Due-date performance improvement using TOC's aggregated time buffer method at a wafer fabrication factory

Author keywords

Aggregated time buffer; Due date control; On time delivery; Theory of constraints; Wafer fabrication

Indexed keywords

PROJECT MANAGEMENT;

EID: 56349099276     PISSN: 09574174     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.eswa.2007.12.038     Document Type: Article
Times cited : (36)

References (27)
  • 1
    • 0001507294 scopus 로고
    • Batching and scheduling jobs on batch and discrete processors
    • Ahmadi J.H., Ahmadi R.H., Dasu S., and Tang C.S. Batching and scheduling jobs on batch and discrete processors. Operations Research 40 (1992) 70-763
    • (1992) Operations Research , vol.40 , pp. 70-763
    • Ahmadi, J.H.1    Ahmadi, R.H.2    Dasu, S.3    Tang, C.S.4
  • 3
    • 0030270581 scopus 로고    scopus 로고
    • A study of due-date assignment rules with constrained tightness in a dynamic job shop
    • Chang F.C.R. A study of due-date assignment rules with constrained tightness in a dynamic job shop. Computers & Industrial Engineering 31 1/2 (1996) 205-208
    • (1996) Computers & Industrial Engineering , vol.31 , Issue.1-2 , pp. 205-208
    • Chang, F.C.R.1
  • 4
    • 0024303531 scopus 로고
    • Survey of scheduling research involving due date determining decisions
    • Chen T.C.E., and Gupta M.C. Survey of scheduling research involving due date determining decisions. European Journal of Operational Research 38 (1989) 156-166
    • (1989) European Journal of Operational Research , vol.38 , pp. 156-166
    • Chen, T.C.E.1    Gupta, M.C.2
  • 6
    • 0027657253 scopus 로고
    • Job shop flow time prediction and tardiness control using queuing analysis
    • Enns S.T. Job shop flow time prediction and tardiness control using queuing analysis. International Journal of Production Research 31 9 (1993) 2045-2057
    • (1993) International Journal of Production Research , vol.31 , Issue.9 , pp. 2045-2057
    • Enns, S.T.1
  • 9
    • 0027642739 scopus 로고
    • Selecting allowance policies for improved job shop performance
    • Gee E.S., and Smith C.H. Selecting allowance policies for improved job shop performance. International Journal of Production Research 31 (1993) 1839-1852
    • (1993) International Journal of Production Research , vol.31 , pp. 1839-1852
    • Gee, E.S.1    Smith, C.H.2
  • 11
    • 0003926816 scopus 로고    scopus 로고
    • The North River Press, Great Barrington, MA
    • Goldratt E.M. Critical chain (1997), The North River Press, Great Barrington, MA
    • (1997) Critical chain
    • Goldratt, E.M.1
  • 12
    • 0037118177 scopus 로고    scopus 로고
    • A survey of the state-of-the-art of common due date assignment and scheduling research
    • Gordon V., Proth J.-M., and Chu C. A survey of the state-of-the-art of common due date assignment and scheduling research. European Journal of Operational Research 139 1 (2002) 1-25
    • (2002) European Journal of Operational Research , vol.139 , Issue.1 , pp. 1-25
    • Gordon, V.1    Proth, J.-M.2    Chu, C.3
  • 13
    • 0027850894 scopus 로고
    • A probabilistic cost-based due date assignment model for job shops
    • Kaplan A.C., and Urnal A.T. A probabilistic cost-based due date assignment model for job shops. International Journal of Production Research 31 12 (1993) 2817-2834
    • (1993) International Journal of Production Research , vol.31 , Issue.12 , pp. 2817-2834
    • Kaplan, A.C.1    Urnal, A.T.2
  • 15
    • 0026369803 scopus 로고
    • Distributed scheduling based on due dates and buffer priorities
    • Lu S.H., and Kumar P.R. Distributed scheduling based on due dates and buffer priorities. IEEE Transactions on Automatic Control 36 (1994) 1406-1416
    • (1994) IEEE Transactions on Automatic Control , vol.36 , pp. 1406-1416
    • Lu, S.H.1    Kumar, P.R.2
  • 16
    • 0028452709 scopus 로고
    • Rolling horizon algorithms for a single-machine dynamic scheduling problem with sequence-dependent setup times
    • Ovacik I.M., and Uzsoy R. Rolling horizon algorithms for a single-machine dynamic scheduling problem with sequence-dependent setup times. International Journal of Production Research 32 (1994) 1243-1263
    • (1994) International Journal of Production Research , vol.32 , pp. 1243-1263
    • Ovacik, I.M.1    Uzsoy, R.2
  • 18
    • 0001385963 scopus 로고
    • Regression-based due date assignment rules for improved assembly shop performance
    • Smith C.H., Minor E.D., and Wen H.J. Regression-based due date assignment rules for improved assembly shop performance. International Journal of Production Research 33 9 (1995) 2375-2385
    • (1995) International Journal of Production Research , vol.33 , Issue.9 , pp. 2375-2385
    • Smith, C.H.1    Minor, E.D.2    Wen, H.J.3
  • 19
    • 0020500356 scopus 로고
    • Due date selection procedures for job-shop simulation
    • Smith M.L., and Seidman A. Due date selection procedures for job-shop simulation. Computers & Industrial Engineering 7 3 (1983) 199-207
    • (1983) Computers & Industrial Engineering , vol.7 , Issue.3 , pp. 199-207
    • Smith, M.L.1    Seidman, A.2
  • 21
    • 0035426806 scopus 로고    scopus 로고
    • A investigation into the fundamentals of critical chain project scheduling
    • Steyn H. A investigation into the fundamentals of critical chain project scheduling. International Journal of Project Management 19 (2000) 363-369
    • (2000) International Journal of Project Management , vol.19 , pp. 363-369
    • Steyn, H.1
  • 25
    • 0018454859 scopus 로고
    • A simulation study of predictable due-dates
    • Weeks J.K. A simulation study of predictable due-dates. Management Science 25 4 (1979) 363-373
    • (1979) Management Science , vol.25 , Issue.4 , pp. 363-373
    • Weeks, J.K.1
  • 27
    • 0036568674 scopus 로고    scopus 로고
    • Integrating supply chain and critical chain concepts in engineer-procure-construct (EPC) projects
    • Yeo K.T., and Ning J.H. Integrating supply chain and critical chain concepts in engineer-procure-construct (EPC) projects. International Journal of Project Management 20 (2002) 253-262
    • (2002) International Journal of Project Management , vol.20 , pp. 253-262
    • Yeo, K.T.1    Ning, J.H.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.