-
4
-
-
0029543165
-
Simulation as a planning and scheduling tool for flexible manufacturing systems
-
Drake, G.R.; Smith, J.S.; and Peters, B.A. (1995). "Simulation as a planning and scheduling tool for flexible manufacturing systems." Proc. of 1995 Winter Simulation Conf., pp805-812.
-
(1995)
Proc. of 1995 Winter Simulation Conf.
, pp. 805-812
-
-
Drake, G.R.1
Smith, J.S.2
Peters, B.A.3
-
5
-
-
0001982473
-
Real-time scheduling in computer integrated manufacturing: A review of recent literature
-
Harmonosky, C.M. and Robohn, S.F. (1991). "Real-time scheduling in computer integrated manufacturing: A review of recent literature." Int'l Journal of Computer Integrated Mfg., pp331-340.
-
(1991)
Int'l Journal of Computer Integrated Mfg.
, pp. 331-340
-
-
Harmonosky, C.M.1
Robohn, S.F.2
-
6
-
-
0003620778
-
-
Reading, MA: Addison-Wesley Publishing
-
Hopcroft, J.E. and Ullman, J.D. (1979). Introduction to Automata Theory, Languages, and Computation. Reading, MA: Addison-Wesley Publishing.
-
(1979)
Introduction to Automata Theory, Languages, and Computation
-
-
Hopcroft, J.E.1
Ullman, J.D.2
-
8
-
-
0001980185
-
A multi-level/multi-layer architecture for intelligent shop floor control
-
Jones, A.T. and Saleh, A. (1990). "A multi-level/multi-layer architecture for intelligent shop floor control." Int'l Journal of Computer Integrated Mfg. (v3, n1), pp60-70.
-
(1990)
Int'l Journal of Computer Integrated Mfg.
, vol.3
, Issue.1
, pp. 60-70
-
-
Jones, A.T.1
Saleh, A.2
-
9
-
-
0025428936
-
A scaleable architecture for CIM shop floor control
-
A. Jones, ed. Gaithersburg, MD: Nat'l Institute of Standards and Technology
-
Joshi, S.B.; Wysk, R.A.; and Jones, A. (1990). "A scaleable architecture for CIM shop floor control." Proc. of Cimcon '90. A. Jones, ed. Gaithersburg, MD: Nat'l Institute of Standards and Technology, pp21-33.
-
(1990)
Proc. of Cimcon '90
, pp. 21-33
-
-
Joshi, S.B.1
Wysk, R.A.2
Jones, A.3
-
10
-
-
0029376103
-
Process planning interface for a shop floor control architecture for computer integrated manufacturing
-
Lee, S.; Wysk, R.A.; and Smith, J.S. (1994). "Process planning interface for a shop floor control architecture for computer integrated manufacturing." Int'l Journal of Production Research (v33, n9), pp2415-2435.
-
(1994)
Int'l Journal of Production Research
, vol.33
, Issue.9
, pp. 2415-2435
-
-
Lee, S.1
Wysk, R.A.2
Smith, J.S.3
-
11
-
-
0041584101
-
A compact representation of alternative process plans/routing for FMS control activities
-
Mettala, E.G. and Joshi, S.B. (1993). "A compact representation of alternative process plans/routing for FMS control activities." Int'l Journal of Design and Mfg. (v3), pp91-104.
-
(1993)
Int'l Journal of Design and Mfg.
, vol.3
, pp. 91-104
-
-
Mettala, E.G.1
Joshi, S.B.2
-
12
-
-
0002436155
-
On-line simulation for real-time scheduling of manufacturing systems
-
Rogers, P. and Flanagan, M. (1991). "On-line simulation for real-time scheduling of manufacturing systems." Industrial Engg. (v23), pp37-40.
-
(1991)
Industrial Engg.
, vol.23
, pp. 37-40
-
-
Rogers, P.1
Flanagan, M.2
-
13
-
-
0027810775
-
Simulation for real-time decision making in manufacturing systems
-
Rogers, P. and Gordon, R.J. (1993). "Simulation for real-time decision making in manufacturing systems." Proc. of 1993 Winter Simulation Conf., pp866-874.
-
(1993)
Proc. of 1993 Winter Simulation Conf.
, pp. 866-874
-
-
Rogers, P.1
Gordon, R.J.2
-
16
-
-
0001450722
-
A shop floor controller class for computer-integrated manufacturing
-
Smith, J. and Joshi, S. (1995). "A shop floor controller class for computer-integrated manufacturing." Int'l Journal of Computer Integrated Mfg. (v8, n5), pp327-339.
