-
1
-
-
0030084395
-
Object-oriented resource models: Their role in specifying components of integrated manufacturing systems
-
Aguiar M., Murgatroyd I., and Edwards J. Object-oriented resource models: Their role in specifying components of integrated manufacturing systems. Comput Integrated Mfg Systems 9 1 (1996) 33-48
-
(1996)
Comput Integrated Mfg Systems
, vol.9
, Issue.1
, pp. 33-48
-
-
Aguiar, M.1
Murgatroyd, I.2
Edwards, J.3
-
2
-
-
17744382010
-
-
Altuntas B, Wysk RA. A framework for adaptive synchronization of distributed simulation. In: Proc. of 2004 winter simulation conf. 2004. p. 371-7
-
Altuntas B, Wysk RA. A framework for adaptive synchronization of distributed simulation. In: Proc. of 2004 winter simulation conf. 2004. p. 371-7
-
-
-
-
3
-
-
0034427761
-
-
Barnett MW, Miller CJ. Analysis of the virtual enterprise using distributed supply chain modeling and simulation: An application of e-SCOR. In: Proc. of 2000 winter simulation conf. 2000. p. 352-5
-
Barnett MW, Miller CJ. Analysis of the virtual enterprise using distributed supply chain modeling and simulation: An application of e-SCOR. In: Proc. of 2000 winter simulation conf. 2000. p. 352-5
-
-
-
-
4
-
-
0034288107
-
Conceptual modeling of an object-oriented scheduling architecture based on the shifting bottleneck procedure
-
Brandimarte P., Rigodanza M., and Roero L. Conceptual modeling of an object-oriented scheduling architecture based on the shifting bottleneck procedure. IIE Trans 32 10 (2000) 921-929
-
(2000)
IIE Trans
, vol.32
, Issue.10
, pp. 921-929
-
-
Brandimarte, P.1
Rigodanza, M.2
Roero, L.3
-
5
-
-
33646930986
-
Design and conceptual development of shop floor controllers through the manipulation of process plans
-
Cho H., Son Y., and Jones A. Design and conceptual development of shop floor controllers through the manipulation of process plans. Int J Comput Integrated Mfg 19 4 (2006) 359-376
-
(2006)
Int J Comput Integrated Mfg
, vol.19
, Issue.4
, pp. 359-376
-
-
Cho, H.1
Son, Y.2
Jones, A.3
-
6
-
-
0027576654
-
A robust adaptive scheduler for an intelligent workstation controller
-
Cho H., and Wysk R.A. A robust adaptive scheduler for an intelligent workstation controller. Int J Production Res 31 4 (1993) 771-790
-
(1993)
Int J Production Res
, vol.31
, Issue.4
, pp. 771-790
-
-
Cho, H.1
Wysk, R.A.2
-
7
-
-
0002622363
-
Intelligent workstation controller for computer-integrated manufacturing: Problems and models
-
Cho H., and Wysk R.A. Intelligent workstation controller for computer-integrated manufacturing: Problems and models. J Manufacturing Systems 14 4 (1995) 252-263
-
(1995)
J Manufacturing Systems
, vol.14
, Issue.4
, pp. 252-263
-
-
Cho, H.1
Wysk, R.A.2
-
8
-
-
0040165204
-
A real-time production scheduler for a stochastic manufacturing environment
-
Davis W.J., and Jones A.T. A real-time production scheduler for a stochastic manufacturing environment. Int J Comput Integrated Mfg 4 4 (1988) 531-544
-
(1988)
Int J Comput Integrated Mfg
, vol.4
, Issue.4
, pp. 531-544
-
-
Davis, W.J.1
Jones, A.T.2
-
9
-
-
0029543165
-
-
Drake GR, Smith JS, Peters BA. Simulation as a planning and scheduling tool for flexible manufacturing systems. In: Proc. of 1995 winter simulation conf. 1995. p. 805-12
-
Drake GR, Smith JS, Peters BA. Simulation as a planning and scheduling tool for flexible manufacturing systems. In: Proc. of 1995 winter simulation conf. 1995. p. 805-12
