-
1
-
-
0027621699
-
-
Agrawal, R., Imielinski, T., Swami, A., 1993. Mining association rules between sets of items in large databases. In: ACM SIGMOD International Conference on Management of Data, Washington, DC, pp. 207-216.
-
-
-
-
2
-
-
0031274825
-
Data mining with decision trees and decision rules
-
Apte C., and Weiss S.M. Data mining with decision trees and decision rules. Future Generation Computer Systems 13 2-3 (1997) 197-210
-
(1997)
Future Generation Computer Systems
, vol.13
, Issue.2-3
, pp. 197-210
-
-
Apte, C.1
Weiss, S.M.2
-
3
-
-
0027271787
-
-
Apte, C., Weiss, S.M., Grout, G., 1993. Predicting defects in disk drive manufacturing: A case study in high dimensional classification. In: IEEE Annual Conference on AI Applications, Orlando, FL.
-
-
-
-
4
-
-
0003990308
-
-
Prentice Hall, New Jersey
-
Banks J., Carson II J.S., Nelson B.L., and Nicol D.M. Discrete-event system simulation. third ed. (2001), Prentice Hall, New Jersey
-
(2001)
Discrete-event system simulation. third ed.
-
-
Banks, J.1
Carson II, J.S.2
Nelson, B.L.3
Nicol, D.M.4
-
5
-
-
0002098611
-
The use of workload information to control job lateness in controlled and uncontrolled release production systems
-
Bertrand J.W.M. The use of workload information to control job lateness in controlled and uncontrolled release production systems. Journal of Operations Management 3 2 (1983) 79-92
-
(1983)
Journal of Operations Management
, vol.3
, Issue.2
, pp. 79-92
-
-
Bertrand, J.W.M.1
-
6
-
-
0030211964
-
Bagging predictors
-
Breiman L. Bagging predictors. Machine Learning 24 2 (1996) 123-140
-
(1996)
Machine Learning
, vol.24
, Issue.2
, pp. 123-140
-
-
Breiman, L.1
-
7
-
-
0003802343
-
-
Wadsworth, London
-
Breiman L., Friedman J.H., Olshen R.A., and Stone C.J. Classification and regression trees (1984), Wadsworth, London
-
(1984)
Classification and regression trees
-
-
Breiman, L.1
Friedman, J.H.2
Olshen, R.A.3
Stone, C.J.4
-
8
-
-
0024303531
-
Survey of scheduling research involving due date determination decisions
-
Cheng T.C.E., and Gupta M.C. Survey of scheduling research involving due date determination decisions. European Journal of Operational Research 38 2 (1989) 156-166
-
(1989)
European Journal of Operational Research
, vol.38
, Issue.2
, pp. 156-166
-
-
Cheng, T.C.E.1
Gupta, M.C.2
-
9
-
-
34249966007
-
The CN2 induction algorithm
-
Clark P., and Niblett T. The CN2 induction algorithm. Machine Learning 3 4 (1989) 261-283
-
(1989)
Machine Learning
, vol.3
, Issue.4
, pp. 261-283
-
-
Clark, P.1
Niblett, T.2
-
10
-
-
33646503381
-
-
Dougherty, J., Kohavi, R., Sahami, M., 1995. Supervised and unsupervised discretization of continuous features. In: The Twelfth International Conference on Machine Learning, Tahoe City, CA, pp. 194-202.
-
-
-
-
13
-
-
0001153814
-
A dynamic forecasting model for job shop flowtime prediction and tardiness control
-
Enns S.T. A dynamic forecasting model for job shop flowtime prediction and tardiness control. International Journal of Production Research 33 5 (1995) 1295-1312
-
(1995)
International Journal of Production Research
, vol.33
, Issue.5
, pp. 1295-1312
-
-
Enns, S.T.1
-
14
-
-
0031224390
-
Use of contextual information for feature ranking and discretization
-
Hong S.J. Use of contextual information for feature ranking and discretization. IEEE Transactions on Knowledge and Data Engineering 9 5 (1997) 718-730
-
(1997)
IEEE Transactions on Knowledge and Data Engineering
, vol.9
, Issue.5
, pp. 718-730
-
-
Hong, S.J.1
-
15
-
-
0034275944
-
Quoting manufacturing due dates subject to a service level constraint
-
Hopp W.J., and Sturgis M.L.R. Quoting manufacturing due dates subject to a service level constraint. IIE Transactions 32 9 (2000) 771-784
-
(2000)
IIE Transactions
, vol.32
, Issue.9
, pp. 771-784
-
-
Hopp, W.J.1
Sturgis, M.L.R.2
-
16
-
-
0343299650
-
Strike rate matrices for integrating marketing and production during the tendering process in make-to-order subcontractors
-
Kingsman B.G., and Mercer A. Strike rate matrices for integrating marketing and production during the tendering process in make-to-order subcontractors. International Transactions in Operations Research 4 1 (1997) 251-257
-
(1997)
International Transactions in Operations Research
, vol.4
, Issue.1
, pp. 251-257
-
-
Kingsman, B.G.1
Mercer, A.2
-
17
-
-
0030410144
-
Responding to customer inquiries in make-to-order companies: Problems and solutions
-
Kingsman B.G., Hendry L., Mercer A., and de Souza A. Responding to customer inquiries in make-to-order companies: Problems and solutions. International Journal of Production Economics 46-47 December (1996) 219-231
-
(1996)
International Journal of Production Economics
