-
2
-
-
0021496929
-
Sequencing rules and due date assignments in a job shop
-
Baker K.R. Sequencing rules and due date assignments in a job shop. Management Science 30 (1984) 1093-1104
-
(1984)
Management Science
, vol.30
, pp. 1093-1104
-
-
Baker, K.R.1
-
3
-
-
33744823351
-
-
Cakar, T., Cil, I., & Kurt, A. 1998. Flexible manufacturing design and determination of priority rules by using artificial neural networks. Eighth international machine design and production conference-UMTIK98, September 9-11, Ankara, Turkey.
-
-
-
-
7
-
-
0022195068
-
-
Edghill, J. P., & Cresswell, C. 1986. FMS control strategy-a survey of the determining characteristics. Proceedings of fourth international conference on flexible manufacturing systems (pp. 305-315).
-
-
-
-
10
-
-
0024732435
-
FMS implementation procedure: A case study
-
Fry T.D., and Smith A.E. FMS implementation procedure: A case study. IIE Transactions 21 3 (1989) 228-239
-
(1989)
IIE Transactions
, vol.21
, Issue.3
, pp. 228-239
-
-
Fry, T.D.1
Smith, A.E.2
-
13
-
-
0032163501
-
Integration of inductive learning and neural networks for multi-objective FMS scheduling
-
Kim C.O., Min H.P., and Yih Y. Integration of inductive learning and neural networks for multi-objective FMS scheduling. International Journal of Production Research 36 9 (1998) 2497-2509
-
(1998)
International Journal of Production Research
, vol.36
, Issue.9
, pp. 2497-2509
-
-
Kim, C.O.1
Min, H.P.2
Yih, Y.3
-
16
-
-
0033320202
-
The effects of scheduling rules and routing flexibility on the performance of a random flexible manufacturing system
-
Mahmoodi F., Mosier C.T., and Morgan J.R. The effects of scheduling rules and routing flexibility on the performance of a random flexible manufacturing system. The International Journal of Flexible Manufacturing Systems 11 (1999) 271-289
-
(1999)
The International Journal of Flexible Manufacturing Systems
, vol.11
, pp. 271-289
-
-
Mahmoodi, F.1
Mosier, C.T.2
Morgan, J.R.3
-
17
-
-
0023345131
-
-
Mellichamp, J.M., & Wahab, A.F.A. (1987). An expert system for FMS design, Simulation (48), 201-208.
-
-
-
-
18
-
-
84990604706
-
Using neural networks to determine internally set due-date assignment for shop scheduling
-
Philipoom P.R., Rees L.P., and Wiegmann L. Using neural networks to determine internally set due-date assignment for shop scheduling. Decision Sciences 25 5/6 (1994) 825-851
-
(1994)
Decision Sciences
, vol.25
, Issue.5-6
, pp. 825-851
-
-
Philipoom, P.R.1
Rees, L.P.2
Wiegmann, L.3
-
19
-
-
0032000573
-
A beam search-based algorithm and evaluation of scheduling approaches for flexible manufacturing systems
-
Sabuncuoglu I., and Karabuk P. A beam search-based algorithm and evaluation of scheduling approaches for flexible manufacturing systems. IIE Transactions 30 (1998) 179-191
-
(1998)
IIE Transactions
, vol.30
, pp. 179-191
-
-
Sabuncuoglu, I.1
Karabuk, P.2
-
20
-
-
33744791854
-
-
SIMAN IV Reference Guide. (1990). Systems Modeling Corporation, Sewicldey, PA.
-
-
-
-
21
-
-
0032097746
-
Multi-level scheduling decisions in a class of FMS using simulation based metamodels
-
Sridharan R., and Babu A.P. Multi-level scheduling decisions in a class of FMS using simulation based metamodels. Journal of the Operational Research Society 49 (1998) 591-602
-
(1998)
Journal of the Operational Research Society
, vol.49
, pp. 591-602
-
-
Sridharan, R.1
Babu, A.P.2
-
22
-
-
34250111322
-
-
Stecke, K.E. (1985). Design, planning, scheduling and control problems of flexible manufacturing system, Annals of Operational Research, 3, 3-12.
-
-
-
-
23
-
-
0033204393
-
Multiple-objective scheduling for the hierarchical control of flexible manufacturing system
-
Tung L.F., Li L., and Rakesh N. Multiple-objective scheduling for the hierarchical control of flexible manufacturing system. International Journal of Flexible Manufacturing Systems 11 4 (1999) 379-409
-
(1999)
International Journal of Flexible Manufacturing Systems
, vol.11
, Issue.4
, pp. 379-409
-
-
Tung, L.F.1
Li, L.2
Rakesh, N.3
-
24
-
-
0010840762
-
Visual interactive simulation and artificial intelligence in design of flexible manufacturing systems
-
Vuyosevic R. Visual interactive simulation and artificial intelligence in design of flexible manufacturing systems. International Journal of Production Research 32 8 (1994) 1955-1971
-
(1994)
International Journal of Production Research
, vol.32
, Issue.8
, pp. 1955-1971
-
-
Vuyosevic, R.1
-
25
-
-
0035481812
-
GA-based discrete dynamic programming approach for scheduling in FMS environments
-
Yang J.B. GA-based discrete dynamic programming approach for scheduling in FMS environments. IEEE Transactions on Systems, Man, and Cybernetics 31 5 (2001) 824-835
-
(2001)
IEEE Transactions on Systems, Man, and Cybernetics
, vol.31
, Issue.5
, pp. 824-835
-
-
Yang, J.B.1
|