-
2
-
-
0021496929
-
Sequencing rules and due-date assignment in a job shop
-
Baker, K.R., 1984. Sequencing rules and due-date assignment in a job shop. Management Science, 30, 1093-1104.
-
(1984)
Management Science
, vol.30
, pp. 1093-1104
-
-
Baker, K.R.1
-
4
-
-
0028730645
-
A study of factors affecting due date predictability in a simulated dynamic job shop
-
Chang, F.C.R., 1994. A study of factors affecting due date predictability in a simulated dynamic job shop. Journal of Manufacturing Systems, 13 (6), 393-400.
-
(1994)
Journal of Manufacturing Systems
, vol.13
, Issue.6
, pp. 393-400
-
-
Chang, F.C.R.1
-
5
-
-
0031098116
-
Heuristics for dynamic job shop scheduling with real-time updated queueing time estimates
-
Chang, F.C.R., 1997. Heuristics for dynamic job shop scheduling with real-time updated queueing time estimates. International Journal of Production Research, 35 (3), 651-665.
-
(1997)
International Journal of Production Research
, vol.35
, Issue.3
, pp. 651-665
-
-
Chang, F.C.R.1
-
6
-
-
0024303531
-
Survey of scheduling research involving due date determination decisions
-
Cheng, T.C.E. and Gupta, M.C., 1989. Survey of scheduling research involving due date determination decisions. European Journal of Operations Research, 38, 156-166.
-
(1989)
European Journal of Operations Research
, vol.38
, pp. 156-166
-
-
Cheng, T.C.E.1
Gupta, M.C.2
-
7
-
-
0032041372
-
Job shop scheduling for missed due dates performance
-
Cheng, T.C.E. and Jiang, J., 1998. Job shop scheduling for missed due dates performance. Computers and Industrial Engineering, 34 (2), 297-307.
-
(1998)
Computers and Industrial Engineering
, vol.34
, Issue.2
, pp. 297-307
-
-
Cheng, T.C.E.1
Jiang, J.2
-
8
-
-
34249341750
-
Using dispatching rules for job shop scheduling with due date-based objectives
-
Chiang, T.C. and Fu, L.C., 2007. Using dispatching rules for job shop scheduling with due date-based objectives. International Journal of Production Research, 45 (14), 3245-3262.
-
(2007)
International Journal of Production Research
, vol.45
, Issue.14
, pp. 3245-3262
-
-
Chiang, T.C.1
Fu, L.C.2
-
9
-
-
0027657253
-
Job shop flow time prediction and tardiness control using queueing analysis
-
Enns, S.T., 1993. Job shop flow time prediction and tardiness control using queueing analysis. International Journal of Production Research, 31 (9), 2045-2057.
-
(1993)
International Journal of Production Research
, vol.31
, Issue.9
, pp. 2045-2057
-
-
Enns, S.T.1
-
10
-
-
0001153814
-
A dynamic forecasting model for job flow time prediction and tardiness control
-
Enns, S.T., 1995. A dynamic forecasting model for job flow time prediction and tardiness control. International Journal of Production Research, 33 (5), 1295-1312.
-
(1995)
International Journal of Production Research
, vol.33
, Issue.5
, pp. 1295-1312
-
-
Enns, S.T.1
-
11
-
-
0027642739
-
Selecting allowance policies for improved job shop performance
-
Gee, E.S. and Smith, C.H., 1993. Selecting allowance policies for improved job shop performance. International Journal of Production Research, 31, 1839-2852.
-
(1993)
International Journal of Production Research
, vol.31
, pp. 1839-2852
-
-
Gee, E.S.1
Smith, C.H.2
-
12
-
-
1942472554
-
Due date assignment using artificial neural networks under different shop floor control strategies
-
Hsu, S.Y. and Sha, D.Y., 2004. Due date assignment using artificial neural networks under different shop floor control strategies. International Journal of Production Research, 42 (9), 1727-1745.
