메뉴 건너뛰기




Volumn 25, Issue 4, 2006, Pages 301-312

A robust FMS control architecture with an embedded adaptive scheduling mechanism

Author keywords

Adaptive Scheduling; Dynamic vs. Static Scheduling; FMS Control; Scheduling Horizon Reduction; SimulationBased Control

Indexed keywords

COMPUTER SIMULATION; CONTROL EQUIPMENT; EMBEDDED SYSTEMS; RANDOM PROCESSES; SCHEDULING;

EID: 42949106196     PISSN: 02786125     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0278-6125(06)80242-6     Document Type: Article
Times cited : (7)

References (36)
  • 1
    • 0032661588 scopus 로고    scopus 로고
    • Neural network-based adaptive production control system for a flexible manufacturing cell under a random environment
    • Arzi Y., and Iaroslavitz L. Neural network-based adaptive production control system for a flexible manufacturing cell under a random environment. IIE Trans v31 n3 (1999) 217-230
    • (1999) IIE Trans , vol.v31 , Issue.n3 , pp. 217-230
    • Arzi, Y.1    Iaroslavitz, L.2
  • 2
    • 0033207947 scopus 로고    scopus 로고
    • Towards the integration of flexible manufacturing system scheduling
    • Balogun O.O., and Popplewell K. Towards the integration of flexible manufacturing system scheduling. Int'l Journal of Production Research v37 n15 (1999) 3399-3428
    • (1999) Int'l Journal of Production Research , vol.v37 , Issue.n15 , pp. 3399-3428
    • Balogun, O.O.1    Popplewell, K.2
  • 3
    • 0031210787 scopus 로고    scopus 로고
    • Real-time operational control of an FMS with full routing flexibility
    • Byrne M.D., and Chutima P. Real-time operational control of an FMS with full routing flexibility. Int'l Journal of Production Economics v51 n1-2 (1997) 109-113
    • (1997) Int'l Journal of Production Economics , vol.v51 , Issue.n1-2 , pp. 109-113
    • Byrne, M.D.1    Chutima, P.2
  • 4
    • 0036069575 scopus 로고    scopus 로고
    • The state of the art in simulation study on FMS scheduling: a comprehensive survey
    • Chan F.T.S., Chan H.K., and Lau H.C.W. The state of the art in simulation study on FMS scheduling: a comprehensive survey. Int'l Journal of Advanced Mfg. Technology v19 n11 (2002) 830-849
    • (2002) Int'l Journal of Advanced Mfg. Technology , vol.v19 , Issue.n11 , pp. 830-849
    • Chan, F.T.S.1    Chan, H.K.2    Lau, H.C.W.3
  • 6
    • 0242333158 scopus 로고    scopus 로고
    • Adaptive scheduling in random flexible manufacturing systems subject to machine breakdowns
    • Chen J., and Chen F.F. Adaptive scheduling in random flexible manufacturing systems subject to machine breakdowns. Int'l Journal of Production Research v41 n9 (2003) 1927-1951
    • (2003) Int'l Journal of Production Research , vol.v41 , Issue.n9 , pp. 1927-1951
    • Chen, J.1    Chen, F.F.2
  • 7
    • 0027576654 scopus 로고
    • A robust adaptive scheduler for an intelligent workstation controller
    • Cho H., and Wysk R.A. A robust adaptive scheduler for an intelligent workstation controller. Int'l Journal of Production Research v31 n4 (1993) 771-789
    • (1993) Int'l Journal of Production Research , vol.v31 , Issue.n4 , pp. 771-789
    • Cho, H.1    Wysk, R.A.2
  • 8
    • 0035360038 scopus 로고    scopus 로고
    • Dynamic scheduling of manufacturing job-shops using genetic algorithms
    • Chryssolouris G., and Subramaniam V. Dynamic scheduling of manufacturing job-shops using genetic algorithms. Journal of Intelligent Mfg v12 n3 (2001) 281-293
    • (2001) Journal of Intelligent Mfg , vol.v12 , Issue.n3 , pp. 281-293
    • Chryssolouris, G.1    Subramaniam, V.2
  • 9
    • 0032117281 scopus 로고    scopus 로고
    • Complexity in manufacturing systems: part 1 - analysis of static complexity
    • Deshmukh A., Talavage J.J., and Barash M.M. Complexity in manufacturing systems: part 1 - analysis of static complexity. IIE Trans v30 n7 (1998) 645-655
    • (1998) IIE Trans , vol.v30 , Issue.n7 , pp. 645-655
    • Deshmukh, A.1    Talavage, J.J.2    Barash, M.M.3
  • 10
    • 0009725964 scopus 로고
    • Case based reactive scheduling
    • Kerr R., and Szelke E. (Eds), Chapman and Hall
    • Dorn J. Case based reactive scheduling. In: Kerr R., and Szelke E. (Eds). Chapter 4. Artificial Intelligence in Reactive Scheduling (1995), Chapman and Hall 32-50
