-
2
-
-
0022768294
-
A survey of exact algorithms for the simple assembly line balancing problem
-
Baybars I. (1986). A survey of exact algorithms for the simple assembly line balancing problem. Mngt Sci 32: 909-932.
-
(1986)
Mngt Sci
, vol.32
, pp. 909-932
-
-
Baybars, I.1
-
3
-
-
0020116655
-
Assembly line balancing as generalized bin packing
-
Wee T.S. and Magazine M.J. (1982). Assembly line balancing as generalized bin packing. Opns Res Letters 1:56-58.
-
(1982)
Opns Res Letters
, vol.1
, pp. 56-58
-
-
Wee, T.S.1
Magazine, M.J.2
-
4
-
-
0024641634
-
A comprehensive literature review and analysis of the design, balancing and scheduling of assembly systems
-
Ghosh S. and Gagnon R.J. (1989). A comprehensive literature review and analysis of the design, balancing and scheduling of assembly systems. Int J Prob Res 27:637-670.
-
(1989)
Int J Prob Res
, vol.27
, pp. 637-670
-
-
Ghosh, S.1
Gagnon, R.J.2
-
6
-
-
0031543416
-
Simple assembly line balancing- Heuristic approaches
-
Scholl A and Voss S (1996). Simple assembly line balancing- Heuristic approaches. J Heuristics 2: 217-244.
-
(1996)
J Heuristics
, vol.2
, pp. 217-244
-
-
Scholl, A.1
Voss, S.2
-
7
-
-
0000028230
-
Comments on a paper by Bowman
-
White W.W. (1961). Comments on a paper by Bowman. Opns Res 9: 274-276.
-
(1961)
Opns Res
, vol.9
, pp. 274-276
-
-
White, W.W.1
-
8
-
-
0021202885
-
An integer programming algorithm with network cuts for solving the assembly line balancing problem
-
Talbot F.B. and Patterson J.H. (1984). An integer programming algorithm with network cuts for solving the assembly line balancing problem. Mngt Sci 30:85-99.
-
(1984)
Mngt Sci
, vol.30
, pp. 85-99
-
-
Talbot, F.B.1
Patterson, J.H.2
-
9
-
-
0025258226
-
A dynamic program with fathoming and dynamic upper bounds for the assembly line balancing problem
-
Easton F.F. (1990). A dynamic program with fathoming and dynamic upper bounds for the assembly line balancing problem. Comput Opns Res 17:163-175.
-
(1990)
Comput Opns Res
, vol.17
, pp. 163-175
-
-
Easton, F.F.1
-
10
-
-
0020103084
-
On dynamic programming methods for assembly line balancing
-
Kao E.P.C. and Queyraune M. (1982). On dynamic programming methods for assembly line balancing. Opns Res 30: 375-390.
-
(1982)
Opns Res
, vol.30
, pp. 375-390
-
-
Kao, E.P.C.1
Queyraune, M.2
-
11
-
-
0017972181
-
Dynamic programming solution of sequencing problems with precedence constraints
-
Schrage L. and Baker K.R. (1978). Dynamic programming solution of sequencing problems with precedence constraints. Opns Res 26: 444-449.
-
(1978)
Opns Res
, vol.26
, pp. 444-449
-
-
Schrage, L.1
Baker, K.R.2
-
12
-
-
0023963644
-
Optimally balancing large assembly lines with FABLE
-
Johnson R.V. (1988). Optimally balancing large assembly lines with FABLE. Mngt Sci 34: 240-253.
-
(1988)
Mngt Sci
, vol.34
, pp. 240-253
-
-
Johnson, R.V.1
-
13
-
-
0026487247
-
EUREKA: A hybrid system for assembly line balancing
-
Hoffmann T.R. (1992). EUREKA: A hybrid system for assembly line balancing. Mngt Sci 38: 39-47.
