메뉴 건너뛰기




Volumn 34, Issue 2-4, 1998, Pages 297-307

Job shop scheduling for missed due-date performance

Author keywords

[No Author keywords available]

Indexed keywords

COMPUTER AIDED MANUFACTURING; COMPUTER SIMULATION; DATA REDUCTION; DECISION THEORY; MATHEMATICAL MODELS; SCHEDULING;

EID: 0032041372     PISSN: 03608352     EISSN: None     Source Type: Journal    
DOI: 10.1016/s0360-8352(97)00317-3     Document Type: Article
Times cited : (46)

References (24)
  • 3
    • 0021496929 scopus 로고
    • Sequencing rules and due-date assignment in a job shop
    • Baker, K. R., Sequencing rules and due-date assignment in a job shop. Management Science, 30(9), 1984, 1093-1104.
    • (1984) Management Science , vol.30 , Issue.9 , pp. 1093-1104
    • Baker, K.R.1
  • 4
    • 0002009274 scopus 로고
    • A dynamic priority rule for scheduling against due date
    • Baker, K. R. and Bertrand, J. W., A dynamic priority rule for scheduling against due date. Journal of Operations Management, 3(1), 1982, 37-42.
    • (1982) Journal of Operations Management , vol.3 , Issue.1 , pp. 37-42
    • Baker, K.R.1    Bertrand, J.W.2
  • 5
    • 0002563758 scopus 로고
    • Job shop scheduling with modified due dates
    • Baker, K. R. and Kanet, J. J., Job shop scheduling with modified due dates. Journal of Operations Management, 4(1), 1983, 11-22.
    • (1983) Journal of Operations Management , vol.4 , Issue.1 , pp. 11-22
    • Baker, K.R.1    Kanet, J.J.2
  • 6
    • 0016564279 scopus 로고
    • Critical ratio scheduling: An experimental analysis
    • Berry, W. L and Rao, V., Critical ratio scheduling: an experimental analysis. Management Sciences, 22(2), 1975, 192-201.
    • (1975) Management Sciences , vol.22 , Issue.2 , pp. 192-201
    • Berry, W.L.1    Rao, V.2
  • 7
    • 0020664019 scopus 로고
    • Time completion for various dispatching rules in job shops
    • Elvers, D. A. and Taube, L. R., Time completion for various dispatching rules in job shops. OMEGA, 11(1), 1983, 81-89.
    • (1983) OMEGA , vol.11 , Issue.1 , pp. 81-89
    • Elvers, D.A.1    Taube, L.R.2
  • 8
    • 0012298197 scopus 로고
    • Priority dispatching with operation due dates in a job shop
    • Kanet, J. J. and Hayya, J. C., Priority dispatching with operation due dates in a job shop. Journal of Operations Management, 2(3), 1982, 167-175.
    • (1982) Journal of Operations Management , vol.2 , Issue.3 , pp. 167-175
    • Kanet, J.J.1    Hayya, J.C.2
  • 9
    • 0001870328 scopus 로고
    • A simulation analysis of due date assignment rules
    • Ragatz, G. L. and Mabert, A., A simulation analysis of due date assignment rules. Journal of Operations Management, 5(1), 1984, 27-39.
    • (1984) Journal of Operations Management , vol.5 , Issue.1 , pp. 27-39
    • Ragatz, G.L.1    Mabert, A.2
  • 12
    • 0027642739 scopus 로고
    • Selecting allowance policies for improved job shop performance
    • Gee, E. S. and Smith, C. H., Selecting allowance policies for improved job shop performance. International Journal of Production Research, 31(8), 1993, 1839-1852.
    • (1993) International Journal of Production Research , vol.31 , Issue.8 , pp. 1839-1852
    • Gee, E.S.1    Smith, C.H.2
  • 13
    • 0027540852 scopus 로고
    • An investigation of due-date assignment using workload information of a dynamic shop
    • Udo, G., An investigation of due-date assignment using workload information of a dynamic shop. International Journal of Production Economics, 29(1), 1993, 89-101.
    • (1993) International Journal of Production Economics , vol.29 , Issue.1 , pp. 89-101
    • Udo, G.1
  • 14
    • 0018454859 scopus 로고
    • A simulation study of predictable due-dates
    • Weeks, J. K., A simulation study of predictable due-dates. Management Science, 25(4), 1979, 363-373.
    • (1979) Management Science , vol.25 , Issue.4 , pp. 363-373
    • Weeks, J.K.1
  • 15
    • 0027657253 scopus 로고
    • Jobshop flowtime prediction and tardiness control using queuing analysis
    • Enns, S. T., Jobshop flowtime prediction and tardiness control using queuing analysis. International Journal of Production Research, 31, 1993, 2045-2057.
    • (1993) International Journal of Production Research , vol.31 , pp. 2045-2057
    • Enns, S.T.1
  • 16
    • 0000538802 scopus 로고
    • Job shop leadtime requirements under conditions of controlled delivery performance
    • Enns, S. T., Job shop leadtime requirements under conditions of controlled delivery performance. European Journal of Operational Research, 77(3), 1994, 429-439.
    • (1994) European Journal of Operational Research , vol.77 , Issue.3 , pp. 429-439
    • Enns, S.T.1
  • 17
    • 0001153814 scopus 로고
    • A dynamic forecasting model for job shop flowtime prediction and tardiness control
    • Enns, S. T., A dynamic forecasting model for job shop flowtime prediction and tardiness control. International Journal of Production Research, 33(5), 1995, 1295-1312.
    • (1995) International Journal of Production Research , vol.33 , Issue.5 , pp. 1295-1312
    • Enns, S.T.1
  • 19


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.