-
(1995)
Int'l Journal of Computer Integrated Mfg.
, vol.8
, Issue.5
, pp. 327-339
-
-
Smith, J.1
Joshi, S.2
-
17
-
-
0028753156
-
Discrete event simulation for shop floor control
-
Smith, J.S.; Wysk, R.A.; Sturrok, D.T.; Ramaswamy, S.E.; Smith, G.D.; and Joshi, S.B. (1994). "Discrete event simulation for shop floor control." Proc. of 1994 Winter Simulation Conf., pp962-969.
-
(1994)
Proc. of 1994 Winter Simulation Conf.
, pp. 962-969
-
-
Smith, J.S.1
Wysk, R.A.2
Sturrok, D.T.3
Ramaswamy, S.E.4
Smith, G.D.5
Joshi, S.B.6
-
18
-
-
0001225037
-
A multi-pass simulation-based, real-time scheduling and shop floor control system
-
Son, Y.; Rodriguez-Rivera, H.; and Wysk, R.A. (1999). "A multi-pass simulation-based, real-time scheduling and shop floor control system." Trans. of the Society for Computer Simulation Int'l (v16, n4), pp159-172.
-
(1999)
Trans. of the Society for Computer Simulation Int'l
, vol.16
, Issue.4
, pp. 159-172
-
-
Son, Y.1
Rodriguez-Rivera, H.2
Wysk, R.A.3
-
19
-
-
0035396337
-
Automatic simulation model generation for simulation-based, real-time shop floor control
-
Son, Y. and Wysk, R.A. (2001). "Automatic simulation model generation for simulation-based, real-time shop floor control." Computers in Industry (v45, n3), pp291-308.
-
(2001)
Computers in Industry
, vol.45
, Issue.3
-
-
Son, Y.1
Wysk, R.A.2
-
20
-
-
0037236081
-
Simulation based shop floor control: Formal model, model generation, and control interface
-
Son, Y.; Wysk, R.A.; and Jones, A.T. (2003). "Simulation based shop floor control: Formal model, model generation, and control interface." IIE Trans. on Design and Mfg. (v35, n1), pp29-48.
-
(2003)
IIE Trans. on Design and Mfg.
, vol.35
, Issue.1
, pp. 29-48
-
-
Son, Y.1
Wysk, R.A.2
Jones, A.T.3
-
21
-
-
0039896159
-
Resource modeling for the integration of the manufacturing enterprise
-
Steele, J.; Son, Y.; and Wysk, R.A. (2001). "Resource modeling for the integration of the manufacturing enterprise." Journal of Manufacturing Systems (v19, n6), pp407-427.
-
(2001)
Journal of Manufacturing Systems
, vol.19
, Issue.6
, pp. 407-427
-
-
Steele, J.1
Son, Y.2
Wysk, R.A.3
-
22
-
-
0029473488
-
Simulation for evaluating machine and AGV scheduling rules in an FMS environment
-
Tunali, S. (1995). "Simulation for evaluating machine and AGV scheduling rules in an FMS environment." Engg. Mgmt. Conf., pp433-438.
-
(1995)
Engg. Mgmt. Conf.
, pp. 433-438
-
-
Tunali, S.1
-
23
-
-
0024731596
-
An application of discrete-event simulation to on-line control and scheduling in flexible manufacturing
-
Wu, S.D. and Wysk, R.A. (1989). "An application of discrete-event simulation to on-line control and scheduling in flexible manufacturing." Int'l Journal of Production Research (v27, n9), pp1603-1623.
-
(1989)
Int'l Journal of Production Research
, vol.27
, Issue.9
, pp. 1603-1623
-
-
Wu, S.D.1
Wysk, R.A.2
-
24
-
-
0012551953
-
Rapid prototyping of shop floor control systems for computer integrated manufacturing
-
Wysk, R.; Joshi, S.B.; and Pegden, C.D. (1992). "Rapid prototyping of shop floor control systems for computer integrated manufacturing." ARPA project #8881.
-
(1992)
ARPA Project #8881
-
-
Wysk, R.1
Joshi, S.B.2
Pegden, C.D.3
-
25
-
-
0003150423
-
A formal process planning schema for shop floor control
-
Wysk, R.A.; Peters, B.A.; and Smith, J.S. (1994). "A formal process planning schema for shop floor control." Engg. Design and Automation Journal (v1, n1), pp3-19.
-
(1994)
Engg. Design and Automation Journal
, vol.1
, Issue.1
, pp. 3-19
-
-
Wysk, R.A.1
Peters, B.A.2
Smith, J.S.3
|