메뉴 건너뛰기




Volumn 26, Issue 2, 2007, Pages 85-98

Simulation-based planning and control: From shop floor to top floor

Author keywords

[No Author keywords available]

Indexed keywords

CHANNEL CAPACITY; FLOORS; INFORMATION SERVICES; MODELS;

EID: 48049100176     PISSN: 02786125     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.jmsy.2007.07.001     Document Type: Article
Times cited : (24)

References (39)
  • 1
    • 0030084395 scopus 로고    scopus 로고
    • Object-oriented resource models: Their role in specifying components of integrated manufacturing systems
    • Aguiar M., Murgatroyd I., and Edwards J. Object-oriented resource models: Their role in specifying components of integrated manufacturing systems. Comput Integrated Mfg Systems 9 1 (1996) 33-48
    • (1996) Comput Integrated Mfg Systems , vol.9 , Issue.1 , pp. 33-48
    • Aguiar, M.1    Murgatroyd, I.2    Edwards, J.3
  • 2
    • 17744382010 scopus 로고    scopus 로고
    • Altuntas B, Wysk RA. A framework for adaptive synchronization of distributed simulation. In: Proc. of 2004 winter simulation conf. 2004. p. 371-7
    • Altuntas B, Wysk RA. A framework for adaptive synchronization of distributed simulation. In: Proc. of 2004 winter simulation conf. 2004. p. 371-7
  • 3
    • 0034427761 scopus 로고    scopus 로고
    • Barnett MW, Miller CJ. Analysis of the virtual enterprise using distributed supply chain modeling and simulation: An application of e-SCOR. In: Proc. of 2000 winter simulation conf. 2000. p. 352-5
    • Barnett MW, Miller CJ. Analysis of the virtual enterprise using distributed supply chain modeling and simulation: An application of e-SCOR. In: Proc. of 2000 winter simulation conf. 2000. p. 352-5
  • 4
    • 0034288107 scopus 로고    scopus 로고
    • Conceptual modeling of an object-oriented scheduling architecture based on the shifting bottleneck procedure
    • Brandimarte P., Rigodanza M., and Roero L. Conceptual modeling of an object-oriented scheduling architecture based on the shifting bottleneck procedure. IIE Trans 32 10 (2000) 921-929
    • (2000) IIE Trans , vol.32 , Issue.10 , pp. 921-929
    • Brandimarte, P.1    Rigodanza, M.2    Roero, L.3
  • 5
    • 33646930986 scopus 로고    scopus 로고
    • Design and conceptual development of shop floor controllers through the manipulation of process plans
    • Cho H., Son Y., and Jones A. Design and conceptual development of shop floor controllers through the manipulation of process plans. Int J Comput Integrated Mfg 19 4 (2006) 359-376
    • (2006) Int J Comput Integrated Mfg , vol.19 , Issue.4 , pp. 359-376
    • Cho, H.1    Son, Y.2    Jones, A.3
  • 6
    • 0027576654 scopus 로고
    • A robust adaptive scheduler for an intelligent workstation controller
    • Cho H., and Wysk R.A. A robust adaptive scheduler for an intelligent workstation controller. Int J Production Res 31 4 (1993) 771-790
    • (1993) Int J Production Res , vol.31 , Issue.4 , pp. 771-790
    • Cho, H.1    Wysk, R.A.2
  • 7
    • 0002622363 scopus 로고
    • Intelligent workstation controller for computer-integrated manufacturing: Problems and models
    • Cho H., and Wysk R.A. Intelligent workstation controller for computer-integrated manufacturing: Problems and models. J Manufacturing Systems 14 4 (1995) 252-263
    • (1995) J Manufacturing Systems , vol.14 , Issue.4 , pp. 252-263
    • Cho, H.1    Wysk, R.A.2
  • 8
    • 0040165204 scopus 로고
    • A real-time production scheduler for a stochastic manufacturing environment