-
-
-
-
10
-
-
0030395612
-
-
Drake GR, Smith J. Simulation systems for real time planning scheduling and control. In: Proc. of 1996 winter simulation conf. 1996
-
Drake GR, Smith J. Simulation systems for real time planning scheduling and control. In: Proc. of 1996 winter simulation conf. 1996
-
-
-
-
11
-
-
18744415032
-
A distributed virtual factory in agile manufacturing environment
-
Fujii S., Kaihara T., and Morita H. A distributed virtual factory in agile manufacturing environment. Int J Production Res 38 17 (2000) 4113-4128
-
(2000)
Int J Production Res
, vol.38
, Issue.17
, pp. 4113-4128
-
-
Fujii, S.1
Kaihara, T.2
Morita, H.3
-
13
-
-
0003620778
-
-
Addison-Wesley Publishing Co, Reading, MA
-
Hopcroft J.E., and Ullman J.D. Introduction to automata theory, languages, and computation (1979), Addison-Wesley Publishing Co, Reading, MA
-
(1979)
Introduction to automata theory, languages, and computation
-
-
Hopcroft, J.E.1
Ullman, J.D.2
-
14
-
-
0000136405
-
A hybrid approach for real-time sequencing and scheduling
-
Jones A.T., Rabelo L., and Yih Y. A hybrid approach for real-time sequencing and scheduling. Int J Comput Integrated Mfg 8 2 (1995) 145-154
-
(1995)
Int J Comput Integrated Mfg
, vol.8
, Issue.2
, pp. 145-154
-
-
Jones, A.T.1
Rabelo, L.2
Yih, Y.3
-
15
-
-
0028594405
-
Simulation-based real-time scheduling mechanism in a flexible manufacturing system
-
Kim M.H., and Kim Y.D. Simulation-based real-time scheduling mechanism in a flexible manufacturing system. J Manufacturing Systems 13 2 (1994) 85-93
-
(1994)
J Manufacturing Systems
, vol.13
, Issue.2
, pp. 85-93
-
-
Kim, M.H.1
Kim, Y.D.2
-
16
-
-
0003520342
-
-
Prentice-Hall, Upper Saddle River, NJ
-
Kuhl F., Weatherly R., and Dahmann J. Creating computer simulations: An introduction to the high level architecture (1999), Prentice-Hall, Upper Saddle River, NJ
-
(1999)
Creating computer simulations: An introduction to the high level architecture
-
-
Kuhl, F.1
Weatherly, R.2
Dahmann, J.3
-
17
-
-
33745017395
-
An evaluation of process-oriented supply chain management frameworks
-
Lambert D.M., Garcia-Dastugue S.J., and Croxton K.L. An evaluation of process-oriented supply chain management frameworks. J Business Logistics 26 1 (2005) 25-51
-
(2005)
J Business Logistics
, vol.26
, Issue.1
, pp. 25-51
-
-
Lambert, D.M.1
Garcia-Dastugue, S.J.2
Croxton, K.L.3
-
18
-
-
43149092239
-
Fully dynamic epoch (FDE) time synchronization method for distributed supply chain simulation
-
Lee S., Zhao A., X. K., Shendarkar Y., Vasudevan, and Son. Fully dynamic epoch (FDE) time synchronization method for distributed supply chain simulation. Int J Comput Appl Technol 31 3-4 (2008) 249-262
-
(2008)
Int J Comput Appl Technol
, vol.31
, Issue.3-4
, pp. 249-262
-
-
Lee, S.1
Zhao, A.2
X., K.3
Shendarkar, Y.4
Vasudevan5
Son6
-
19
-
-
17744393287
-
-
Lee S. Wysk RA. Resource reconciliation mechanism for a manufacturing federation coordinated using an MRP/ERP system. In: Proc. of 2004 winter simulation conf. 2004. p. 1085-93
-
Lee S. Wysk RA. Resource reconciliation mechanism for a manufacturing federation coordinated using an MRP/ERP system. In: Proc. of 2004 winter simulation conf. 2004. p. 1085-93
-
-
-
-
20
-
-
0031117128
-
Comparing JIT, MRP, and TOC and embedding TOC into MRP
-