, vol.46-47
, Issue.December
, pp. 219-231
-
-
Kingsman, B.G.1
Hendry, L.2
Mercer, A.3
de Souza, A.4
-
19
-
-
0034294996
-
Using data mining to find patterns in genetic algorithm solutions to a job shop schedule
-
Koonce D.A., and Tsai S.-C. Using data mining to find patterns in genetic algorithm solutions to a job shop schedule. Computers and Industrial Engineering 38 3 (2000) 361-374
-
(2000)
Computers and Industrial Engineering
, vol.38
, Issue.3
, pp. 361-374
-
-
Koonce, D.A.1
Tsai, S.-C.2
-
22
-
-
0032156317
-
A rule induction approach for determining the number of kanbans in a just-in-time production system
-
Markham I.S., Mathieu R.G., and Wray B.A. A rule induction approach for determining the number of kanbans in a just-in-time production system. Computers and Industrial Engineering 34 4 (1998) 717-727
-
(1998)
Computers and Industrial Engineering
, vol.34
, Issue.4
, pp. 717-727
-
-
Markham, I.S.1
Mathieu, R.G.2
Wray, B.A.3
-
24
-
-
0000006895
-
Demand management: The evaluation of price and due date negotiation strategies using simulation
-
Moodie D. Demand management: The evaluation of price and due date negotiation strategies using simulation. Journal of Production Operations Management Society 8 2 (1999) 151-162
-
(1999)
Journal of Production Operations Management Society
, vol.8
, Issue.2
, pp. 151-162
-
-
Moodie, D.1
-
25
-
-
33646521413
-
-
Quinlan, J.R., 1992. Learning with continuous classes. In: 5th Australian Joint Conference on Artificial Intelligence, Singapore, pp. 343-348.
-
-
-
-
27
-
-
33646498451
-
-
Quinlan, J.R., 2003. See5 and Cubist online user guides, Rulequest Research Data Mining Tools, Available from: .
-
-
-
-
28
-
-
0021468849
-
A framework for the study of due date management in job shops
-
Ragatz G., and Mabert V. A framework for the study of due date management in job shops. International Journal of Production Research 22 4 (1984) 685-695
-
(1984)
International Journal of Production Research
, vol.22
, Issue.4
, pp. 685-695
-
-
Ragatz, G.1
Mabert, V.2
-
29
-
-
29444438437
-
Dynamic job shop scheduling: A survey of simulation research
-
Ramasesh R. Dynamic job shop scheduling: A survey of simulation research. OMEGA 18 1 (1990) 43-57
-
(1990)
OMEGA
, vol.18
, Issue.1
, pp. 43-57
-
-
Ramasesh, R.1
-
31
-
-
0036889382
-
Operation-based flowtime estimation in a dynamic job shop
-
Sabuncuoglu I., and Comlekci A. Operation-based flowtime estimation in a dynamic job shop. OMEGA 30 6 (2002) 423-442
-
(2002)
OMEGA
, vol.30
, Issue.6
, pp. 423-442
-
-
Sabuncuoglu, I.1
Comlekci, A.2
-
32
-
-
0005823626
-
Experimental investigation of an FMS due-date scheduling problem: An evaluation of due-date assignment rules
-
Sabuncuoglu I., and Hommertzheim D.L. Experimental investigation of an FMS due-date scheduling problem: An evaluation of due-date assignment rules. International Journal of Computer Integrated Manufacturing 8 2 (1995) 133-144
-
(1995)
International Journal of Computer Integrated Manufacturing
, vol.8
, Issue.2
, pp. 133-144
-
-
Sabuncuoglu, I.1
Hommertzheim, D.L.2
-
33
-
-
0019560165
-
Due date assignment for production systems
-
Siedmann A., and Smith M.L. Due date assignment for production systems. Management Science 27 5 (1981) 571-581
-
(1981)
Management Science
, vol.27
, Issue.5
, pp. 571-581
-
-
Siedmann, A.1
Smith, M.L.2
-
34
-
-
0020500356
-
Due date selection procedures for job-shop simulation
-
Smith M.L., and Siedman A. Due date selection procedures for job-shop simulation. Computers and Industrial Engineering 7 3 (1983) 199-207
-
(1983)
Computers and Industrial Engineering
, vol.7
, Issue.3
, pp. 199-207
-
-
Smith, M.L.1
Siedman, A.2
-
38
-
-
0035546127
-
Economic due-date setting in job-shops based on routing and workload dependent flow time distribution functions
-
van Ooijen H.P.G., and Bertrand J.W.M. Economic due-date setting in job-shops based on routing and workload dependent flow time distribution functions. International Journal of Production Economics 74 1-3 (2001) 261-268
-
(2001)
International Journal of Production Economics
, vol.74
, Issue.1-3
, pp. 261-268
-
-
van Ooijen, H.P.G.1
Bertrand, J.W.M.2
-
39
-
-
0035479473
-
Computer simulation of due-date setting in multi-machine job shops
-
Veral E. Computer simulation of due-date setting in multi-machine job shops. Computers and Industrial Engineering 41 1 (2001) 77-94
-
(2001)
Computers and Industrial Engineering
, vol.41
, Issue.1
, pp. 77-94
-
-
Veral, E.1
-
41
-
-
0018454859
-
A simulation study of predictable due-dates
-
Weeks J.K. A simulation study of predictable due-dates. Management Science 25 4 (1979) 363-373
-
(1979)
Management Science
, vol.25
, Issue.4
, pp. 363-373
-
-
Weeks, J.K.1
|