    • Davis W.J., and Jones A.T. A real-time production scheduler for a stochastic manufacturing environment. Int J Comput Integrated Mfg 4 4 (1988) 531-544
    • (1988) Int J Comput Integrated Mfg , vol.4 , Issue.4 , pp. 531-544
    • Davis, W.J.1    Jones, A.T.2
  • 9
    • 0029543165 scopus 로고    scopus 로고
    • Drake GR, Smith JS, Peters BA. Simulation as a planning and scheduling tool for flexible manufacturing systems. In: Proc. of 1995 winter simulation conf. 1995. p. 805-12
    • Drake GR, Smith JS, Peters BA. Simulation as a planning and scheduling tool for flexible manufacturing systems. In: Proc. of 1995 winter simulation conf. 1995. p. 805-12
  • 10
    • 0030395612 scopus 로고    scopus 로고
    • Drake GR, Smith J. Simulation systems for real time planning scheduling and control. In: Proc. of 1996 winter simulation conf. 1996
    • Drake GR, Smith J. Simulation systems for real time planning scheduling and control. In: Proc. of 1996 winter simulation conf. 1996
  • 11
    • 18744415032 scopus 로고    scopus 로고
    • A distributed virtual factory in agile manufacturing environment
    • Fujii S., Kaihara T., and Morita H. A distributed virtual factory in agile manufacturing environment. Int J Production Res 38 17 (2000) 4113-4128
    • (2000) Int J Production Res , vol.38 , Issue.17 , pp. 4113-4128
    • Fujii, S.1    Kaihara, T.2    Morita, H.3
  • 14
    • 0000136405 scopus 로고
    • A hybrid approach for real-time sequencing and scheduling
    • Jones A.T., Rabelo L., and Yih Y. A hybrid approach for real-time sequencing and scheduling. Int J Comput Integrated Mfg 8 2 (1995) 145-154
    • (1995) Int J Comput Integrated Mfg , vol.8 , Issue.2 , pp. 145-154
    • Jones, A.T.1    Rabelo, L.2    Yih, Y.3
  • 15
    • 0028594405 scopus 로고
    • Simulation-based real-time scheduling mechanism in a flexible manufacturing system
    • Kim M.H., and Kim Y.D. Simulation-based real-time scheduling mechanism in a flexible manufacturing system. J Manufacturing Systems 13 2 (1994) 85-93
    • (1994) J Manufacturing Systems , vol.13 , Issue.2 , pp. 85-93
    • Kim, M.H.1    Kim, Y.D.2
  • 17
    • 33745017395 scopus 로고    scopus 로고
    • An evaluation of process-oriented supply chain management frameworks
    • Lambert D.M., Garcia-Dastugue S.J., and Croxton K.L. An evaluation of process-oriented supply chain management frameworks. J Business Logistics 26 1 (2005) 25-51
    • (2005) J Business Logistics , vol.26 , Issue.1 , pp. 25-51
    • Lambert, D.M.1    Garcia-Dastugue, S.J.2    Croxton, K.L.3
  • 18
    • 43149092239 scopus 로고    scopus 로고
    • Fully dynamic epoch (FDE) time synchronization method for distributed supply chain simulation
    • Lee S., Zhao A., X. K., Shendarkar Y., Vasudevan, and Son. Fully dynamic epoch (FDE) time synchronization method for distributed supply chain simulation. Int J Comput Appl Technol 31 3-4 (2008) 249-262
    • (2008) Int J Comput Appl Technol , vol.31 , Issue.3-4 , pp. 249-262
    • Lee, S.1    Zhao, A.2    X., K.3    Shendarkar, Y.4    Vasudevan5    Son6
  • 19
    • 17744393287 scopus 로고    scopus 로고
    • Lee S. Wysk RA. Resource reconciliation mechanism for a manufacturing federation coordinated using an MRP/ERP system. In: Proc. of 2004 winter simulation conf. 2004. p. 1085-93
    • Lee S. Wysk RA. Resource reconciliation mechanism for a manufacturing federation coordinated using an MRP/ERP system. In: Proc. of 2004 winter simulation conf. 2004. p. 1085-93