Miltenburg J. Comparing JIT, MRP, and TOC and embedding TOC into MRP. Int J Production Res 35 4 (1997) 1147-1169
-
(1997)
Int J Production Res
, vol.35
, Issue.4
, pp. 1147-1169
-
-
Miltenburg, J.1
-
21
-
-
0036923582
-
-
McLean C, Jones A, Lee T, Riddick F. An architecture for a generic data-driven machine shop simulator. In: Proc. of 2004 winter simulation conf. 2002. p. 1108-16
-
McLean C, Jones A, Lee T, Riddick F. An architecture for a generic data-driven machine shop simulator. In: Proc. of 2004 winter simulation conf. 2002. p. 1108-16
-
-
-
-
22
-
-
0001377662
-
Part input into a flexible flow system: An evaluation of look-ahead simulation and a fuzzy rule base
-
O'Keefe R.M., and Rao R. Part input into a flexible flow system: An evaluation of look-ahead simulation and a fuzzy rule base. Int J Flexible Mfg Systems 4 2 (1992) 113-127
-
(1992)
Int J Flexible Mfg Systems
, vol.4
, Issue.2
, pp. 113-127
-
-
O'Keefe, R.M.1
Rao, R.2
-
23
-
-
33745745752
-
Development and benchmarking of an epoch time synchronization method for distributed simulation
-
Rathore A., Balaraman B., Zhao X., Venkateswaran J., Son Y., and Wysk R. Development and benchmarking of an epoch time synchronization method for distributed simulation. J Manufacturing Systems 24 2 (2005) 69-78
-
(2005)
J Manufacturing Systems
, vol.24
, Issue.2
, pp. 69-78
-
-
Rathore, A.1
Balaraman, B.2
Zhao, X.3
Venkateswaran, J.4
Son, Y.5
Wysk, R.6
-
25
-
-
27144456170
-
A methodology for modeling inter-company supply chains and for evaluating a method of integrated product and process documentation
-
Röder A., and Tibken B. A methodology for modeling inter-company supply chains and for evaluating a method of integrated product and process documentation. European J Oper Res 169 3 (2006) 1010-1029
-
(2006)
European J Oper Res
, vol.169
, Issue.3
, pp. 1010-1029
-
-
Röder, A.1
Tibken, B.2
-
26
-
-
0037083626
-
A reference system for internet based inter-enterprise electronic commerce
-
Shin K., and Leem C. A reference system for internet based inter-enterprise electronic commerce. J Systems Software 60 3 (2002) 195-209
-
(2002)
J Systems Software
, vol.60
, Issue.3
, pp. 195-209
-
-
Shin, K.1
Leem, C.2
-
27
-
-
0027814193
-
-
Smith J, Joshi S. A formal model for shop floor control in automated manufacturing. In: Proc. of 2nd industrial engg. research conf. 1993
-
Smith J, Joshi S. A formal model for shop floor control in automated manufacturing. In: Proc. of 2nd industrial engg. research conf. 1993
-
-
-
-
28
-
-
0028753156
-
-
Smith JS, Wysk RA, Sturrok DT, Ramaswamy SE, Smith GD, Joshi SB. Discrete event simulation for shop floor control. In: Proc. of 1994 winter simulation conf. 1994. p. 962-9
-
Smith JS, Wysk RA, Sturrok DT, Ramaswamy SE, Smith GD, Joshi SB. Discrete event simulation for shop floor control. In: Proc. of 1994 winter simulation conf. 1994. p. 962-9
-
-
-
-
29
-
-
0042370532
-
Simulation based shop floor control
-
Son Y., Joshi S., Wysk R., and Smith J. Simulation based shop floor control. J Manufacturing Systems 21 5 (2002) 380-394
-
(2002)
J Manufacturing Systems
, vol.21
, Issue.5
, pp. 380-394
-
-
Son, Y.1
Joshi, S.2
Wysk, R.3
Smith, J.4
-
30
-
-
0001225037
-
A multi-pass simulation-based, real-time scheduling and shop floor control system
-
Son Y., Rodriguez-Rivera H., and Wysk R.A. A multi-pass simulation-based, real-time scheduling and shop floor control system. Trans Society Comput Simul Internat 16 4 (1999) 159-172
