메뉴 건너뛰기




Volumn 21, Issue 5, 2002, Pages 380-394

Simulation-based shop floor control

Author keywords

CIM; Real time Scheduling; Shop Floor Control; Simulation

Indexed keywords


EID: 0042370532     PISSN: 02786125     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0278-6125(02)80036-X     Document Type: Article
Times cited : (30)

References (25)
  • 3
    • 0030395612 scopus 로고    scopus 로고
    • Simulation systems for real time planning scheduling and control
    • Drake, Glenn R. and Smith, Jeffrey (1996). "Simulation systems for real time planning scheduling and control." Proc. of 1996 Winter Simulation Conf.
    • (1996) Proc. of 1996 Winter Simulation Conf.
    • Drake, G.R.1    Smith, J.2
  • 4
    • 0029543165 scopus 로고
    • Simulation as a planning and scheduling tool for flexible manufacturing systems
    • Drake, G.R.; Smith, J.S.; and Peters, B.A. (1995). "Simulation as a planning and scheduling tool for flexible manufacturing systems." Proc. of 1995 Winter Simulation Conf., pp805-812.
    • (1995) Proc. of 1995 Winter Simulation Conf. , pp. 805-812
    • Drake, G.R.1    Smith, J.S.2    Peters, B.A.3
  • 5
    • 0001982473 scopus 로고
    • Real-time scheduling in computer integrated manufacturing: A review of recent literature
    • Harmonosky, C.M. and Robohn, S.F. (1991). "Real-time scheduling in computer integrated manufacturing: A review of recent literature." Int'l Journal of Computer Integrated Mfg., pp331-340.
    • (1991) Int'l Journal of Computer Integrated Mfg. , pp. 331-340
    • Harmonosky, C.M.1    Robohn, S.F.2
  • 8
    • 0001980185 scopus 로고
    • A multi-level/multi-layer architecture for intelligent shop floor control
    • Jones, A.T. and Saleh, A. (1990). "A multi-level/multi-layer architecture for intelligent shop floor control." Int'l Journal of Computer Integrated Mfg. (v3, n1), pp60-70.
    • (1990) Int'l Journal of Computer Integrated Mfg. , vol.3 , Issue.1 , pp. 60-70
    • Jones, A.T.1    Saleh, A.2
  • 9
    • 0025428936 scopus 로고
    • A scaleable architecture for CIM shop floor control
    • A. Jones, ed. Gaithersburg, MD: Nat'l Institute of Standards and Technology
    • Joshi, S.B.; Wysk, R.A.; and Jones, A. (1990). "A scaleable architecture for CIM shop floor control." Proc. of Cimcon '90. A. Jones, ed. Gaithersburg, MD: Nat'l Institute of Standards and Technology, pp21-33.
    • (1990) Proc. of Cimcon '90 , pp. 21-33
    • Joshi, S.B.1    Wysk, R.A.2    Jones, A.3
  • 10
    • 0029376103 scopus 로고
    • Process planning interface for a shop floor control architecture for computer integrated manufacturing
    • Lee, S.; Wysk, R.A.; and Smith, J.S. (1994). "Process planning interface for a shop floor control architecture for computer integrated manufacturing." Int'l Journal of Production Research (v33, n9), pp2415-2435.
    • (1994) Int'l Journal of Production Research , vol.33 , Issue.9 , pp. 2415-2435
    • Lee, S.1    Wysk, R.A.2    Smith, J.S.3
  • 11
    • 0041584101 scopus 로고
    • A compact representation of alternative process plans/routing for FMS control activities
    • Mettala, E.G. and Joshi, S.B. (1993). "A compact representation of alternative process plans/routing for FMS control activities." Int'l Journal of Design and Mfg. (v3), pp91-104.
    • (1993) Int'l Journal of Design and Mfg. , vol.3 , pp. 91-104
    • Mettala, E.G.1    Joshi, S.B.2
  • 12
    • 0002436155 scopus 로고
    • On-line simulation for real-time scheduling of manufacturing systems