    • (1995) Chapter 4. Artificial Intelligence in Reactive Scheduling , pp. 32-50
    • Dorn, J.1
  • 11
    • 0344550494 scopus 로고    scopus 로고
    • Agent-based architecture for manufacturing system control
    • Fan C.K., and Wong T.N. Agent-based architecture for manufacturing system control. Integrated Mfg. Systems v14 n7 (2003) 599-609
    • (2003) Integrated Mfg. Systems , vol.v14 , Issue.n7 , pp. 599-609
    • Fan, C.K.1    Wong, T.N.2
  • 12
  • 13
    • 0142154202 scopus 로고    scopus 로고
    • The application of adaptive genetic algorithms in FMS dynamic rescheduling
    • Honghong Y., and Zhiming W. The application of adaptive genetic algorithms in FMS dynamic rescheduling. Int'l Journal of Computer Integrated Mfg v16 n6 (2003) 382-397
    • (2003) Int'l Journal of Computer Integrated Mfg , vol.v16 , Issue.n6 , pp. 382-397
    • Honghong, Y.1    Zhiming, W.2
  • 14
    • 0026374056 scopus 로고
    • A transient-based real-time scheduling algorithm in FMS
    • Ishii N., and Talavage J.J. A transient-based real-time scheduling algorithm in FMS. Int'l Journal of Production Research v29 n12 (1991) 2501-2520
    • (1991) Int'l Journal of Production Research , vol.v29 , Issue.n12 , pp. 2501-2520
    • Ishii, N.1    Talavage, J.J.2
  • 15
    • 0032163477 scopus 로고    scopus 로고
    • A real-time scheduling mechanism for a flexible manufacturing system: using simulation and dispatching rules
    • Jeong K.-C., and Kim Y.-D. A real-time scheduling mechanism for a flexible manufacturing system: using simulation and dispatching rules. Int'l Journal of Production Research v36 n9 (1998) 2609-2626
    • (1998) Int'l Journal of Production Research , vol.v36 , Issue.n9 , pp. 2609-2626
    • Jeong, K.-C.1    Kim, Y.-D.2
  • 16
    • 0031073978 scopus 로고    scopus 로고
    • A fuzzy integrated decision-making support system for scheduling of FMS using simulation
    • Kazerooni A., Chan F.T.S., and Abhary K. A fuzzy integrated decision-making support system for scheduling of FMS using simulation. Computer Integrated Mfg. Systems v10 n1 (1997) 27-34
    • (1997) Computer Integrated Mfg. Systems , vol.v10 , Issue.n1 , pp. 27-34
    • Kazerooni, A.1    Chan, F.T.S.2    Abhary, K.3
  • 18
    • 0028426236 scopus 로고
    • Learning-based scheduling in a flexible manufacturing flow line
    • Piramuthu S., Raman N., and Shaw M.J. Learning-based scheduling in a flexible manufacturing flow line. IEEE Trans. on Engg. Mgmt v41 n2 (1994) 172-182
    • (1994) IEEE Trans. on Engg. Mgmt , vol.v41 , Issue.n2 , pp. 172-182
    • Piramuthu, S.1    Raman, N.2    Shaw, M.J.3
  • 20
    • 0001827599 scopus 로고
    • Classification and review of FMS scheduling procedures." Production Planning &
    • Rachamadugu R., and Stecke K.E. Classification and review of FMS scheduling procedures." Production Planning &. Control v5 n1 (1994) 2-20
    • (1994) Control , vol.v5 , Issue.n1 , pp. 2-20
    • Rachamadugu, R.1    Stecke, K.E.2
  • 23
    • 0242485199 scopus 로고    scopus 로고
    • Reactive scheduling in a dynamic and stochastic FMS environment
    • Sabuncuoglu I., and Kizilisik O.B. Reactive scheduling in a dynamic and stochastic FMS environment. Int'l Journal of Production Research v41 n17 (2003) 4211-4231
    • (2003) Int'l Journal of Production Research , vol.v41 , Issue.n17 , pp. 4211-4231
    • Sabuncuoglu, I.1    Kizilisik, O.B.2
  • 24
    • 3242708643 scopus 로고    scopus 로고
    • Product-based and resource-based heterarchical approaches for dynamic FMS scheduling
    • Sallez Y., Trentesaux D., Berger T., and Tahon C. Product-based and resource-based heterarchical approaches for dynamic FMS scheduling. Computers and Industrial Engg v46 n4 (2004) 611-623
    • (2004) Computers and Industrial Engg , vol.v46 , Issue.n4 , pp. 611-623
    • Sallez, Y.1    Trentesaux, D.2    Berger, T.3    Tahon, C.4
  • 25
    • 0035254377 scopus 로고    scopus 로고
    • Cooperative dispatching - exploiting the flexibility of an FMS by means of incremental optimization
    • Seifert R.W., and Morito S. Cooperative dispatching - exploiting the flexibility of an FMS by means of incremental optimization. European Journal of Operational Research v129 n1 (2001) 116-133