-
(1999)
Trans Society Comput Simul Internat
, vol.16
, Issue.4
, pp. 159-172
-
-
Son, Y.1
Rodriguez-Rivera, H.2
Wysk, R.A.3
-
31
-
-
0035396337
-
Automatic simulation model generation for simulation-based, real-time shop floor control
-
Son Y., and Wysk R.A. Automatic simulation model generation for simulation-based, real-time shop floor control. Comput Industry 45 3 (2001) 291-308
-
(2001)
Comput Industry
, vol.45
, Issue.3
, pp. 291-308
-
-
Son, Y.1
Wysk, R.A.2
-
32
-
-
0037236081
-
Simulation based shop floor control: Formal model, model generation, and control interface
-
Son Y., Wysk R.A., and Jones A.T. Simulation based shop floor control: Formal model, model generation, and control interface. IIE Trans 35 1 (2003) 29-48
-
(2003)
IIE Trans
, vol.35
, Issue.1
, pp. 29-48
-
-
Son, Y.1
Wysk, R.A.2
Jones, A.T.3
-
33
-
-
0039896159
-
Resource modeling for the integration of the manufacturing enterprise
-
Steele J., Son Y., and Wysk R.A. Resource modeling for the integration of the manufacturing enterprise. J Manufacturing Systems 19 6 (2001) 407-427
-
(2001)
J Manufacturing Systems
, vol.19
, Issue.6
, pp. 407-427
-
-
Steele, J.1
Son, Y.2
Wysk, R.A.3
-
34
-
-
48049105447
-
-
Supply Chain Council. Supply-chain operations reference model: An overview of SCOR version 8.0. Available online at www.supply-chain.org; 2004 [accessed Sept. 2004]
-
Supply Chain Council. Supply-chain operations reference model: An overview of SCOR version 8.0. Available online at www.supply-chain.org; 2004 [accessed Sept. 2004]
-
-
-
-
35
-
-
0036722537
-
Satisfying due-dates in large multi factory supply chains
-
Thoney K.A., Hodgson T.J., King R.E., Taner M.R., and Wilson A.D. Satisfying due-dates in large multi factory supply chains. IIE Trans 34 9 (2002) 803-811
-
(2002)
IIE Trans
, vol.34
, Issue.9
, pp. 803-811
-
-
Thoney, K.A.1
Hodgson, T.J.2
King, R.E.3
Taner, M.R.4
Wilson, A.D.5
-
36
-
-
3142733812
-
Design and development of a prototype distributed simulation for evaluation of supply chains
-
Venkateswaran J., and Son Y. Design and development of a prototype distributed simulation for evaluation of supply chains. Int J Industrial Engg 11 2 (2004) 151-160
-
(2004)
Int J Industrial Engg
, vol.11
, Issue.2
, pp. 151-160
-
-
Venkateswaran, J.1
Son, Y.2
-
37
-
-
0023868237
-
Multi-pass expert control system - a control/scheduling structure for flexible manufacturing cells
-
Wu D., and Wysk R.A. Multi-pass expert control system - a control/scheduling structure for flexible manufacturing cells. J Manufacturing Systems 7 2 (1988) 107-120
-
(1988)
J Manufacturing Systems
, vol.7
, Issue.2
, pp. 107-120
-
-
Wu, D.1
Wysk, R.A.2
-
38
-
-
0003150423
-
A formal process planning schema for shop floor control
-
Wysk R.A., Peters B.A., and Smith J.S. A formal process planning schema for shop floor control. Engg Design Automation J 1 1 (1994) 3-19
-
(1994)
Engg Design Automation J
, vol.1
, Issue.1
, pp. 3-19
-
-
Wysk, R.A.1
Peters, B.A.2
Smith, J.S.3
-
39
-
-
0022097890
-
Scheduling/rescheduling in the manufacturing operating system environment
-
Yamamoto M., and Nof S.Y. Scheduling/rescheduling in the manufacturing operating system environment. Int J Production Res 23 4 (1985) 705-722
-
(1985)
Int J Production Res
, vol.23
, Issue.4
, pp. 705-722
-
-
Yamamoto, M.1
Nof, S.Y.2
|