메뉴 건너뛰기




Volumn 16, Issue 1, 2004, Pages 39-55

A branch-and-cut approach for a generic multiple-product, assembly-system design problem

Author keywords

Flexible manufacturing line balancing; Production scheduling; Programming: integer, cutting planes

Indexed keywords

ASSEMBLY; EMBEDDED SYSTEMS; FLEXIBLE MANUFACTURING SYSTEMS; INTEGER PROGRAMMING; PROBLEM SOLVING; PRODUCTION ENGINEERING; SCHEDULING;

EID: 3843151430     PISSN: 10919856     EISSN: 15265528     Source Type: Journal    
DOI: 10.1287/ijoc.1020.0025     Document Type: Article
Times cited : (16)

References (34)
  • 1
    • 34250114086 scopus 로고
    • A large scale machine loading problem in flexible assembly
    • Aminons, J. C., C. B. Lofgren, L. F. McGinnis. 1985. A large scale machine loading problem in flexible assembly. Ann. Oper. Res. 3 319-332.
    • (1985) Ann. Oper. Res. , vol.3 , pp. 319-332
    • Aminons, J.C.1    Lofgren, C.B.2    McGinnis, L.F.3
  • 2
    • 0018443318 scopus 로고
    • An optimal procedure for the single model deterministic assembly line balancing problems
    • Assche, E V., W. S. Herroelen. 1979. An optimal procedure for the single model deterministic assembly line balancing problems. Eur. J. Oper. Res. 3 142-149.
    • (1979) Eur. J. Oper. Res. , vol.3 , pp. 142-149
    • Assche, E.V.1    Herroelen, W.S.2
  • 3
    • 0022768294 scopus 로고
    • A survey of exact algorithms for the assembly line balancing problem
    • Baybars, I. 1986. A survey of exact algorithms for the assembly line balancing problem. Management Sci. 32 909-932.
    • (1986) Management Sci. , vol.32 , pp. 909-932
    • Baybars, I.1
  • 5
    • 0344193908 scopus 로고
    • Integration of assembly robots in a flexible assembly system
    • A. Kusiak, ed. Elsevier, Amsterdam, The Netherlands
    • Chakravarty, A. K., A. Shrub. 1986. Integration of assembly robots in a flexible assembly system. A. Kusiak, ed. Flexible Manufacturing Systems: Methods and Studies. Elsevier, Amsterdam, The Netherlands, 71-88.
    • (1986) Flexible Manufacturing Systems: Methods and Studies , pp. 71-88
    • Chakravarty, A.K.1    Shrub, A.2
  • 6
    • 0028728185 scopus 로고
    • Analyzing and exploiting the structure of the constraints in the ILP approach to the scheduling problem
    • Chaudhuri, S., R. A. Walker, J. Mitchell. 1994. Analyzing and exploiting the structure of the constraints in the ILP approach to the scheduling problem. IEEE Trans. VLSI Systems 2 456-471.
    • (1994) IEEE Trans. VLSI Systems , vol.2 , pp. 456-471
    • Chaudhuri, S.1    Walker, R.A.2    Mitchell, J.3
  • 7
    • 84877069114 scopus 로고
    • Automated assembly of complex airframe structures
    • International Society of Allied Weight Engineers, Inc., Los Angeles, CA
    • Donohue, P. J., G. J. Fisher, R. J. Stauffer. 1991. Automated assembly of complex airframe structures. SAWE Paper 1981. International Society of Allied Weight Engineers, Inc., Los Angeles, CA.
    • (1991) SAWE Paper 1981
    • Donohue, P.J.1    Fisher, G.J.2    Stauffer, R.J.3
  • 8
    • 0034690556 scopus 로고    scopus 로고
    • A cutting plane approach for the single-product assembly system design problem
    • Gadidov, R., W. E. Wilhelm. 2000. A cutting plane approach for the single-product assembly system design problem. Internat. J. Production Res. 8 1731-1754.
    • (2000) Internat. J. Production Res. , vol.8 , pp. 1731-1754
    • Gadidov, R.1    Wilhelm, W.E.2
  • 9
    • 0024641634 scopus 로고
    • A comprehensive literature review and analysis of the design, balancing and scheduling of assembly systems
    • Ghosh, S., R. J. Gagnon. 1989. A comprehensive literature review and analysis of the design, balancing and scheduling of assembly systems. Internat. J. Production Res. 27 637-670.
