-
1
-
-
0000774090
-
Manufacturing strategy: Experiences from select Indian organizations
-
G.S. Dangayach, and S.G. Deshmukh Manufacturing strategy: experiences from select Indian organizations J Manuf Syst 19 2 2000 134 148
-
(2000)
J Manuf Syst
, vol.19
, Issue.2
, pp. 134-148
-
-
Dangayach, G.S.1
Deshmukh, S.G.2
-
3
-
-
34250111322
-
Design, planning, scheduling and control problems in flexible manufacturing systems
-
K.E. Stecke Design, planning, scheduling and control problems in flexible manufacturing systems Ann Oper Res 3 1 1985 3 12
-
(1985)
Ann Oper Res
, vol.3
, Issue.1
, pp. 3-12
-
-
Stecke, K.E.1
-
4
-
-
61749101177
-
Application of the analytical hierarchy process for real-time scheduling and part routing in advanced manufacturing systems
-
N. Buyurgan, and C. Saygin Application of the analytical hierarchy process for real-time scheduling and part routing in advanced manufacturing systems J Manuf Syst 27 3 2008 101 110
-
(2008)
J Manuf Syst
, vol.27
, Issue.3
, pp. 101-110
-
-
Buyurgan, N.1
Saygin, C.2
-
5
-
-
3042692204
-
Survey on the use of simulation for manufacturing system design and operation
-
J.S. Smith Survey on the use of simulation for manufacturing system design and operation J Manuf Syst 22 2 2003 157 171
-
(2003)
J Manuf Syst
, vol.22
, Issue.2
, pp. 157-171
-
-
Smith, J.S.1
-
6
-
-
48049100176
-
Simulation-based planning and control: From shop floor to top floor
-
S. Lee, Y. Son, and R.A. Wysk Simulation-based planning and control: from shop floor to top floor J Manuf Syst 26 2 2007 85 98
-
(2007)
J Manuf Syst
, vol.26
, Issue.2
, pp. 85-98
-
-
Lee, S.1
Son, Y.2
Wysk, R.A.3
-
7
-
-
0031653508
-
Development of Dispatching Rules for Automated Guided Vehicle Systems
-
H. Hwang, and S.H. Kim Development of dispatching rules for automated guided vehicle systems J Manuf Syst 17 2 1998 137 143 (Pubitemid 128447052)
-
(1998)
Journal of Manufacturing Systems
, vol.17
, Issue.2
, pp. 137-143
-
-
Hwang, H.1
Kim, S.H.2
-
8
-
-
0032300808
-
An Analytical Approach for Using Simulation in Real-Time Decision Making in FMSs
-
N.S. Merchawi, and H.A. ElMaraghy An analytical approach for using simulation in real-time decision making in FMSs J Manuf Syst 17 6 1998 418 435 (Pubitemid 128445229)
-
(1998)
Journal of Manufacturing Systems
, vol.17
, Issue.6
, pp. 418-435
-
-
Merchawi, N.S.1
ElMaraghy, H.A.2
-
9
-
-
0042370532
-
Simulation-based shop floor control
-
Y. Son, S.B. Joshi, R.A. Wysk, and J.S. Smith Simulation-based shop floor control J Manuf Syst 21 5 2002 380 394 (Pubitemid 135693332)
-
(2002)
Journal of Manufacturing Systems
, vol.21
, Issue.5
, pp. 380-394
-
-
Son, Y.-J.1
Joshi, S.B.2
Wysk, R.A.3
Smith, J.S.4
-
10
-
-
42949106196
-
A robust FMS control architecture with an embedded adaptive scheduling mechanism
-
DOI 10.1016/S0278-6125(06)80242-6, PII S0278612506802426
-
D. Sinreich, and B. Shnits A robust FMS control architecture with an embedded adaptive scheduling mechanism J Manuf Syst 25 4 2006 301 312 (Pubitemid 351608742)
-
(2006)
Journal of Manufacturing Systems
, vol.25
, Issue.4
, pp. 301-312
-
-
Sinreich, D.1
Shnits, B.2
-
11
-
-
77955421552
-
The simulation design and analysis of a flexible manufacturing system with automated guided vehicle system
-
I. Um, H. Cheon, and H. Lee The simulation design and analysis of a flexible manufacturing system with automated guided vehicle system J Manuf Syst 28 4 2009 115 122
-
(2009)
J Manuf Syst
, vol.28
, Issue.4
, pp. 115-122
-
-
Um, I.1
Cheon, H.2
Lee, H.3
-
12
-
-
0000424475
-
Classification of flexible manufacturing systems
-
J. Browne, D. Dubois, K. Rathmill, S.P. Sethi, and K.E. Stecke Classification of flexible manufacturing systems FMS Mag 2 2 1984 114 117