    • Rogers, P. and Flanagan, M. (1991). "On-line simulation for real-time scheduling of manufacturing systems." Industrial Engg. (v23), pp37-40.
    • (1991) Industrial Engg. , vol.23 , pp. 37-40
    • Rogers, P.1    Flanagan, M.2
  • 13
    • 0027810775 scopus 로고
    • Simulation for real-time decision making in manufacturing systems
    • Rogers, P. and Gordon, R.J. (1993). "Simulation for real-time decision making in manufacturing systems." Proc. of 1993 Winter Simulation Conf., pp866-874.
    • (1993) Proc. of 1993 Winter Simulation Conf. , pp. 866-874
    • Rogers, P.1    Gordon, R.J.2
  • 16
    • 0001450722 scopus 로고
    • A shop floor controller class for computer-integrated manufacturing
    • Smith, J. and Joshi, S. (1995). "A shop floor controller class for computer-integrated manufacturing." Int'l Journal of Computer Integrated Mfg. (v8, n5), pp327-339.
    • (1995) Int'l Journal of Computer Integrated Mfg. , vol.8 , Issue.5 , pp. 327-339
    • Smith, J.1    Joshi, S.2
  • 19
    • 0035396337 scopus 로고    scopus 로고
    • Automatic simulation model generation for simulation-based, real-time shop floor control
    • Son, Y. and Wysk, R.A. (2001). "Automatic simulation model generation for simulation-based, real-time shop floor control." Computers in Industry (v45, n3), pp291-308.
    • (2001) Computers in Industry , vol.45 , Issue.3
    • Son, Y.1    Wysk, R.A.2
  • 20
    • 0037236081 scopus 로고    scopus 로고
    • Simulation based shop floor control: Formal model, model generation, and control interface
    • Son, Y.; Wysk, R.A.; and Jones, A.T. (2003). "Simulation based shop floor control: Formal model, model generation, and control interface." IIE Trans. on Design and Mfg. (v35, n1), pp29-48.
    • (2003) IIE Trans. on Design and Mfg. , vol.35 , Issue.1 , pp. 29-48
    • Son, Y.1    Wysk, R.A.2    Jones, A.T.3
  • 21
    • 0039896159 scopus 로고    scopus 로고
    • Resource modeling for the integration of the manufacturing enterprise
    • Steele, J.; Son, Y.; and Wysk, R.A. (2001). "Resource modeling for the integration of the manufacturing enterprise." Journal of Manufacturing Systems (v19, n6), pp407-427.
    • (2001) Journal of Manufacturing Systems , vol.19 , Issue.6 , pp. 407-427
    • Steele, J.1    Son, Y.2    Wysk, R.A.3
  • 22
    • 0029473488 scopus 로고
    • Simulation for evaluating machine and AGV scheduling rules in an FMS environment
    • Tunali, S. (1995). "Simulation for evaluating machine and AGV scheduling rules in an FMS environment." Engg. Mgmt. Conf., pp433-438.
    • (1995) Engg. Mgmt. Conf. , pp. 433-438
    • Tunali, S.1
  • 23
    • 0024731596 scopus 로고
    • An application of discrete-event simulation to on-line control and scheduling in flexible manufacturing
    • Wu, S.D. and Wysk, R.A. (1989). "An application of discrete-event simulation to on-line control and scheduling in flexible manufacturing." Int'l Journal of Production Research (v27, n9), pp1603-1623.
    • (1989) Int'l Journal of Production Research , vol.27 , Issue.9 , pp. 1603-1623
    • Wu, S.D.1    Wysk, R.A.2
  • 24
    • 0012551953 scopus 로고
    • Rapid prototyping of shop floor control systems for computer integrated manufacturing
    • Wysk, R.; Joshi, S.B.; and Pegden, C.D. (1992). "Rapid prototyping of shop floor control systems for computer integrated manufacturing." ARPA project #8881.
    • (1992) ARPA Project #8881
    • Wysk, R.1    Joshi, S.B.2    Pegden, C.D.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.