메뉴 건너뛰기




Volumn 187, Issue 1, 2008, Pages 31-45

New approaches to due date assignment in job shops

Author keywords

Due date assignment; Flowtime estimation; Simulation; Time series

Indexed keywords

COMPUTER SIMULATION; EMPLOYMENT; ERROR ANALYSIS; MATHEMATICAL MODELS; TIME SERIES ANALYSIS;

EID: 35848966779     PISSN: 03772217     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ejor.2007.02.020     Document Type: Article
Times cited : (59)

References (35)
  • 2
    • 0012245221 scopus 로고
    • The effects of input control in a simple scheduling model
    • Baker K.R. The effects of input control in a simple scheduling model. Journal of Operations Management 4 2 (1984) 99-112
    • (1984) Journal of Operations Management , vol.4 , Issue.2 , pp. 99-112
    • Baker, K.R.1
  • 3
    • 0021496929 scopus 로고
    • Sequencing rules and due date assignments in a job shop
    • Baker K.R. Sequencing rules and due date assignments in a job shop. Management Science 30 9 (1984) 1093-1104
    • (1984) Management Science , vol.30 , Issue.9 , pp. 1093-1104
    • Baker, K.R.1
  • 4
    • 0003067640 scopus 로고
    • An investigation of due date assignment rules with constrained tightness
    • Baker K.R., and Bertrand J.M.W. An investigation of due date assignment rules with constrained tightness. Operation Management 1 3 (1981) 109-120
    • (1981) Operation Management , vol.1 , Issue.3 , pp. 109-120
    • Baker, K.R.1    Bertrand, J.M.W.2
  • 5
    • 0002009274 scopus 로고
    • A dynamic priority rule for sequencing against due dates
    • Baker K.R., and Bertrand J.M.W. A dynamic priority rule for sequencing against due dates. Operation Management 1 3 (1982) 37-42
    • (1982) Operation Management , vol.1 , Issue.3 , pp. 37-42
    • Baker, K.R.1    Bertrand, J.M.W.2
  • 6
    • 35848944664 scopus 로고    scopus 로고
    • Baykasoglu, A., Dereli, T., Göçken, M., 2005. Flow time estimation using data mining. In: ICAM'2005 International Conference on Agile Manufacturing, 27-28 July 2005, Helsinki, Finland, pp. 77-81.
  • 7
    • 0031098116 scopus 로고    scopus 로고
    • Heuristics for dynamic job shop scheduling with real-time updated queuing time estimates
    • Chang E.C.R. Heuristics for dynamic job shop scheduling with real-time updated queuing time estimates. International Journal of Production Research 35 (1997) 661-665
    • (1997) International Journal of Production Research , vol.35 , pp. 661-665
    • Chang, E.C.R.1
  • 8
    • 0023436606 scopus 로고
    • An algorithm for the CON due date determination and sequencing problem
    • Cheng T.C.E. An algorithm for the CON due date determination and sequencing problem. Computer and Operations Research 14 6 (1987) 537-542
    • (1987) Computer and Operations Research , vol.14 , Issue.6 , pp. 537-542
    • Cheng, T.C.E.1
  • 9
    • 0023983109 scopus 로고
    • Simulation study of job shop scheduling with due dates
    • Cheng T.C.E. Simulation study of job shop scheduling with due dates. International Journal of Systems Science 19 (1988) 383-390
    • (1988) International Journal of Systems Science , vol.19 , pp. 383-390
    • Cheng, T.C.E.1
  • 10
    • 0032041372 scopus 로고    scopus 로고
    • Job shop scheduling for missed due date performance
    • Cheng T.C.E., and Jiang J. Job shop scheduling for missed due date performance. Computes & Industrial Engineering 34 2 (1998) 297-307
    • (1998) Computes & Industrial Engineering , vol.34 , Issue.2 , pp. 297-307
    • Cheng, T.C.E.1    Jiang, J.2
  • 11
    • 0041732089 scopus 로고    scopus 로고
    • A case-based expert support system for due date assignment in a wafer fabrication factory
    • Chiu C., Chang P.C., and Chiu N.H. A case-based expert support system for due date assignment in a wafer fabrication factory. Journal of Intelligent Manufacturing 14 (2003) 287-329
    • (2003) Journal of Intelligent Manufacturing , vol.14 , pp. 287-329
    • Chiu, C.1    Chang, P.C.2    Chiu, N.H.3
  • 12
    • 0001173515 scopus 로고
    • Priority dispatching and work in process inventory on a job shop
    • Conway Y.R.W. Priority dispatching and work in process inventory on a job shop. Journal of Industrial Engineering 16 (1965) 123-130
    • (1965) Journal of Industrial Engineering , vol.16 , pp. 123-130
    • Conway, Y.R.W.1
  • 14
    • 0027657253 scopus 로고
    • Job shop flowtime prediction and tardiness control using queuing analysis
    • Enns S.T. Job shop flowtime prediction and tardiness control using queuing analysis. International Journal of Production Research 31 9 (1993) 2045-2057
    • (1993) International Journal of Production Research , vol.31 , Issue.9 , pp. 2045-2057
    • Enns, S.T.1
  • 15
    • 0001153814 scopus 로고
    • A dynamic forecasting model for job shop flowtime prediction and tardiness
    • Enns S.T. A dynamic forecasting model for job shop flowtime prediction and tardiness. International Journal of Production Research 33 5 (1995) 1295-1312
    • (1995) International Journal of Production Research , vol.33 , Issue.5 , pp. 1295-1312
    • Enns, S.T.1
  • 16
    • 0027642739 scopus 로고
