-
1
-
-
0031246943
-
The design of due date assignment model and the determination of flow time control parameters for the wafer fabrication factories
-
Chung SH, Yang MH, Cheng CM (1997) The design of due date assignment model and the determination of flow time control parameters for the wafer fabrication factories. IEEE Transaction on Component, Packaging, and Manufacturing Technology - Part C 20:278-287
-
(1997)
IEEE Transaction on Component, Packaging, and Manufacturing Technology - Part C
, vol.20
, pp. 278-287
-
-
Chung, S.H.1
Yang, M.H.2
Cheng, C.M.3
-
2
-
-
1942474793
-
Due date selection procedure for job shop simulation
-
Smith ML, Seidman A (1993) Due date selection procedure for job shop simulation. Comput Ind Eng 7:297-320
-
(1993)
Comput Ind Eng
, vol.7
, pp. 297-320
-
-
Smith, M.L.1
Seidman, A.2
-
3
-
-
0024303531
-
Survey of scheduling research involving due date determination decisions
-
Cheng TCE, Gupta MC (1989) Survey of scheduling research involving due date determination decisions. Eur J Oper Res 38:156-166
-
(1989)
Eur J Oper Res
, vol.38
, pp. 156-166
-
-
Cheng, T.C.E.1
Gupta, M.C.2
-
4
-
-
0016929914
-
Due-date in job shop scheduling
-
Eilon S, Chowdhury IG (1976) Due-date in job shop scheduling. Int J Prod Res 14:223-138
-
(1976)
Int J Prod Res
, vol.14
, pp. 223-138
-
-
Eilon, S.1
Chowdhury, I.G.2
-
5
-
-
0026186620
-
Dynamic rules for due-date assignment
-
Vig MM, Dooley KJ (1991) Dynamic rules for due-date assignment. Int J Prod Res 29:1361-1377
-
(1991)
Int J Prod Res
, vol.29
, pp. 1361-1377
-
-
Vig, M.M.1
Dooley, K.J.2
-
6
-
-
0018454859
-
A simulation study of predictable due-dates
-
Weeks JK (1979) A simulation study of predictable due-dates. Manage Sci 25:363-373
-
(1979)
Manage Sci
, vol.25
, pp. 363-373
-
-
Weeks, J.K.1
-
7
-
-
0027850894
-
A probabilistic cost-based due date assignment model for job shops
-
Kaplan AC, Urnal AT (1993) A probabilistic cost-based due date assignment model for job shops. Int J Prod Res 31:2817-2834
-
(1993)
Int J Prod Res
, vol.31
, pp. 2817-2834
-
-
Kaplan, A.C.1
Urnal, A.T.2
-
8
-
-
0027657253
-
Job shop flow time prediction and tardiness control using queue analysis
-
Enns ST (1993) Job shop flow time prediction and tardiness control using queue analysis. Int J Prod Res 31:2045-2057
-
(1993)
Int J Prod Res
, vol.31
, pp. 2045-2057
-
-
Enns, S.T.1
-
9
-
-
0001385963
-
Regression-based due date assignment rules for improved assembly shop performance
-
Smith CH, Minor ED, Wen HJ (1995) Regression-based due date assignment rules for improved assembly shop performance. Int J Prod Res 33:2375-2385
-
(1995)
Int J Prod Res
, vol.33
, pp. 2375-2385
-
-
Smith, C.H.1
Minor, E.D.2
Wen, H.J.3
-
10
-
-
84990604706
-
Using artificial neural networks to determine internally-set due-date assignments for shop scheduling
-
Philipoom PR, Rees LR, Wiegmann L (1994) Using artificial neural networks to determine internally-set due-date assignments for shop scheduling. Decis Sci 25:825-847
-
(1994)
Decis Sci
, vol.25
, pp. 825-847
-
-
Philipoom, P.R.1
Rees, L.R.2
Wiegmann, L.3
-
12
-
-
0026945242
-
Neural networks applications in manufacturing process
-
Udo GJ (1992) Neural networks applications in manufacturing process. Comput Ind Eng 23:97-100
-
(1992)
Comput Ind Eng
, vol.23
, pp. 97-100
-
-
Udo, G.J.1
-
13
-
-
0001870328
-
A simulation analysis of due date assignment rules
-
Ragatz GL, Mabert VA (1984) A simulation analysis of due date assignment rules. J Oper Manage 5:27-39
-
(1984)
J Oper Manage
, vol.5
, pp. 27-39
-
-
Ragatz, G.L.1
Mabert, V.A.2
-
14
-
-
0032656193
-
The construction of production performance prediction system for semiconductor manufacturing with artificial neural networks
-
Huang CL, Huang YH, Chang TY, Chang SH, Chung CH, Huang DT, Li RK (1999) The construction of production performance prediction system for semiconductor manufacturing with artificial neural networks. Int J Prod Res 37:1387-1402
-
(1999)
Int J Prod Res
, vol.37
, pp. 1387-1402
-
-
Huang, C.L.1
Huang, Y.H.2
Chang, T.Y.3
Chang, S.H.4
Chung, C.H.5
Huang, D.T.6
Li, R.K.7
-
15
-
-
0028730645
-
A study of factors affecting due-date predictability in a simulation dynamic job shops
-
Chang FCR (1994) A study of factors affecting due-date predictability in a simulation dynamic job shops. J Manuf Syst 13:393-400
-
(1994)
J Manuf Syst
, vol.13
, pp. 393-400
-
-
Chang, F.C.R.1
-
16
-
-
0030129222
-
Using neural networks to predict component inspection requirements for aging aircraft
-
Shyur HJ, Luxhoj JT, Williams TP (1996) Using neural networks to predict component inspection requirements for aging aircraft. Comput Ind Eng 30:257-267
-
(1996)
Comput Ind Eng
, vol.30
, pp. 257-267
-
-
Shyur, H.J.1
Luxhoj, J.T.2
Williams, T.P.3
|