-
(2004)
International Journal of Production Research
, vol.42
, Issue.9
, pp. 1727-1745
-
-
Hsu, S.Y.1
Sha, D.Y.2
-
13
-
-
0038581751
-
Scheduling for on-time completion in job shops using feasibility function
-
Lengyel, A., Hatono, I., and Ueda, K., 2003. Scheduling for on-time completion in job shops using feasibility function. Computers & Industrial Engineering, 45, 215-229.
-
(2003)
Computers & Industrial Engineering
, vol.45
, pp. 215-229
-
-
Lengyel, A.1
Hatono, I.2
Ueda, K.3
-
14
-
-
3843121898
-
A case study in a dual resource constrained job shop
-
Liao, E.J. and Lin, H.T., 1998. A case study in a dual resource constrained job shop. International Journal of Production Research, 36 (11), 3095-3111.
-
(1998)
International Journal of Production Research
, vol.36
, Issue.11
, pp. 3095-3111
-
-
Liao, E.J.1
Lin, H.T.2
-
15
-
-
34248190308
-
Due-date assignment for wafer fabrication under demand variate environment
-
Pearn, W.L., Chung, S.H., and Lai, C.M., 2007. Due-date assignment for wafer fabrication under demand variate environment. IEEE Transact?ons on Semiconductor Manufacturing, 20 (2), 165-175.
-
(2007)
IEEE Transact?ons on Semiconductor Manufacturing
, vol.20
, Issue.2
, pp. 165-175
-
-
Pearn, W.L.1
Chung, S.H.2
Lai, C.M.3
-
16
-
-
84990604706
-
Using neural networks to determine internally-set due-date assignments for shop scheduling
-
Philipoom, P.R., Rees, L.P., and Wiegmann, L., 1994. Using neural networks to determine internally-set due-date assignments for shop scheduling. Decision Sciences, 25, 825-851.
-
(1994)
Decision Sciences
, vol.25
, pp. 825-851
-
-
Philipoom, P.R.1
Rees, L.P.2
Wiegmann, L.3
-
17
-
-
0031078573
-
Cost-based due-date assignment with the use of classical and neural-network approaches
-
Philipoom, P.R., Weigmann, L., and Rees, L.P., 1997. Cost-based due-date assignment with the use of classical and neural-network approaches. Naval Research Logistics, 44, 21-46.
-
(1997)
Naval Research Logistics
, vol.44
, pp. 21-46
-
-
Philipoom, P.R.1
Weigmann, L.2
Rees, L.P.3
-
18
-
-
0034630792
-
The choice of dispatching rules in a shop internally set due dates with quoted leadtime and tardiness costs
-
Philipoom, P.R., 2000. The choice of dispatching rules in a shop internally set due dates with quoted leadtime and tardiness costs. International Journal of Production Research, 38 (7), 1641-1655.
-
(2000)
International Journal of Production Research
, vol.38
, Issue.7
, pp. 1641-1655
-
-
Philipoom, P.R.1
-
19
-
-
0000482128
-
Due date setting methodologies based on simulated annealing-an experimental study in a real life job shop
-
Raghu, T.T. and Rajendran, C., 1995. Due date setting methodologies based on simulated annealing-an experimental study in a real life job shop. International Journal of Production Research, 33 (9), 2535-2554.
-
(1995)
International Journal of Production Research
, vol.33
, Issue.9
, pp. 2535-2554
-
-
Raghu, T.T.1
Rajendran, C.2
-
20
-
-
29444438437
-
Dynamic job shop scheduling: A survey of simulation research
-
Ramasesh, R., 1990. Dynamic job shop scheduling: a survey of simulation research. Omega, 18, 43-57.
-
(1990)
Omega
, vol.18
, pp. 43-57
-
-
Ramasesh, R.1
-
21
-
-
0036889382
-
Operation-based flowtime estimation in a dynamic job shop
-
Sabuncuoglu, I. and Comlekci, A., 2002. Operation-based flowtime estimation in a dynamic job shop. Omega, 30, 423-442.