    • Selecting allowance policies for improved job shop performance
    • Gee E.S., and Smith H. Selecting allowance policies for improved job shop performance. International Journal of Production Research 31 8 (1993) 1839-1852
    • (1993) International Journal of Production Research , vol.31 , Issue.8 , pp. 1839-1852
    • Gee, E.S.1    Smith, H.2
  • 17
    • 0000327811 scopus 로고
    • Alternative order release mechanisms: A comparison by simulation
    • Hendry L.C., and Wong S.K. Alternative order release mechanisms: A comparison by simulation. International Journal of Production Research 32 12 (1994) 2827-2842
    • (1994) International Journal of Production Research , vol.32 , Issue.12 , pp. 2827-2842
    • Hendry, L.C.1    Wong, S.K.2
  • 19
    • 3943054030 scopus 로고    scopus 로고
    • Minimizing earliness and tardiness penalties in a single-machine problem with a common due date
    • Hino C.M., Ronconi C.P., and Mendes A.B. Minimizing earliness and tardiness penalties in a single-machine problem with a common due date. European Journal of Operational Research 160 1 (2005) 190-201
    • (2005) European Journal of Operational Research , vol.160 , Issue.1 , pp. 190-201
    • Hino, C.M.1    Ronconi, C.P.2    Mendes, A.B.3
  • 23
    • 0000809619 scopus 로고
    • Load smoothing by the planning and order review/release systems: A simulation experiment
    • Melnyk S.A., Ragartz G.L., and Fredendall L. Load smoothing by the planning and order review/release systems: A simulation experiment. Journal of Operations Management 10 (1991) 512-523
    • (1991) Journal of Operations Management , vol.10 , pp. 512-523
    • Melnyk, S.A.1    Ragartz, G.L.2    Fredendall, L.3
  • 24
    • 0019540666 scopus 로고
    • Combined scheduling system for reducing job tardiness in a job shop
    • Miyazaki S. Combined scheduling system for reducing job tardiness in a job shop. International Journal of Production Research 19 (1981) 201-211
    • (1981) International Journal of Production Research , vol.19 , pp. 201-211
    • Miyazaki, S.1
  • 25
    • 0034630792 scopus 로고    scopus 로고
    • The choice of dispatching rules in a shop using internally set due dates with quoted lead time and tardiness costs
    • Philipoom P.R. The choice of dispatching rules in a shop using internally set due dates with quoted lead time and tardiness costs. International Journal of Production Research 38 7 (2000) 1641-1655
    • (2000) International Journal of Production Research , vol.38 , Issue.7 , pp. 1641-1655
    • Philipoom, P.R.1
  • 26
    • 84990604706 scopus 로고
    • Using neural networks to determine internally-set due-date assignments for shop scheduling
    • Philipoom P.R., Rees L.P., and Wiegmann L. Using neural networks to determine internally-set due-date assignments for shop scheduling. Decision Sciences 25 (1994) 825-851
    • (1994) Decision Sciences , vol.25 , pp. 825-851
    • Philipoom, P.R.1    Rees, L.P.2    Wiegmann, L.3
  • 28
    • 0001870328 scopus 로고
    • A simulation analysis of due date assignment rules
    • Ragartz G.L., and Mabert V.A. A simulation analysis of due date assignment rules. Journal of Operation Management 5 1 (1984) 27-39
    • (1984) Journal of Operation Management , vol.5 , Issue.1 , pp. 27-39
    • Ragartz, G.L.1    Mabert, V.A.2
  • 29
    • 0021468849 scopus 로고
    • Framework for the study of due date management in job shop
    • Ragartz G.L., and Mabert V.A. Framework for the study of due date management in job shop. Production and Research 22 4 (1984) 685-695
    • (1984) Production and Research , vol.22 , Issue.4 , pp. 685-695
    • Ragartz, G.L.1    Mabert, V.A.2
  • 30
    • 0000482128 scopus 로고
    • Due-date setting methodologies based on simulated annealing - An experimental study in a real-life job shop
    • Raghu T.S., and Rajendran C. Due-date setting methodologies based on simulated annealing - An experimental study in a real-life job shop. International Journal of Production Research 33 9 (1995) 2535-2554
    • (1995) International Journal of Production Research , vol.33 , Issue.9 , pp. 2535-2554
    • Raghu, T.S.1    Rajendran, C.2
  • 31
    • 0036889382 scopus 로고    scopus 로고
    • Operation based flow time estimation in a dynamic shop
    • Sabuncuoglu I., and Comlekci A. Operation based flow time estimation in a dynamic shop. Omega 30 6 (2002) 423-442
    • (2002) Omega , vol.30 , Issue.6 , pp. 423-442
    • Sabuncuoglu, I.1    Comlekci, A.2
  • 32
    • 18844442302 scopus 로고    scopus 로고
    • Sha, D.Y., Liu, C.H., 2004. Using data mining for due date assignment in a dynamic job shop environment. Advanced Manufacturing Technology. s00170-003-1937y.
  • 33
    • 0035479473 scopus 로고    scopus 로고
    • Computer simulation of due-date setting in multi-machine job shops
    • Veral E.A. Computer simulation of due-date setting in multi-machine job shops. Computes & Industrial Engineering 41 1 (2001) 77-94
    • (2001) Computes & Industrial Engineering , vol.41 , Issue.1 , pp. 77-94
    • Veral, E.A.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.