-
(1992)
Mngt Sci
, vol.38
, pp. 39-47
-
-
Hoffmann, T.R.1
-
14
-
-
0001193704
-
SALOME: A bidirectional branch and bound procedure for assembly line balancing
-
Scholl A. and Klein R. (1997). SALOME: A bidirectional branch and bound procedure for assembly line balancing. Informs J Comput 9:319-334.
-
(1997)
Informs J Comput
, vol.9
, pp. 319-334
-
-
Scholl, A.1
Klein, R.2
-
15
-
-
0031122267
-
A heuristic for an assembly line balancing problem with incompatibility, range, and partial precedence constraints
-
Park K., Park S. and Kim W. (1997). A heuristic for an assembly line balancing problem with incompatibility, range, and partial precedence constraints. Comput Ind Eng 32: 321-332.
-
(1997)
Comput Ind Eng
, vol.32
, pp. 321-332
-
-
Park, K.1
Park, S.2
Kim, W.3
-
16
-
-
0012064450
-
Assembly line design with incompa-tible task assignments
-
Rachamadugu R. (1991). Assembly line design with incompa-tible task assignments. J Opns Mngt 10: 469-487.
-
(1991)
J Opns Mngt
, vol.10
, pp. 469-487
-
-
Rachamadugu, R.1
-
18
-
-
0026851799
-
Branch- and-bound algorithm for the multi-product assembly line balancing problem
-
Berger I., Bourjolly J.M. and Laporte G. (1992). Branch- and-bound algorithm for the multi-product assembly line balancing problem. Eur J Opl Res 58: 215-222.
-
(1992)
Eur J Opl Res
, vol.58
, pp. 215-222
-
-
Berger, I.1
Bourjolly, J.M.2
Laporte, G.3
-
19
-
-
0030241346
-
A knowledge-based system for solving multi-objective assembly line balancing problems
-
Malakooti B. and Kumar A. (1996). A knowledge-based system for solving multi-objective assembly line balancing problems. Int J Prod Res 34: 2533-2552.
-
(1996)
Int J Prod Res
, vol.34
, pp. 2533-2552
-
-
Malakooti, B.1
Kumar, A.2
-
20
-
-
0001634874
-
Genetic algorithm for assembly line balancing
-
Rubinovitz J. and Levitin G. (1995). Genetic algorithm for assembly line balancing. Int J Prod Econ 41: 343-354.
-
(1995)
Int J Prod Econ
, vol.41
, pp. 343-354
-
-
Rubinovitz, J.1
Levitin, G.2
-
21
-
-
0000423498
-
Stochastic assembly line balancing using stimulated annealing
-
Suresh G. and Sahu S. (1994). Stochastic assembly line balancing using stimulated annealing. Int J Prod Res 32: 1801-1810.
-
(1994)
Int J Prod Res
, vol.32
, pp. 1801-1810
-
-
Suresh, G.1
Sahu, S.2
-
22
-
-
0000411214
-
Tabu search-Part I
-
Glover F. (1989). Tabu search-Part I. ORSA J Comput 1: 190-206.
-
(1989)
ORSA J Comput
, vol.1
, pp. 190-206
-
-
Glover, F.1
-
23
-
-
0001724713
-
Tabu search-Part II
-
Glover F. (1990). Tabu search-Part II. ORSA J Comput 2: 4-32.
-
(1990)
ORSA J Comput
, vol.2
, pp. 4-32
-
-
Glover, F.1
-
26
-
-
0032361515
-
The application of a tabu search metaheuristic to the assembly line balancing problem
-
Chiang W.-C. (1998). The application of a tabu search metaheuristic to the assembly line balancing problem. Ann Opns Res 77: 209-227.
-
(1998)
Ann Opns Res
, vol.77
, pp. 209-227
-
-
Chiang, W.-C.1
-
27
-
-
0028516690
-
Applying tabu search with influential diversification to multiprocessor scheduling
-
Htihscher R. and Glover F. (1994). Applying tabu search with influential diversification to multiprocessor scheduling. Comput Opns Res 21:877-884.