-
(2002)
Omega
, vol.30
, pp. 423-442
-
-
Sabuncuoglu, I.1
Comlekci, A.2
-
23
-
-
33751501444
-
Development of a regression-based method with case-based tuning to solve the due date assignment problem
-
Sha, D.Y., Strorch, R.L., and Liu, C.-H., 2007. Development of a regression-based method with case-based tuning to solve the due date assignment problem. International Journal of Production Research, 45 (1), 65-82.
-
(2007)
International Journal of Production Research
, vol.45
, Issue.1
, pp. 65-82
-
-
Sha, D.Y.1
Strorch, R.L.2
Liu, C.-H.3
-
24
-
-
0001385963
-
Regression based due date assignment rules for improved assembly shop performance
-
Smith, C.H., Minor, E.D., and Wen, H.J., 1995. Regression based due date assignment rules for improved assembly shop performance. International Journal of Production Research, 33 (9), 2375-2385.
-
(1995)
International Journal of Production Research
, vol.33
, Issue.9
, pp. 2375-2385
-
-
Smith, C.H.1
Minor, E.D.2
Wen, H.J.3
-
25
-
-
0031332607
-
Integrating order release control with due date assignment rules
-
Tsai, C.H., Chang, G.T., and Li, R.K., 1997. Integrating order release control with due date assignment rules. International Journal of Production Research, 35 (12), 3379-3392.
-
(1997)
International Journal of Production Research
, vol.35
, Issue.12
, pp. 3379-3392
-
-
Tsai, C.H.1
Chang, G.T.2
Li, R.K.3
-
26
-
-
0028725846
-
A simulation study of due date assignment rules in a dynamic job shop
-
Udo, G.J., 1994. A simulation study of due date assignment rules in a dynamic job shop. Journal of Operations Research Society, 45 (12), 1425-1435.
-
(1994)
Journal of Operations Research Society
, vol.45
, Issue.12
, pp. 1425-1435
-
-
Udo, G.J.1
-
27
-
-
0035479473
-
Computer simulation of due-date setting in multi-machine job shops
-
Veral, E.A., 2001. Computer simulation of due-date setting in multi-machine job shops. Computers & Industrial Engineering, 41, 77-94.
-
(2001)
Computers & Industrial Engineering
, vol.41
, pp. 77-94
-
-
Veral, E.A.1
-
28
-
-
0026186620
-
Dynamic rules for due date assignment
-
Vig, M.M. and Dooley, K.J., 1991. Dynamic rules for due date assignment. International Journal of Production Research, 29 (7), 1361-1377.
-
(1991)
International Journal of Production Research
, vol.29
, Issue.7
, pp. 1361-1377
-
-
Vig, M.M.1
Dooley, K.J.2
-
29
-
-
0016984996
-
A simulation study of operating policies in a hypothetical dual-constrained job shop
-
Weeks, J.K. and Fryer, J.S., 1976. A simulation study of operating policies in a hypothetical dual-constrained job shop. Management Science, 22, 1362-1371.
-
(1976)
Management Science
, vol.22
, pp. 1362-1371
-
-
Weeks, J.K.1
Fryer, J.S.2
-
30
-
-
0017478424
-
A methodology for assigning minimum cost due-dates
-
Weeks, J.K. and Fryer, J.S., 1977. A methodology for assigning minimum cost due-dates. Management Science, 23 (8), 872-881.
-
(1977)
Management Science
, vol.23
, Issue.8
, pp. 872-881
-
-
Weeks, J.K.1
Fryer, J.S.2
-
31
-
-
0018454859
-
A simulation study of predictable due-dates
-
Weeks, J.K., 1979. A simulation study of predictable due-dates. Management Science, 25 (4), 363-373.
-
(1979)
Management Science
, vol.25
, Issue.4
, pp. 363-373
-
-
Weeks, J.K.1
|