메뉴 건너뛰기




Volumn 44, Issue 1, 2006, Pages 27-42

Multi-objective assembly line balancing via a modified ant colony optimization technique

Author keywords

Ant colony optimization; Assembly line balancing; Efficient frontier; Heuristics

Indexed keywords

HEURISTIC METHODS; INFORMATION RETRIEVAL; OPTIMIZATION; PROBLEM SOLVING; PRODUCTION ENGINEERING;

EID: 29344438441     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207540500216748     Document Type: Article
Times cited : (82)

References (21)
  • 1
    • 0031270224 scopus 로고    scopus 로고
    • A parallel station heuristic for the mixed-model production linen balancing problem
    • Askin, R.G. and Zhou, M., A parallel station heuristic for the mixed-model production linen balancing problem. Int. J. Prod. Res., 1997, 35, 3095-3106.
    • (1997) Int. J. Prod. Res. , vol.35 , pp. 3095-3106
    • Askin, R.G.1    Zhou, M.2
  • 2
    • 20344408213 scopus 로고    scopus 로고
    • A survey on problems and methods in generalized assembly line balancing
    • in press
    • Becker, C. and Scholl, A., A survey on problems and methods in generalized assembly line balancing. Eur. J. Oper. Res., 2003 (in press).
    • (2003) Eur. J. Oper. Res.
    • Becker, C.1    Scholl, A.2
  • 4
    • 0037230929 scopus 로고    scopus 로고
    • A weighted approach for assembly line design with station paralleling and equipment selection
    • Bukchin, J. and Rubinovitz, J., A weighted approach for assembly line design with station paralleling and equipment selection. IIE Trans., 2002, 35, 73-85.
    • (2002) IIE Trans. , vol.35 , pp. 73-85
    • Bukchin, J.1    Rubinovitz, J.2
  • 5
    • 0016027179 scopus 로고
    • Assembly line balancing with multiple stations
    • Buxey, G.M., Assembly line balancing with multiple stations. Manag. Sci., 1974, 20, 1010-1021.
    • (1974) Manag. Sci. , vol.20 , pp. 1010-1021
    • Buxey, G.M.1
  • 6
    • 0030759617 scopus 로고    scopus 로고
    • Ant colonies for the travelling salesman problem
    • Dorigo, M. and Gambardella, L.M., Ant colonies for the travelling salesman problem. Biosystems, 1997, 43, 73-81.
    • (1997) Biosystems , vol.43 , pp. 73-81
    • Dorigo, M.1    Gambardella, L.M.2
  • 7
    • 0002703574 scopus 로고
    • Tabu search: A tutorial
    • Glover, F., Tabu search: a tutorial. Interfaces, 1990, 20, 74-94.
    • (1990) Interfaces , vol.20 , pp. 74-94
    • Glover, F.1
  • 8
    • 0030785015 scopus 로고    scopus 로고
    • A goal programming approach to the mixed-model assembly line balancing problem
    • Gocken, H. and Erel, E., A goal programming approach to the mixed-model assembly line balancing problem. Int. J. Prod. Econ., 1997, 48, 177-185.
    • (1997) Int. J. Prod. Econ. , vol.48 , pp. 177-185
    • Gocken, H.1    Erel, E.2
  • 9
    • 0032043473 scopus 로고    scopus 로고
    • Binary integer formulation for the mixed-model assembly line balancing problem
    • Gocken, H. and Erel, E., Binary integer formulation for the mixed-model assembly line balancing problem. Comput. Ind. Eng., 1998, 23, 451-461.
    • (1998) Comput. Ind. Eng. , vol.23 , pp. 451-461
    • Gocken, H.1    Erel, E.2
  • 11
    • 0037565737 scopus 로고
    • The balance delay problem
    • Kilbridge, M.D. and Wester, L., The balance delay problem. Manag. Sci., 1962, 8, 69-84.
    • (1962) Manag. Sci. , vol.8 , pp. 69-84
    • Kilbridge, M.D.1    Wester, L.2
  • 12
    • 26444479778 scopus 로고
    • Optimization by simulated annealing
    • Kirkpatrick, S., Gelatt, C.D. and Veechi, M.P., Optimization by simulated annealing. Science, 1983, 220(4598), 671-679.
    • (1983) Science , vol.220 , Issue.4598 , pp. 671-679
    • Kirkpatrick, S.1    Gelatt, C.D.2    Veechi, M.P.3
  • 13
    • 0032188659 scopus 로고    scopus 로고
    • Using simulated annealing to solve a multiobjective assembly line balancing problem with parallel workstations
    • McMullen, P.R. and Frazier, G.V., Using simulated annealing to solve a multiobjective assembly line balancing problem with parallel workstations. Int. J. Prod. Res., 1998, 36, 2717-2741.
    • (1998) Int. J. Prod. Res. , vol.36 , pp. 2717-2741
    • McMullen, P.R.1    Frazier, G.V.2
  • 14
    • 0038480082 scopus 로고    scopus 로고
    • Using ant techniques to solve the assembly line balancing problem
    • McMullen, P.R. and Tarasewich, P., Using ant techniques to solve the assembly line balancing problem. IIE Trans. Design Manuf., 2003, 35, 605-617.
    • (2003) IIE Trans. Design Manuf. , vol.35 , pp. 605-617
    • McMullen, P.R.1    Tarasewich, P.2
  • 15
    • 0032643432 scopus 로고    scopus 로고
    • Balancing and sequencing manual mixed model assembly lines
    • Merengo, C., Nava, F. and Pozzetti, A., Balancing and sequencing manual mixed model assembly lines. Int. J. Prod. Res., 1999, 37, 2835-2860.
    • (1999) Int. J. Prod. Res. , vol.37 , pp. 2835-2860
    • Merengo, C.1    Nava, F.2    Pozzetti, A.3
  • 17
    • 0033745068 scopus 로고    scopus 로고
    • A multi-objective genetic algorithm for solving assembly line balancing problem
    • Ponnambalam, S.G., Aravindan, P. and Mogileeswar Naidul, G., A multi-objective genetic algorithm for solving assembly line balancing problem. Int. J. Adv. Manuf. Tech., 2000, 16, 341-352.
    • (2000) Int. J. Adv. Manuf. Tech. , vol.16 , pp. 341-352
    • Ponnambalam, S.G.1    Aravindan, P.2    Mogileeswar Naidul, G.3
  • 19
    • 28944441230 scopus 로고    scopus 로고
    • State-of-the-art and heuristic solution procedures for simple assembly line balancing
    • in press
    • Scholl, A. and Becker, C., State-of-the-art and heuristic solution procedures for simple assembly line balancing. Eur. J. Oper. Res., 2003 (in press).
    • (2003) Eur. J. Oper. Res.
    • Scholl, A.1    Becker, C.2
  • 20
    • 0000671840 scopus 로고
    • Assembly line balancing using probabilistic combinations of heuristics
    • Tonge, F.M., Assembly line balancing using probabilistic combinations of heuristics. Manag. Sci., 1965, 11, 727-735.
    • (1965) Manag. Sci. , vol.11 , pp. 727-735
    • Tonge, F.M.1
  • 21
    • 0037091985 scopus 로고    scopus 로고
    • A two-stage method for balancing mixed-model assembly lines with parallel workstations
    • Vilarinho, P.M. and Simaria, A.S., A two-stage method for balancing mixed-model assembly lines with parallel workstations. Int. J. Prod. Res., 2002, 40, 1405-1420.
    • (2002) Int. J. Prod. Res. , vol.40 , pp. 1405-1420
    • Vilarinho, P.M.1    Simaria, A.S.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.