메뉴 건너뛰기




Volumn 168, Issue 3, 2006, Pages 826-837

Balancing assembly lines with tabu search

Author keywords

Assembly line balancing; Metaheuristic; Tabu search

Indexed keywords

ALGORITHMS; ASSEMBLY; COMPUTER SOFTWARE; CONVEYORS; COSTS; HEURISTIC METHODS; PROBLEM SOLVING; PRODUCTIVITY;

EID: 25144457210     PISSN: 03772217     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ejor.2004.07.031     Document Type: Conference Paper
Times cited : (154)

References (21)
  • 1
    • 0001188971 scopus 로고
    • Genetic algorithms for combinational optimization: The assembly line balancing probelm
    • E.J. Anderson, and M.C. Ferris Genetic algorithms for combinational optimization: The assembly line balancing probelm ORSA Journal on Computing 6 1994 161 173
    • (1994) ORSA Journal on Computing , vol.6 , pp. 161-173
    • Anderson, E.J.1    Ferris, M.C.2
  • 2
    • 40849130689 scopus 로고
    • COMSOAL: A computer method of sequencing operations for assembly lines
    • A.L. Arcus COMSOAL: A computer method of sequencing operations for assembly lines International Journal of Production Research 4 1966 259 277
    • (1966) International Journal of Production Research , vol.4 , pp. 259-277
    • Arcus, A.L.1
  • 5
    • 84945581431 scopus 로고    scopus 로고
    • Stochastic algorithms for the line balancing problem in automotive industry
    • IFAC'2002, Barcelona, Spain, 21-26 July
    • C. Boutevin, M. Gourgand, S. Norre, Stochastic algorithms for the line balancing problem in automotive industry, in: Proceedings on CD-ROM, IFAC'2002, Barcelona, Spain, 21-26 July 2002.
    • (2002) Proceedings on CD-ROM
    • Boutevin, C.1    Gourgand, M.2    Norre, S.3
  • 6
    • 0032361515 scopus 로고    scopus 로고
    • The application of a tabu search metaheuristic to the assembly line balancing problem
    • W.C. Chiang The application of a tabu search metaheuristic to the assembly line balancing problem Annals of Operations Research 1998 209 227
    • (1998) Annals of Operations Research , pp. 209-227
    • Chiang, W.C.1
  • 7
    • 0024641634 scopus 로고
    • A comprehensive literature review and analysis of the design, balancing and scheduling of assembly lines
    • S. Ghosh, and R.J. Gagnon A comprehensive literature review and analysis of the design, balancing and scheduling of assembly lines International Journal of Production Research 1989 637 670
    • (1989) International Journal of Production Research , pp. 637-670
    • Ghosh, S.1    Gagnon, R.J.2
  • 8
    • 0004215426 scopus 로고    scopus 로고
    • Kluwer Academic Publishers Boston
    • F. Glover, and M. Laguna Tabu Search 1997 Kluwer Academic Publishers Boston
    • (1997) Tabu Search
    • Glover, F.1    Laguna, M.2
  • 9
    • 0036845392 scopus 로고    scopus 로고
    • A hybrid genetic algorithm for assembly line balancing
    • J.F. Gonçalves, and J. Raimundo de Almeida A hybrid genetic algorithm for assembly line balancing Journal of Heuristics 8 2002 629 642
    • (2002) Journal of Heuristics , vol.8 , pp. 629-642
    • Gonçalves, J.F.1    De Almeida, J.R.2
  • 10
    • 0001474336 scopus 로고
    • An algorithm for the line balancing problem
    • A.L. Gutjahr, and G.L. Nemhauser An algorithm for the line balancing problem Management Science 11 1964 308 315
    • (1964) Management Science , vol.11 , pp. 308-315
    • Gutjahr, A.L.1    Nemhauser, G.L.2
  • 12
    • 0001636411 scopus 로고
    • An experimental investigation and comparative evaluation of production line balancing techniques
    • A.A. Master An experimental investigation and comparative evaluation of production line balancing techniques Management Science 16 1970 728 745
    • (1970) Management Science , vol.16 , pp. 728-745
    • Master, A.A.1
  • 13
    • 0031122267 scopus 로고    scopus 로고
    • Heuristic for an assembly line balancing problem with incompatibility, range, and partial precedence constraints
    • K. Park, S. Park, and W. Kim Heuristic for an assembly line balancing problem with incompatibility, range, and partial precedence constraints Computers & Industrial Engineering 32 1997 321 332
    • (1997) Computers & Industrial Engineering , vol.32 , pp. 321-332
    • Park, K.1    Park, S.2    Kim, W.3
  • 17
    • 0031543416 scopus 로고    scopus 로고
    • Simple assembly line balancing - Heuristic approaches
    • A. Scholl, and S. Voß Simple assembly line balancing - Heuristic approaches Journal of Heuristics 2 1996 217 244
    • (1996) Journal of Heuristics , vol.2 , pp. 217-244
    • Scholl, A.1    Voß, S.2
  • 18
    • 0001193704 scopus 로고    scopus 로고
    • SALOME: A bidirectional branch-and-bound procedure for assembly line balancing
    • A. Scholl, and R. Klein SALOME: A bidirectional branch-and-bound procedure for assembly line balancing INFORMS Journal on Computing 9 1997 319 334
    • (1997) INFORMS Journal on Computing , vol.9 , pp. 319-334
    • Scholl, A.1    Klein, R.2
  • 19
    • 0033115142 scopus 로고    scopus 로고
    • Balancing assembly lines effectively - A computational comparison
    • A. Scholl, and R. Klein Balancing assembly lines effectively - A computational comparison European Journal of Operational Research 114 1999 50 58
    • (1999) European Journal of Operational Research , vol.114 , pp. 50-58
    • Scholl, A.1    Klein, R.2
  • 20
    • 0347921332 scopus 로고    scopus 로고
    • Fondements et applications des methodes de recherche avec tabous
    • P. Soriano, and M. Gendreau Fondements et applications des methodes de recherche avec tabous RAIRO Recherche Opérationnelle 31 1997 133 159
    • (1997) RAIRO Recherche Opérationnelle , vol.31 , pp. 133-159
    • Soriano, P.1    Gendreau, M.2
  • 21
    • 0021202885 scopus 로고
    • An integer programming algorithm with network cuts for solving the assembly line balancing problem
    • F.B. Talbot, and J.H. Patterson An integer programming algorithm with network cuts for solving the assembly line balancing problem Management Science 30 1984 85 99
    • (1984) Management Science , vol.30 , pp. 85-99
    • Talbot, F.B.1    Patterson, J.H.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.