-
(1984)
FMS Mag
, vol.2
, Issue.2
, pp. 114-117
-
-
Browne, J.1
Dubois, D.2
Rathmill, K.3
Sethi, S.P.4
Stecke, K.E.5
-
13
-
-
34248539177
-
Flexibility in manufacturing: A survey
-
A.K. Sethi, and S.P. Sethi Flexibility in manufacturing: a survey Int J Flex Manuf Syst 2 1990 289 329
-
(1990)
Int J Flex Manuf Syst
, vol.2
, pp. 289-329
-
-
Sethi, A.K.1
Sethi, S.P.2
-
14
-
-
0033737562
-
A review of empirical research on manufacturing flexibility
-
R.J. Vokurka, and S.W. O' Leary Kelly A review of empirical research on manufacturing flexibility J Oper Manag 18 2000 485 501
-
(2000)
J Oper Manag
, vol.18
, pp. 485-501
-
-
Vokurka, R.J.1
Leary Kelly, S.W.O.2
-
15
-
-
0035479473
-
Computer simulation of due-date setting in multi-machine job shops
-
DOI 10.1016/S0360-8352(01)00043-2, PII S0360835201000432
-
E.A. Veral Computer simulation of due-date setting in multi-machine job shops Comp Ind Eng 41 1 2001 77 94 (Pubitemid 32842062)
-
(2001)
Computers and Industrial Engineering
, vol.41
, Issue.1
, pp. 77-94
-
-
Veral, E.A.1
-
16
-
-
48049102820
-
Distributed adaptive control of production scheduling and machine capacity
-
S. Cho, and V.V. Prabhu Distributed adaptive control of production scheduling and machine capacity J Manuf Syst 26 2 2007 65 74
-
(2007)
J Manuf Syst
, vol.26
, Issue.2
, pp. 65-74
-
-
Cho, S.1
Prabhu, V.V.2
-
17
-
-
0021496929
-
Sequencing rules and due-date assignments in a job shop
-
K.R. Baker Sequencing rules and due-date assignments in a job shop Manage Sci 30 9 1984 1093 1104
-
(1984)
Manage Sci
, vol.30
, Issue.9
, pp. 1093-1104
-
-
Baker, K.R.1
-
18
-
-
38249015821
-
Simulation studies of multilevel dynamic job shop scheduling using heuristic dispatching rules
-
M.N. Karsiti, J.B. Cruz Jr., and J.H. Mulligan Jr. Simulation studies of multilevel dynamic job shop scheduling using heuristic dispatching rules J Manuf Syst 11 3 1992 137 143
-
(1992)
J Manuf Syst
, vol.11
, Issue.3
, pp. 137-143
-
-
Karsiti, M.N.1
Cruz Jr., J.B.2
Mulligan Jr., J.H.3
-
19
-
-
0001870328
-
A simulation analysis of due-date assignment rules
-
G.L. Ragatz, and V.A. Mabert A simulation analysis of due-date assignment rules J Oper Manag 5 1 1984 27 39
-
(1984)
J Oper Manag
, vol.5
, Issue.1
, pp. 27-39
-
-
Ragatz, G.L.1
Mabert, V.A.2
-
20
-
-
0026186620
-
Dynamic rules for due-date assignment
-
M.M. Vig, and K.J. Dooley Dynamic rules for due-date assignment Int J Prod Res 29 7 1991 1361 1377
-
(1991)
Int J Prod Res
, vol.29
, Issue.7
, pp. 1361-1377
-
-
Vig, M.M.1
Dooley, K.J.2
-
21
-
-
0028730645
-
A study of factors affecting due-date predictability in a simulation dynamic job shops
-
F.C.R. Chang A study of factors affecting due-date predictability in a simulation dynamic job shops J Manuf Syst 13 1994 393 400
-
(1994)
J Manuf Syst
, vol.13
, pp. 393-400
-
-
Chang, F.C.R.1
-
22
-
-
0001153814
-
A dynamic forecasting model for job shop flow time prediction and tardiness control
-
S.T. Enns A dynamic forecasting model for job shop flow time prediction and tardiness control Int J Prod Res 33 5 1995 1295 1312
-
(1995)
Int J Prod Res
, vol.33
, Issue.5
, pp. 1295-1312
-
-
Enns, S.T.1
-
23
-
-
0032041372
-
Job shop scheduling for missed due-date performance
-
PII S0360835297003173
-
T.C.E. Cheng, and J. Jiang Job shop scheduling for missed due-date performance Comp Ind Eng 34 2 1998 297 307 (Pubitemid 128458239)
-
(1998)
Computers and Industrial Engineering
, vol.34
, Issue.2-4
, pp. 297-307
-
-
Cheng, T.C.E.1
Jiang, J.2
-
24
-
-
18844442302
-
Using data mining for due date assignment in a dynamic job shop environment
-
DOI 10.1007/s00170-003-1937-y
-
