메뉴 건너뛰기




Volumn 50, Issue 1-2, 2006, Pages 185-194

Machine number, priority rule, and due date determination in flexible manufacturing systems using artificial neural networks

Author keywords

Artificial neural networks; Due date assignment; Flexible manufacturing system; Inverse scheduling; Priority rules

Indexed keywords

INDUSTRIAL MANAGEMENT; NEURAL NETWORKS; PARALLEL PROCESSING SYSTEMS; PERSONNEL;

EID: 33744831752     PISSN: 03608352     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.cie.2006.02.002     Document Type: Article
Times cited : (36)

References (25)
  • 2
    • 0021496929 scopus 로고
    • Sequencing rules and due date assignments in a job shop
    • Baker K.R. Sequencing rules and due date assignments in a job shop. Management Science 30 (1984) 1093-1104
    • (1984) Management Science , vol.30 , pp. 1093-1104
    • Baker, K.R.1
  • 3
    • 33744823351 scopus 로고    scopus 로고
    • Cakar, T., Cil, I., & Kurt, A. 1998. Flexible manufacturing design and determination of priority rules by using artificial neural networks. Eighth international machine design and production conference-UMTIK98, September 9-11, Ankara, Turkey.
  • 4
    • 23044501999 scopus 로고    scopus 로고
    • A neuro-genetic approach to design and planning of a manufacturing cell
    • Cakar T., Yildirim M.B., and Barut M. A neuro-genetic approach to design and planning of a manufacturing cell. Journal of Intelligent Manufacturing 16 (2005) 453-462
    • (2005) Journal of Intelligent Manufacturing , vol.16 , pp. 453-462
    • Cakar, T.1    Yildirim, M.B.2    Barut, M.3
  • 7
    • 0022195068 scopus 로고    scopus 로고
    • Edghill, J. P., & Cresswell, C. 1986. FMS control strategy-a survey of the determining characteristics. Proceedings of fourth international conference on flexible manufacturing systems (pp. 305-315).
  • 8
    • 0037405170 scopus 로고    scopus 로고
    • Using MLP networks to design a production scheduling system
    • Feng S., Li L., Cen L., and Huang J. Using MLP networks to design a production scheduling system. Computers and Operations Research 30 (2003) 821-832
    • (2003) Computers and Operations Research , vol.30 , pp. 821-832
    • Feng, S.1    Li, L.2    Cen, L.3    Huang, J.4
  • 10
    • 0024732435 scopus 로고
    • FMS implementation procedure: A case study
    • Fry T.D., and Smith A.E. FMS implementation procedure: A case study. IIE Transactions 21 3 (1989) 228-239
    • (1989) IIE Transactions , vol.21 , Issue.3 , pp. 228-239
    • Fry, T.D.1    Smith, A.E.2
  • 13
    • 0032163501 scopus 로고    scopus 로고
    • Integration of inductive learning and neural networks for multi-objective FMS scheduling
    • Kim C.O., Min H.P., and Yih Y. Integration of inductive learning and neural networks for multi-objective FMS scheduling. International Journal of Production Research 36 9 (1998) 2497-2509
    • (1998) International Journal of Production Research , vol.36 , Issue.9 , pp. 2497-2509
    • Kim, C.O.1    Min, H.P.2    Yih, Y.3
  • 15
    • 5144232432 scopus 로고    scopus 로고
    • Solving multi-objective production scheduling problems using metaheuristics
    • Loukil T., Teghem J., and Tuyttens D. Solving multi-objective production scheduling problems using metaheuristics. European Journal of Operational Research 161 (2005) 42-61
    • (2005) European Journal of Operational Research , vol.161 , pp. 42-61
    • Loukil, T.1    Teghem, J.2    Tuyttens, D.3
  • 16
    • 0033320202 scopus 로고    scopus 로고
    • The effects of scheduling rules and routing flexibility on the performance of a random flexible manufacturing system