  • 20
    • 0031117128 scopus 로고    scopus 로고
    • Comparing JIT, MRP, and TOC and embedding TOC into MRP
    • Miltenburg J. Comparing JIT, MRP, and TOC and embedding TOC into MRP. Int J Production Res 35 4 (1997) 1147-1169
    • (1997) Int J Production Res , vol.35 , Issue.4 , pp. 1147-1169
    • Miltenburg, J.1
  • 21
    • 0036923582 scopus 로고    scopus 로고
    • McLean C, Jones A, Lee T, Riddick F. An architecture for a generic data-driven machine shop simulator. In: Proc. of 2004 winter simulation conf. 2002. p. 1108-16
    • McLean C, Jones A, Lee T, Riddick F. An architecture for a generic data-driven machine shop simulator. In: Proc. of 2004 winter simulation conf. 2002. p. 1108-16
  • 22
    • 0001377662 scopus 로고
    • Part input into a flexible flow system: An evaluation of look-ahead simulation and a fuzzy rule base
    • O'Keefe R.M., and Rao R. Part input into a flexible flow system: An evaluation of look-ahead simulation and a fuzzy rule base. Int J Flexible Mfg Systems 4 2 (1992) 113-127
    • (1992) Int J Flexible Mfg Systems , vol.4 , Issue.2 , pp. 113-127
    • O'Keefe, R.M.1    Rao, R.2
  • 23
    • 33745745752 scopus 로고    scopus 로고
    • Development and benchmarking of an epoch time synchronization method for distributed simulation
    • Rathore A., Balaraman B., Zhao X., Venkateswaran J., Son Y., and Wysk R. Development and benchmarking of an epoch time synchronization method for distributed simulation. J Manufacturing Systems 24 2 (2005) 69-78
    • (2005) J Manufacturing Systems , vol.24 , Issue.2 , pp. 69-78
    • Rathore, A.1    Balaraman, B.2    Zhao, X.3    Venkateswaran, J.4    Son, Y.5    Wysk, R.6
  • 25
    • 27144456170 scopus 로고    scopus 로고
    • A methodology for modeling inter-company supply chains and for evaluating a method of integrated product and process documentation
    • Röder A., and Tibken B. A methodology for modeling inter-company supply chains and for evaluating a method of integrated product and process documentation. European J Oper Res 169 3 (2006) 1010-1029
    • (2006) European J Oper Res , vol.169 , Issue.3 , pp. 1010-1029
    • Röder, A.1    Tibken, B.2
  • 26
    • 0037083626 scopus 로고    scopus 로고
    • A reference system for internet based inter-enterprise electronic commerce
    • Shin K., and Leem C. A reference system for internet based inter-enterprise electronic commerce. J Systems Software 60 3 (2002) 195-209
    • (2002) J Systems Software , vol.60 , Issue.3 , pp. 195-209
    • Shin, K.1    Leem, C.2
  • 27
    • 0027814193 scopus 로고    scopus 로고
    • Smith J, Joshi S. A formal model for shop floor control in automated manufacturing. In: Proc. of 2nd industrial engg. research conf. 1993
    • Smith J, Joshi S. A formal model for shop floor control in automated manufacturing. In: Proc. of 2nd industrial engg. research conf. 1993
  • 28
    • 0028753156 scopus 로고    scopus 로고
    • Smith JS, Wysk RA, Sturrok DT, Ramaswamy SE, Smith GD, Joshi SB. Discrete event simulation for shop floor control. In: Proc. of 1994 winter simulation conf. 1994. p. 962-9
    • Smith JS, Wysk RA, Sturrok DT, Ramaswamy SE, Smith GD, Joshi SB. Discrete event simulation for shop floor control. In: Proc. of 1994 winter simulation conf. 1994. p. 962-9
  • 30
    • 0001225037 scopus 로고    scopus 로고
    • A multi-pass simulation-based, real-time scheduling and shop floor control system
