메뉴 건너뛰기




Volumn 23, Issue 9-10, 2004, Pages 768-775

Due-date assignment in wafer fabrication using artificial neural networks

Author keywords

Artificial neural network; Due date assignment; Shop floor control; Simulation; Wafer fabrication

Indexed keywords

ARTIFICIAL INTELLIGENCE; BENCHMARKING; COMPUTER SIMULATION; MICROPROCESSOR CHIPS; REGRESSION ANALYSIS; SEMICONDUCTOR DEVICE MANUFACTURE; STATISTICAL METHODS;

EID: 2942642529     PISSN: 02683768     EISSN: None     Source Type: Journal    
DOI: 10.1007/s00170-003-1644-8     Document Type: Review
Times cited : (56)

References (17)
  • 2
    • 1942474793 scopus 로고
    • Due date selection procedure for job shop simulation
    • Smith ML, Seidman A (1993) Due date selection procedure for job shop simulation. Comput Ind Eng 7:297-320
    • (1993) Comput Ind Eng , vol.7 , pp. 297-320
    • Smith, M.L.1    Seidman, A.2
  • 3
    • 0024303531 scopus 로고
    • Survey of scheduling research involving due date determination decisions
    • Cheng TCE, Gupta MC (1989) Survey of scheduling research involving due date determination decisions. Eur J Oper Res 38:156-166
    • (1989) Eur J Oper Res , vol.38 , pp. 156-166
    • Cheng, T.C.E.1    Gupta, M.C.2
  • 4
    • 0016929914 scopus 로고
    • Due-date in job shop scheduling
    • Eilon S, Chowdhury IG (1976) Due-date in job shop scheduling. Int J Prod Res 14:223-138
    • (1976) Int J Prod Res , vol.14 , pp. 223-138
    • Eilon, S.1    Chowdhury, I.G.2
  • 5
    • 0026186620 scopus 로고
    • Dynamic rules for due-date assignment
    • Vig MM, Dooley KJ (1991) Dynamic rules for due-date assignment. Int J Prod Res 29:1361-1377
    • (1991) Int J Prod Res , vol.29 , pp. 1361-1377
    • Vig, M.M.1    Dooley, K.J.2
  • 6
    • 0018454859 scopus 로고
    • A simulation study of predictable due-dates
    • Weeks JK (1979) A simulation study of predictable due-dates. Manage Sci 25:363-373
    • (1979) Manage Sci , vol.25 , pp. 363-373
    • Weeks, J.K.1
  • 7
    • 0027850894 scopus 로고
    • A probabilistic cost-based due date assignment model for job shops
    • Kaplan AC, Urnal AT (1993) A probabilistic cost-based due date assignment model for job shops. Int J Prod Res 31:2817-2834
    • (1993) Int J Prod Res , vol.31 , pp. 2817-2834
    • Kaplan, A.C.1    Urnal, A.T.2
  • 8
    • 0027657253 scopus 로고
    • Job shop flow time prediction and tardiness control using queue analysis
    • Enns ST (1993) Job shop flow time prediction and tardiness control using queue analysis. Int J Prod Res 31:2045-2057
    • (1993) Int J Prod Res , vol.31 , pp. 2045-2057
    • Enns, S.T.1
  • 9
    • 0001385963 scopus 로고
    • Regression-based due date assignment rules for improved assembly shop performance
    • Smith CH, Minor ED, Wen HJ (1995) Regression-based due date assignment rules for improved assembly shop performance. Int J Prod Res 33:2375-2385
    • (1995) Int J Prod Res , vol.33 , pp. 2375-2385
    • Smith, C.H.1    Minor, E.D.2    Wen, H.J.3
  • 10
    • 84990604706 scopus 로고
    • Using artificial neural networks to determine internally-set due-date assignments for shop scheduling
    • Philipoom PR, Rees LR, Wiegmann L (1994) Using artificial neural networks to determine internally-set due-date assignments for shop scheduling. Decis Sci 25:825-847
    • (1994) Decis Sci , vol.25 , pp. 825-847
    • Philipoom, P.R.1    Rees, L.R.2    Wiegmann, L.3
  • 12
    • 0026945242 scopus 로고
    • Neural networks applications in manufacturing process
    • Udo GJ (1992) Neural networks applications in manufacturing process. Comput Ind Eng 23:97-100
    • (1992) Comput Ind Eng , vol.23 , pp. 97-100
    • Udo, G.J.1
  • 13
    • 0001870328 scopus 로고
    • A simulation analysis of due date assignment rules
    • Ragatz GL, Mabert VA (1984) A simulation analysis of due date assignment rules. J Oper Manage 5:27-39
    • (1984) J Oper Manage , vol.5 , pp. 27-39
    • Ragatz, G.L.1    Mabert, V.A.2
  • 14
    • 0032656193 scopus 로고    scopus 로고
    • The construction of production performance prediction system for semiconductor manufacturing with artificial neural networks
    • Huang CL, Huang YH, Chang TY, Chang SH, Chung CH, Huang DT, Li RK (1999) The construction of production performance prediction system for semiconductor manufacturing with artificial neural networks. Int J Prod Res 37:1387-1402
    • (1999) Int J Prod Res , vol.37 , pp. 1387-1402
    • Huang, C.L.1    Huang, Y.H.2    Chang, T.Y.3    Chang, S.H.4    Chung, C.H.5    Huang, D.T.6    Li, R.K.7
  • 15
    • 0028730645 scopus 로고
    • A study of factors affecting due-date predictability in a simulation dynamic job shops
    • Chang FCR (1994) A study of factors affecting due-date predictability in a simulation dynamic job shops. J Manuf Syst 13:393-400
    • (1994) J Manuf Syst , vol.13 , pp. 393-400
    • Chang, F.C.R.1
  • 16
    • 0030129222 scopus 로고    scopus 로고
    • Using neural networks to predict component inspection requirements for aging aircraft
    • Shyur HJ, Luxhoj JT, Williams TP (1996) Using neural networks to predict component inspection requirements for aging aircraft. Comput Ind Eng 30:257-267
    • (1996) Comput Ind Eng , vol.30 , pp. 257-267
    • Shyur, H.J.1    Luxhoj, J.T.2    Williams, T.P.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.