D.Y. Sha, and C.H. Liu Using data mining for due-date assignment in a dynamic job shop environment Int J Adv Manuf Technol 25 11-12 2005 1164 1174 (Pubitemid 40683676)
-
(2005)
International Journal of Advanced Manufacturing Technology
, vol.25
, Issue.11-12
, pp. 1164-1174
-
-
Sha, D.Y.1
Liu, C.-H.2
-
25
-
-
33646526306
-
Manufacturing lead time estimation using data mining
-
Öztürk, S. Kayaligil, and N.E. Özdemirel Manufacturing lead time estimation using data mining Eur J Oper Res 173 2 2006 683 700
-
(2006)
Eur J Oper Res
, vol.173
, Issue.2
, pp. 683-700
-
-
Öztürk1
Kayaligil, S.2
Özdemirel, N.E.3
-
26
-
-
70449561624
-
Dynamic job shop scheduling for missed due-date performance
-
S. Alpay, and N. Yuzugullu Dynamic job shop scheduling for missed due-date performance Int J Prod Res 47 15 2009 4047 4062
-
(2009)
Int J Prod Res
, vol.47
, Issue.15
, pp. 4047-4062
-
-
Alpay, S.1
Yuzugullu, N.2
-
27
-
-
2942642529
-
Due-date assignment in wafer fabrication using artificial neural networks
-
D.Y. Sha, and S.Y. Hsu Due-date assignment in wafer fabrication using artificial neural networks Int J Adv Manuf Technol 23 9/10 2004 768 775
-
(2004)
Int J Adv Manuf Technol
, vol.23
, Issue.9-10
, pp. 768-775
-
-
Sha, D.Y.1
Hsu, S.Y.2
-
29
-
-
56349099276
-
Due-date performance improvement using TOC's aggregated time buffer method at a wafer fabrication factory
-
T.C. Kuo, S.H. Chang, and S.N. Huang Due-date performance improvement using TOC's aggregated time buffer method at a wafer fabrication factory Expert Syst Appl 36 2 2009 1783 1792
-
(2009)
Expert Syst Appl
, vol.36
, Issue.2
, pp. 1783-1792
-
-
Kuo, T.C.1
Chang, S.H.2
Huang, S.N.3
-
31
-
-
0033320202
-
Effects of scheduling rules and routing flexibility on the performance of a random flexible manufacturing system
-
DOI 10.1023/A:1008165212489
-
T. Mahmoodi, C.T. Mosier, and J.R. Morgan The effects of scheduling rules and routing flexibility on the performance of a random flexible manufacturing system Int J Flex Manuf Syst 11 1999 271 289 (Pubitemid 30503698)
-
(1999)
International Journal of Flexible Manufacturing Systems
, vol.11
, Issue.3
, pp. 271-289
-
-
Mahmoodi, F.1
Mosier, C.T.2
Morgan, J.R.3
-
32
-
-
0038481221
-
Analysis of dynamic dispatching rules for a flexible manufacturing system
-
F.T.S. Chan, H.K. Chan, H.C.W. Lau, and R.W.L. Ip Analysis of dynamic dispatching rules for a flexible manufacturing system J Mater Proc Technol 138 1-3 2003 325 331
-
(2003)
J Mater Proc Technol
, vol.138
, Issue.13
, pp. 325-331
-
-
Chan, F.T.S.1
Chan, H.K.2
Lau, H.C.W.3
Ip, R.W.L.4
-
33
-
-
33744831752
-
Machine number, priority rule, and due date determination in flexible manufacturing systems using artificial neural networks
-
DOI 10.1016/j.cie.2006.02.002, PII S0360835206000131
-
B. Yildirim, T. Cakar, U. Doguc, Ceciliano, and J.C. Meza Machine number, priority rule, and due-date determination in flexible manufacturing systems using artificial neural networks Comp Ind Eng 50 1 2006 185 194 (Pubitemid 43833336)
-
(2006)
Computers and Industrial Engineering
, vol.50
, Issue.1-2
, pp. 185-194
-
-
Yildirim, M.B.1
Cakar, T.2
Doguc, U.3
Meza, J.C.4
-
35
-
-
0025694085
-
Two new rules to minimize tardiness in a job shop
-
E.J. Anderson, and J.C. Nyirenda Two new rules to minimize tardiness in a job shop Int J Prod Res 28 12 1990 2277 2292
-
(1990)
Int J Prod Res
, vol.28
, Issue.12
, pp. 2277-2292
-
-
Anderson, E.J.1
Nyirenda, J.C.2
-
37
-
-
0002337285
-
A methodology for fitting and validating metamodels in simulation
-
J.P.C. Kleijnen, and R.G. Sargent A methodology for fitting and validating metamodels in simulation Eur J Oper Res 120 1 2000 14 29
-
(2000)
Eur J Oper Res
, vol.120
, Issue.1
, pp. 14-29
-
-
Kleijnen, J.P.C.1
Sargent, R.G.2
|