    • (2001) European Journal of Operational Research , vol.v129 , Issue.n1 , pp. 116-133
    • Seifert, R.W.1    Morito, S.2
  • 26
    • 42949132332 scopus 로고    scopus 로고
    • Controlling flexible manufacturing systems based on a dynamic selection of an appropriate operational criteria and scheduling policy
    • Shnits B., and Sinreich D. Controlling flexible manufacturing systems based on a dynamic selection of an appropriate operational criteria and scheduling policy. Int'l Journal of Flexible Mfg. Systems v18 n1 (2006) 1-27
    • (2006) Int'l Journal of Flexible Mfg. Systems , vol.v18 , Issue.n1 , pp. 1-27
    • Shnits, B.1    Sinreich, D.2
  • 27
    • 0030711211 scopus 로고    scopus 로고
    • Intelligent simulation-based scheduling of workcells: an approach
    • Soon T.H., and De Souza R. Intelligent simulation-based scheduling of workcells: an approach. Integrated Mfg. Systems v8 n1 (1997) 6-23
    • (1997) Integrated Mfg. Systems , vol.v8 , Issue.n1 , pp. 6-23
    • Soon, T.H.1    De Souza, R.2
  • 28
    • 33646394085 scopus 로고    scopus 로고
    • A fuzzy logic modelling of dynamic scheduling in FMS
    • Srinoi P., Shayan E., and Ghotb F. A fuzzy logic modelling of dynamic scheduling in FMS. Int'l Journal of Production Research v44 n11 (2006) 2183-2203
    • (2006) Int'l Journal of Production Research , vol.v44 , Issue.n11 , pp. 2183-2203
    • Srinoi, P.1    Shayan, E.2    Ghotb, F.3
  • 30
    • 0344320671 scopus 로고    scopus 로고
    • A dynamic reactive scheduling mechanism for responding to changes of production orders and manufacturing resources
    • Sun J., and Xue D. A dynamic reactive scheduling mechanism for responding to changes of production orders and manufacturing resources. Computers in Industry v46 n2 (2001) 189-207
    • (2001) Computers in Industry , vol.v46 , Issue.n2 , pp. 189-207
    • Sun, J.1    Xue, D.2
  • 32
    • 0242703954 scopus 로고    scopus 로고
    • Rescheduling manufacturing systems: a framework of strategies, policies, and methods
    • Vieira G.E., Herrmann J.W., and Lin E. Rescheduling manufacturing systems: a framework of strategies, policies, and methods. Journal of Scheduling v6 n1 (2003) 39-62
    • (2003) Journal of Scheduling , vol.v6 , Issue.n1 , pp. 39-62
    • Vieira, G.E.1    Herrmann, J.W.2    Lin, E.3
  • 33
    • 33746794581 scopus 로고    scopus 로고
    • Integrated process planning and scheduling/rescheduling - an agentbased approach
    • Wang T.N., Leung C.W., Mak K.L., and Fung R.Y.K. Integrated process planning and scheduling/rescheduling - an agentbased approach. Int'l Journal of Production Research v44 n18-19 (2006) 3627-3655
    • (2006) Int'l Journal of Production Research , vol.v44 , Issue.n18-19 , pp. 3627-3655
    • Wang, T.N.1    Leung, C.W.2    Mak, K.L.3    Fung, R.Y.K.4
  • 34
    • 0024731596 scopus 로고
    • An application of discreteevent simulation to on-line control and scheduling in flexible manufacturing
    • Wu S.-Y.D., and Wysk R.A. An application of discreteevent simulation to on-line control and scheduling in flexible manufacturing. Int'l Journal of Production Research v27 n9 (1989) 1603-1623
    • (1989) Int'l Journal of Production Research , vol.v27 , Issue.n9 , pp. 1603-1623
    • Wu, S.-Y.D.1    Wysk, R.A.2
  • 35
    • 0012551953 scopus 로고
    • Rapid prototyping of shop floor control systems for computer integrated manufacturing
    • Wysk R., Joshi S.B., and Pegden C.D. Rapid prototyping of shop floor control systems for computer integrated manufacturing. ARPA Project #8881 (1992)
    • (1992) ARPA Project #8881
    • Wysk, R.1    Joshi, S.B.2    Pegden, C.D.3
  • 36
    • 0032686543 scopus 로고    scopus 로고
    • Fuzzy inferencebased multiple criteria FMS scheduling
    • Yu L., Shih H.M., and Sekiguchi T. Fuzzy inferencebased multiple criteria FMS scheduling. Int'l Journal of Production Research v37 n10 (1999) 2315-2333
    • (1999) Int'l Journal of Production Research , vol.v37 , Issue.n10 , pp. 2315-2333
    • Yu, L.1    Shih, H.M.2    Sekiguchi, T.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.