    • Son Y., Rodriguez-Rivera H., and Wysk R.A. A multi-pass simulation-based, real-time scheduling and shop floor control system. Trans Society Comput Simul Internat 16 4 (1999) 159-172
    • (1999) Trans Society Comput Simul Internat , vol.16 , Issue.4 , pp. 159-172
    • Son, Y.1    Rodriguez-Rivera, H.2    Wysk, R.A.3
  • 31
    • 0035396337 scopus 로고    scopus 로고
    • Automatic simulation model generation for simulation-based, real-time shop floor control
    • Son Y., and Wysk R.A. Automatic simulation model generation for simulation-based, real-time shop floor control. Comput Industry 45 3 (2001) 291-308
    • (2001) Comput Industry , vol.45 , Issue.3 , pp. 291-308
    • Son, Y.1    Wysk, R.A.2
  • 32
    • 0037236081 scopus 로고    scopus 로고
    • Simulation based shop floor control: Formal model, model generation, and control interface
    • Son Y., Wysk R.A., and Jones A.T. Simulation based shop floor control: Formal model, model generation, and control interface. IIE Trans 35 1 (2003) 29-48
    • (2003) IIE Trans , vol.35 , Issue.1 , pp. 29-48
    • Son, Y.1    Wysk, R.A.2    Jones, A.T.3
  • 33
    • 0039896159 scopus 로고    scopus 로고
    • Resource modeling for the integration of the manufacturing enterprise
    • Steele J., Son Y., and Wysk R.A. Resource modeling for the integration of the manufacturing enterprise. J Manufacturing Systems 19 6 (2001) 407-427
    • (2001) J Manufacturing Systems , vol.19 , Issue.6 , pp. 407-427
    • Steele, J.1    Son, Y.2    Wysk, R.A.3
  • 34
    • 48049105447 scopus 로고    scopus 로고
    • Supply Chain Council. Supply-chain operations reference model: An overview of SCOR version 8.0. Available online at www.supply-chain.org; 2004 [accessed Sept. 2004]
    • Supply Chain Council. Supply-chain operations reference model: An overview of SCOR version 8.0. Available online at www.supply-chain.org; 2004 [accessed Sept. 2004]
  • 35
  • 36
    • 3142733812 scopus 로고    scopus 로고
    • Design and development of a prototype distributed simulation for evaluation of supply chains
    • Venkateswaran J., and Son Y. Design and development of a prototype distributed simulation for evaluation of supply chains. Int J Industrial Engg 11 2 (2004) 151-160
    • (2004) Int J Industrial Engg , vol.11 , Issue.2 , pp. 151-160
    • Venkateswaran, J.1    Son, Y.2
  • 37
    • 0023868237 scopus 로고
    • Multi-pass expert control system - a control/scheduling structure for flexible manufacturing cells
    • Wu D., and Wysk R.A. Multi-pass expert control system - a control/scheduling structure for flexible manufacturing cells. J Manufacturing Systems 7 2 (1988) 107-120
    • (1988) J Manufacturing Systems , vol.7 , Issue.2 , pp. 107-120
    • Wu, D.1    Wysk, R.A.2
  • 38
    • 0003150423 scopus 로고
    • A formal process planning schema for shop floor control
    • Wysk R.A., Peters B.A., and Smith J.S. A formal process planning schema for shop floor control. Engg Design Automation J 1 1 (1994) 3-19
    • (1994) Engg Design Automation J , vol.1 , Issue.1 , pp. 3-19
    • Wysk, R.A.1    Peters, B.A.2    Smith, J.S.3
  • 39
    • 0022097890 scopus 로고
    • Scheduling/rescheduling in the manufacturing operating system environment
    • Yamamoto M., and Nof S.Y. Scheduling/rescheduling in the manufacturing operating system environment. Int J Production Res 23 4 (1985) 705-722
    • (1985) Int J Production Res , vol.23 , Issue.4 , pp. 705-722
    • Yamamoto, M.1    Nof, S.Y.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.