-
1
-
-
0021496929
-
Sequencing rules and due-date assignment in a job shop
-
Baker KR (1984) Sequencing rules and due-date assignment in a job shop. Manage Sci 30(9): 1093-1104
-
(1984)
Manage Sci
, vol.30
, Issue.9
, pp. 1093-1104
-
-
Baker, K.R.1
-
2
-
-
0019582153
-
A comparison of due-date selection rules
-
Baker KR, Bertrand JWM (1981) A comparison of due-date selection rules. AIIE Trans 13(2):123-131
-
(1981)
AIIE Trans
, vol.13
, Issue.2
, pp. 123-131
-
-
Baker, K.R.1
Bertrand, J.W.M.2
-
3
-
-
0028730645
-
A study of factors affecting due-date predictability in a simulated dynamic job shop
-
Chang F-CR (1994) A study of factors affecting due-date predictability in a simulated dynamic job shop. J Manuf Syst 13(6):393-400
-
(1994)
J Manuf Syst
, vol.13
, Issue.6
, pp. 393-400
-
-
Chang, F.-C.R.1
-
4
-
-
0021428249
-
Optimal due-date determination and sequencing of n jobs on a single machine
-
Cheng TCE (1984) Optimal due-date determination and sequencing of n jobs on a single machine. J Oper Res Soc 35(5):433-437
-
(1984)
J Oper Res Soc
, vol.35
, Issue.5
, pp. 433-437
-
-
Cheng, T.C.E.1
-
5
-
-
0023562059
-
Optimal total-work-content-power due-date determination and sequencing
-
Cheng TCE (1988) Optimal total-work-content-power due-date determination and sequencing. Comput Math Appl 14(8):579-582
-
(1988)
Comput Math Appl
, vol.14
, Issue.8
, pp. 579-582
-
-
Cheng, T.C.E.1
-
6
-
-
0032041372
-
Job shop scheduling for missed due-date performance
-
Cheng TCE, Jiang J (1998) Job shop scheduling for missed due-date performance. Comput Ind Eng 34(2):297-307
-
(1998)
Comput Ind Eng
, vol.34
, Issue.2
, pp. 297-307
-
-
Cheng, T.C.E.1
Jiang, J.2
-
7
-
-
0011773018
-
On anomalies in dynamic ratio type scheduling rules: A clarifying analysis
-
Kanet JJ (1982) On anomalies in dynamic ratio type scheduling rules: a clarifying analysis. Manage Sci 28(11):1337-1341
-
(1982)
Manage Sci
, vol.28
, Issue.11
, pp. 1337-1341
-
-
Kanet, J.J.1
-
8
-
-
0036889382
-
Operation-based flowtime estimation in a dynamic job shop
-
Sabuncuoglu I, Comlekci A (2002) Operation-based flowtime estimation in a dynamic job shop. Omega - Int J Manage Sci 30(6):423-442
-
(2002)
Omega - Int J Manage Sci
, vol.30
, Issue.6
, pp. 423-442
-
-
Sabuncuoglu, I.1
Comlekci, A.2
-
11
-
-
0002433547
-
From data mining to knowledge discovery: An overview
-
MIT Press, Cambridge
-
Fayyad UM, Piatetsky-Shapiro G, Smyth P (1996) From data mining to knowledge discovery: an overview. In: Advances in Knowledge Discovery & Data Mining, MIT Press, Cambridge, pp 1-34
-
(1996)
Advances in Knowledge Discovery & Data Mining
, pp. 1-34
-
-
Fayyad, U.M.1
Piatetsky-Shapiro, G.2
Smyth, P.3
-
12
-
-
84901397751
-
Mining multiple comprehensible classification rules using genetic programming
-
Piscataway, NJ, USA
-
Tan KC, Tay A, Lee TH, Heng CM (2002) Mining multiple comprehensible classification rules using genetic programming. In: Proceedings of the 2002 Congress on Evolutionary Computation, Piscataway, NJ, USA, pp 1302-1307
-
(2002)
Proceedings of the 2002 Congress on Evolutionary Computation
, pp. 1302-1307
-
-
Tan, K.C.1
Tay, A.2
Lee, T.H.3
Heng, C.M.4
-
13
-
-
0033676160
-
Classification of epidemiological data: A comparison of genetic algorithm and decision tree approaches
-
Piscataway, NJ, USA
-
Congdon CB (2000) Classification of epidemiological data: a comparison of genetic algorithm and decision tree approaches. In: Proceedings of the 2000 Congress on Evolutionary Computation, Piscataway, NJ, USA, pp 442-449
-
(2000)
Proceedings of the 2000 Congress on Evolutionary Computation
, pp. 442-449
-
-
Congdon, C.B.1
-
17
-
-
33744584654
-
Induction of decision trees
-
Quinlan JR (1986) Induction of decision trees. Mach Learn 1(1):81-106
-
(1986)
Mach Learn
, vol.1
, Issue.1
, pp. 81-106
-
-
Quinlan, J.R.1
-
18
-
-
0036474654
-
Data mining for improving a cleaning process in the semiconductor industry
-
Braha D, Shmilovici A (2002) Data mining for improving a cleaning process in the semiconductor industry. IEEE Trans Semiconductor Manuf 15(1):91-101
-
(2002)
IEEE Trans Semiconductor Manuf
, vol.15
, Issue.1
, pp. 91-101
-
-
Braha, D.1
Shmilovici, A.2
-
20
-
-
0027565391
-
Mixing static and dynamic estimates for due date assignment
-
Vig MM, Dooley KJ (1993) Mixing static and dynamic estimates for due date assignment. J Oper Manage 11(1):67-79
-
(1993)
J Oper Manage
, vol.11
, Issue.1
, pp. 67-79
-
-
Vig, M.M.1
Dooley, K.J.2
|