-
(1994)
Comput Opns Res
, vol.21
, pp. 877-884
-
-
Htihscher, R.1
Glover, F.2
-
28
-
-
0012070866
-
Tabu search in manufacturing
-
Dyckhoff H., Derigs U., Salomon M. and Tijms H.C. (eds). Springer: Berlin
-
Voss S. (1994). Tabu search in manufacturing. In: Dyckhoff H., Derigs U., Salomon M. and Tijms H.C. (eds). Operational Research Proceedings 1993. Springer: Berlin, pp 183-194.
-
(1994)
Operational Research Proceedings 1993
, pp. 183-194
-
-
Voss, S.1
-
29
-
-
0023428683
-
A two-process implicit enumeration algorithm for the simple assembly line balancing problem
-
Saltzman M.J. and Baybars I. (1987). A two-process implicit enumeration algorithm for the simple assembly line balancing problem. Eur J Opl Res 32:118-129.
-
(1987)
Eur J Opl Res
, vol.32
, pp. 118-129
-
-
Saltzman, M.J.1
Baybars, I.2
-
30
-
-
0029209087
-
A multiple-rule heuristic for assembly line balancing
-
Boctor F.F. (1995). A multiple-rule heuristic for assembly line balancing. J Opl Res Soc 46:62-69.
-
(1995)
J Opl Res Soc
, vol.46
, pp. 62-69
-
-
Boctor, F.F.1
-
31
-
-
0012037276
-
A comparative study of heuristic general assembly line balancing techniques
-
Bhattacharjee T.K. and Sahu S. (1989). A comparative study of heuristic general assembly line balancing techniques. Asia- Pacific J Opl Res 6: 63-76.
-
(1989)
Asia- Pacific J Opl Res
, vol.6
, pp. 63-76
-
-
Bhattacharjee, T.K.1
Sahu, S.2
-
32
-
-
0001108060
-
Assembly line balancing using ranked positional weight technique
-
Helgeson W.P. and Birnie D.P. (1961). Assembly line balancing using ranked positional weight technique. J Industrial Eng 12: 394-398.
-
(1961)
J Industrial Eng
, vol.12
, pp. 394-398
-
-
Helgeson, W.P.1
Birnie, D.P.2
-
33
-
-
0002569892
-
A heuristic method of assembly line balancing for assumptions of constant or variable work element times
-
Moodie C.L. and Young H.H. (1965). A heuristic method of assembly line balancing for assumptions of constant or variable work element times. J Industrial Eng 16: 23-29.
-
(1965)
J Industrial Eng
, vol.16
, pp. 23-29
-
-
Moodie, C.L.1
Young, H.H.2
-
34
-
-
0000671840
-
Assembly line balancing using probabilistic combination of heuristics
-
Tonge F.M. (1965). Assembly line balancing using probabilistic combination of heuristics. Mngt Sci 11: 727-735.
-
(1965)
Mngt Sci
, vol.11
, pp. 727-735
-
-
Tonge, F.M.1
-
35
-
-
0022699406
-
A comparative evaluation of heuristic line balancing techniques
-
Talbot F.B., Patterson J.H. and Gehrlein W.V. (1986). A comparative evaluation of heuristic line balancing techniques. Mngt Sci 32: 430-456.
-
(1986)
Mngt Sci
, vol.32
, pp. 430-456
-
-
Talbot, F.B.1
Patterson, J.H.2
Gehrlein, W.V.3
-
36
-
-
0030573486
-
Maximizing the production rate in simple assembly line balancing-A branch and bound procedure
-
Klein R. and Scholl A. (1996). Maximizing the production rate in simple assembly line balancing-A branch and bound procedure. Eur J Opl Res 91: 367-385.
-
(1996)
Eur J Opl Res
, vol.91
, pp. 367-385
-
-
Klein, R.1
Scholl, A.2
|