    • Mahmoodi F., Mosier C.T., and Morgan J.R. The effects of scheduling rules and routing flexibility on the performance of a random flexible manufacturing system. The International Journal of Flexible Manufacturing Systems 11 (1999) 271-289
    • (1999) The International Journal of Flexible Manufacturing Systems , vol.11 , pp. 271-289
    • Mahmoodi, F.1    Mosier, C.T.2    Morgan, J.R.3
  • 17
    • 0023345131 scopus 로고    scopus 로고
    • Mellichamp, J.M., & Wahab, A.F.A. (1987). An expert system for FMS design, Simulation (48), 201-208.
  • 18
    • 84990604706 scopus 로고
    • Using neural networks to determine internally set due-date assignment for shop scheduling
    • Philipoom P.R., Rees L.P., and Wiegmann L. Using neural networks to determine internally set due-date assignment for shop scheduling. Decision Sciences 25 5/6 (1994) 825-851
    • (1994) Decision Sciences , vol.25 , Issue.5-6 , pp. 825-851
    • Philipoom, P.R.1    Rees, L.P.2    Wiegmann, L.3
  • 19
    • 0032000573 scopus 로고    scopus 로고
    • A beam search-based algorithm and evaluation of scheduling approaches for flexible manufacturing systems
    • Sabuncuoglu I., and Karabuk P. A beam search-based algorithm and evaluation of scheduling approaches for flexible manufacturing systems. IIE Transactions 30 (1998) 179-191
    • (1998) IIE Transactions , vol.30 , pp. 179-191
    • Sabuncuoglu, I.1    Karabuk, P.2
  • 20
    • 33744791854 scopus 로고    scopus 로고
    • SIMAN IV Reference Guide. (1990). Systems Modeling Corporation, Sewicldey, PA.
  • 21
    • 0032097746 scopus 로고    scopus 로고
    • Multi-level scheduling decisions in a class of FMS using simulation based metamodels
    • Sridharan R., and Babu A.P. Multi-level scheduling decisions in a class of FMS using simulation based metamodels. Journal of the Operational Research Society 49 (1998) 591-602
    • (1998) Journal of the Operational Research Society , vol.49 , pp. 591-602
    • Sridharan, R.1    Babu, A.P.2
  • 22
    • 34250111322 scopus 로고    scopus 로고
    • Stecke, K.E. (1985). Design, planning, scheduling and control problems of flexible manufacturing system, Annals of Operational Research, 3, 3-12.
  • 23
    • 0033204393 scopus 로고    scopus 로고
    • Multiple-objective scheduling for the hierarchical control of flexible manufacturing system
    • Tung L.F., Li L., and Rakesh N. Multiple-objective scheduling for the hierarchical control of flexible manufacturing system. International Journal of Flexible Manufacturing Systems 11 4 (1999) 379-409
    • (1999) International Journal of Flexible Manufacturing Systems , vol.11 , Issue.4 , pp. 379-409
    • Tung, L.F.1    Li, L.2    Rakesh, N.3
  • 24
    • 0010840762 scopus 로고
    • Visual interactive simulation and artificial intelligence in design of flexible manufacturing systems
    • Vuyosevic R. Visual interactive simulation and artificial intelligence in design of flexible manufacturing systems. International Journal of Production Research 32 8 (1994) 1955-1971
    • (1994) International Journal of Production Research , vol.32 , Issue.8 , pp. 1955-1971
    • Vuyosevic, R.1
  • 25
    • 0035481812 scopus 로고    scopus 로고
    • GA-based discrete dynamic programming approach for scheduling in FMS environments
    • Yang J.B. GA-based discrete dynamic programming approach for scheduling in FMS environments. IEEE Transactions on Systems, Man, and Cybernetics 31 5 (2001) 824-835
    • (2001) IEEE Transactions on Systems, Man, and Cybernetics , vol.31 , Issue.5 , pp. 824-835
    • Yang, J.B.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.