    • (1989) Internat. J. Production Res. , vol.27 , pp. 637-670
    • Ghosh, S.1    Gagnon, R.J.2
  • 10
    • 0020751825 scopus 로고
    • An integer programming procedure for assembly system design problems
    • Graves, S. C., B. W. Lamar. 1983. An integer programming procedure for assembly system design problems. Oper. Res. 31 522-545.
    • (1983) Oper. Res. , vol.31 , pp. 522-545
    • Graves, S.C.1    Lamar, B.W.2
  • 11
    • 0002117744 scopus 로고
    • Equipment selection and task assignment for multiproduct assembly system design
    • Graves, S. C., C. H. Redfield. 1988. Equipment selection and task assignment for multiproduct assembly system design. Internat. J. Flexible Manufacturing Systems 1 31-50.
    • (1988) Internat. J. Flexible Manufacturing Systems , vol.1 , pp. 31-50
    • Graves, S.C.1    Redfield, C.H.2
  • 12
    • 0024765174 scopus 로고
    • Fast, effective algorithms for simple assembly line balancing problems
    • Hackman, S. T., M. J. Magazine, T. S. Wee. 1989. Fast, effective algorithms for simple assembly line balancing problems, Oper. Res. 37 916-924.
    • (1989) Oper. Res. , vol.37 , pp. 916-924
    • Hackman, S.T.1    Magazine, M.J.2    Wee, T.S.3
  • 13
    • 0026487247 scopus 로고
    • Eureka: A hybrid system for assembly line balancing
    • Hoffmann, T. R. 1992. Eureka: A hybrid system for assembly line balancing. Management Sci. 38 39-47.
    • (1992) Management Sci. , vol.38 , pp. 39-47
    • Hoffmann, T.R.1
  • 14
    • 0344625674 scopus 로고
    • Technology requirements to support aerospace plant modernization
    • Institute of Industrial Engineers, Norcross, GA
    • Huber, J. 1984. Technology requirements to support aerospace plant modernization. Proc. Ann. Internat. Industrial Engrg. Conf. Institute of Industrial Engineers, Norcross, GA, 262-270.
    • (1984) Proc. Ann. Internat. Industrial Engrg. Conf. , pp. 262-270
    • Huber, J.1
  • 16
    • 0023963644 scopus 로고
    • Optimally balancing large assembly lines with "Fable."
    • Johnson, R. V. 1988. Optimally balancing large assembly lines with "Fable." Management Sci. 34 240-253.
    • (1988) Management Sci. , vol.34 , pp. 240-253
    • Johnson, R.V.1
  • 17
    • 0029358711 scopus 로고
    • Strong cutting plane algorithms for the robotic assembly line balancing problem
    • Kim, H., S. Park. 1995. Strong cutting plane algorithms for the robotic assembly line balancing problem. Internat. J. Production Res. 33 2311-2323.
    • (1995) Internat. J. Production Res. , vol.33 , pp. 2311-2323
    • Kim, H.1    Park, S.2
  • 18
    • 25744457507 scopus 로고    scopus 로고
    • Minimal investment budgets for flow line configuration
    • Lehrstuhl für Produktion und Logistik, Institut für Betriebswirtschaftslehre, Christian-Albrechts Universität zu Kiel, Kiel, Germany
    • Kimms, A. 1998. Minimal investment budgets for flow line configuration. Working paper 470, Lehrstuhl für Produktion und Logistik, Institut für Betriebswirtschaftslehre, Christian-Albrechts Universität zu Kiel, Kiel, Germany.
    • (1998) Working Paper , vol.470
    • Kimms, A.1
  • 19
    • 84877020338 scopus 로고
    • Mathematical model for designing hybrid assembly systems
    • Cincinnati, OH
    • Kuroda, M., H. Tozato. 1987. Mathematical model for designing hybrid assembly systems. Proc. IXth Internat. Conf. Production Res. Cincinnati, OH, 2139-2145.
    • (1987) Proc. IXth Internat. Conf. Production Res. , pp. 2139-2145
    • Kuroda, M.1    Tozato, H.2
  • 21
    • 0015483845 scopus 로고
    • Production-line balances for mixed-model lines
    • McCaskill, J. L. C. 1972. Production-line balances for mixed-model lines. Management Sci. 19 423-434.
    • (1972) Management Sci. , vol.19 , pp. 423-434
    • McCaskill, J.L.C.1
  • 24
