메뉴 건너뛰기




Volumn 35, Issue 3-4, 1998, Pages 467-470

Designing parallel assembly lines

Author keywords

Assembly Line Balancing; Mathematical Modeling; Parallel Lines; Parallel Stations

Indexed keywords

MATHEMATICAL MODELS; PROCESS ENGINEERING; SCHEDULING; STRATEGIC PLANNING;

EID: 0032311650     PISSN: 03608352     EISSN: None     Source Type: Journal    
DOI: 10.1016/s0360-8352(98)00135-1     Document Type: Article
Times cited : (51)

References (3)
  • 1
    • 0024673749 scopus 로고
    • Assembly line balancing with parallel worksattions and dead time
    • Bard, J. "Assembly Line Balancing with Parallel Worksattions and Dead Time," Int'l. J. Prod. Res., Vol.27, 1989, pp. 1005-1018.
    • (1989) Int'l. J. Prod. Res. , vol.27 , pp. 1005-1018
    • Bard, J.1
  • 2
    • 0000396642 scopus 로고
    • A branch and bound algorithm for assembly line balancing with paralleling
    • Pinto, P.A., Dannenbring, D.G. and Khumawala, B.M., "A Branch and Bound Algorithm for Assembly Line Balancing with Paralleling," Int'l J. Prod. Res., Vol. 19, 1981, pp. 565-576.
    • (1981) Int'l J. Prod. Res. , vol.19 , pp. 565-576
    • Pinto, P.A.1    Dannenbring, D.G.2    Khumawala, B.M.3
  • 3
    • 21844471842 scopus 로고
    • A knowledge-based system for selection of resource allocation rules and algorithms
    • (eds. A. Mital And S. Anand), Chapman and Hall
    • Süer, G.A. and Dagli, C., A Knowledge-Based System for Selection of Resource Allocation Rules and Algorithms, in Handbook of Expert System Applications in Manufacturing; Structures and Rules, (eds. A. Mital And S. Anand), Chapman and Hall, 1994, pp. 108-147.
    • (1994) Handbook of Expert System Applications in Manufacturing; Structures and Rules , pp. 108-147
    • Süer, G.A.1    Dagli, C.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.