project Planning, Scheduling, and Control in Construction
-
-
Popescu, C.M.1
Charoenngam, C.2
-
10
-
-
0030216667
-
Construction resource leveling using neural networks
-
Savin, D., Alkass, S., and Fazio, P. (1996). "Construction resource leveling using neural networks." Can. J. Civ. Engrg., 23(3), 917-925.
-
(1996)
Can. J. Civ. Engrg.
, vol.23
, Issue.3
, pp. 917-925
-
-
Savin, D.1
Alkass, S.2
Fazio, P.3
|