    • 0033346956 scopus 로고    scopus 로고
    • A facet generation procedure for solving 0/1 integer programs
    • Parija, G. R., R. Gadidov, W. E. Wilhelm. 1999. A facet generation procedure for solving 0/1 integer programs. Oper. Res. 47 789-791.
    • (1999) Oper. Res. , vol.47 , pp. 789-791
    • Parija, G.R.1    Gadidov, R.2    Wilhelm, W.E.3
  • 25
    • 84877037454 scopus 로고
    • Ph.D. thesis, School of Industrial and Systems Engineering, Georgia Institute of Technology, Atlanta, GA
    • Peters, B. A. 1991. Strategic design of flexible assembly systems. Ph.D. thesis, School of Industrial and Systems Engineering, Georgia Institute of Technology, Atlanta, GA.
    • (1991) Strategic Design of Flexible Assembly Systems
    • Peters, B.A.1
  • 26
    • 0030823620 scopus 로고    scopus 로고
    • A family of hierarchical models for the assembly system design
    • Pinnoi, A., W. E. Wilhelm, 1997a. A family of hierarchical models for the assembly system design. Internat. J. Production Res. 35 253-280.
    • (1997) Internat. J. Production Res. , vol.35 , pp. 253-280
    • Pinnoi, A.1    Wilhelm, W.E.2
  • 27
    • 0011717224 scopus 로고    scopus 로고
    • A branch-and-cut approach for workload smoothing on assembly lines
    • Pinnoi, A., W. E. Wilhelm. 1997b. A branch-and-cut approach for workload smoothing on assembly lines. ORSA J. Comput. 9 335-350.
    • (1997) ORSA J. Comput. , vol.9 , pp. 335-350
    • Pinnoi, A.1    Wilhelm, W.E.2
  • 28
    • 0031677329 scopus 로고    scopus 로고
    • Assembly system design: A branch-and-cut approach
    • Pinnoi, A., W. E. Wilhelm. 1998. Assembly system design: A branch-and-cut approach. Management Sci. 44 103-118.
    • (1998) Management Sci. , vol.44 , pp. 103-118
    • Pinnoi, A.1    Wilhelm, W.E.2
  • 29
    • 0020781916 scopus 로고
    • Assembly line balancing with processing alternatives: An application
    • Pinto, P. A., D. G. Dannenbring, B. M. Khumawala. 1983, Assembly line balancing with processing alternatives: An application. Management Sci. 29 817-830.
    • (1983) Management Sci. , vol.29 , pp. 817-830
    • Pinto, P.A.1    Dannenbring, D.G.2    Khumawala, B.M.3
  • 31
    • 0001193704 scopus 로고    scopus 로고
    • SALOME: A bidirectional branch-and-bound procedure for assembly line balancing
    • Scholl, A., R. Klein. 1997. SALOME: A bidirectional branch-and-bound procedure for assembly line balancing. INFORMS J. Comput. 9 319-334.
    • (1997) INFORMS J. Comput. , vol.9 , pp. 319-334
    • Scholl, A.1    Klein, R.2
  • 32
    • 0020718128 scopus 로고
    • Formulation and solution of nonlinear integer production planning problems for flexible manufacturing systems
    • Stecke, K. 1983. Formulation and solution of nonlinear integer production planning problems for flexible manufacturing systems. Management Sci. 29 273-288.
    • (1983) Management Sci. , vol.29 , pp. 273-288
    • Stecke, K.1
  • 33
    • 0031276404 scopus 로고    scopus 로고
    • Designing paced assembly lines with a fixed number of stations
    • Ugurdag, H. F., R. Rachamadugu, C. A. Papachristou. 1997. Designing paced assembly lines with a fixed number of stations. Eur. J. Oper. Res. 102 488-501.
    • (1997) Eur. J. Oper. Res. , vol.102 , pp. 488-501
    • Ugurdag, H.F.1    Rachamadugu, R.2    Papachristou, C.A.3
  • 34
    • 0032651420 scopus 로고    scopus 로고
    • A column generation approach for the assembly system design problem with tool changes
    • Wilhelm, W. E. 1999. A column generation approach for the assembly system design problem with tool changes. Internat, J. Flexible Manufacturing Systems 11 177-205.
    • (1999) Internat, J. Flexible Manufacturing Systems , vol.11 , pp. 177-205
    • Wilhelm, W.E.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.