메뉴 건너뛰기




Volumn 11, Issue 2, 1999, Pages 177-205

Column-generation approach for the assembly system design problem with tool changes

Author keywords

[No Author keywords available]

Indexed keywords

COMPUTATIONAL COMPLEXITY; COMPUTATIONAL METHODS; CONSTRAINT THEORY; COSTS; LINEAR PROGRAMMING; MATHEMATICAL MODELS; PROBLEM SOLVING; ROBOTIC ASSEMBLY;

EID: 0032651420     PISSN: 09206299     EISSN: None     Source Type: Journal    
DOI: 10.1023/A:1008067422364     Document Type: Article
Times cited : (38)

References (49)
  • 4
    • 84986992097 scopus 로고
    • An Algorithm for the Resource Constrained Shortest Path Problem
    • Beasley, J.E. and Christofides, N., "An Algorithm for the Resource Constrained Shortest Path Problem," Networks, Vol. 19, pp. 379-394 (1989).
    • (1989) Networks , vol.19 , pp. 379-394
    • Beasley, J.E.1    Christofides, N.2
  • 6
    • 0344193908 scopus 로고
    • Integration of Assembly Robots in a Flexible Assembly System
    • A. Kusiak (Ed.), Elsevier Science Publishers, North-Holland, Amsterdam
    • Chakravarty, AK. and Shtub, A., "Integration of Assembly Robots in a Flexible Assembly System," in Flexible Manufacturing Systems: Methods and Studies, A. Kusiak (Ed.), Elsevier Science Publishers, North-Holland, Amsterdam (1986).
    • (1986) Flexible Manufacturing Systems: Methods and Studies
    • Chakravarty, A.K.1    Shtub, A.2
  • 8
    • 0023537240 scopus 로고
    • Simplified Generation of All Mechanical Assembly Sequences
    • December
    • de Fazio, T.L. and Whitney, D.E., "Simplified Generation of All Mechanical Assembly Sequences," IEEE Journal on Robotics and Automation, Vol. 3, No. 6, pp. 640-658 (December 1987).
    • (1987) IEEE Journal on Robotics and Automation , vol.3 , Issue.6 , pp. 640-658
    • De Fazio, T.L.1    Whitney, D.E.2
  • 9
    • 0345056111 scopus 로고
    • Correction to 'Simplified Generation of all Mechanical Assembly Sequences'
    • December
    • de Fazio, T.L. and Whitney, D.E., "Correction to 'Simplified Generation of all Mechanical Assembly Sequences'," IEEE Journal on Robotics and Automation, Vol. 4, No. 6, pp. 705-708 (December 1988).
    • (1988) IEEE Journal on Robotics and Automation , vol.4 , Issue.6 , pp. 705-708
    • De Fazio, T.L.1    Whitney, D.E.2
  • 10
    • 85042163696 scopus 로고
    • A New Optimizing Algorithm for the Vehicle Routing Problem with Time Windows
    • Desrochers, M., Desrosiers, J., and Solomon, M., "A New Optimizing Algorithm for the Vehicle Routing Problem with Time Windows," Operations Research, Vol. 40, No. 2, pp. 342-354 (1992).
    • (1992) Operations Research , vol.40 , Issue.2 , pp. 342-354
    • Desrochers, M.1    Desrosiers, J.2    Solomon, M.3
  • 12
    • 0002144209 scopus 로고
    • A Generalized Permanent Labeling Algorithm for the Shortest Path Problem with Time Windows
    • Desrochers, M. and Soumis, F., "A Generalized Permanent Labeling Algorithm for the Shortest Path Problem with Time Windows," INFOR, Vol. 26, No. 3, pp. 191-211 (1988a).
    • (1988) INFOR , vol.26 , Issue.3 , pp. 191-211
    • Desrochers, M.1    Soumis, F.2
  • 13
    • 0024011365 scopus 로고
    • A Re-optimization Algorithm for the Shortest Path Problem with Time Windows
    • Desrochers, M. and Soumis, F., "A Re-optimization Algorithm for the Shortest Path Problem with Time Windows," European Journal of Operational Research, Vol. 35, pp. 242-254 (1988b).
    • (1988) European Journal of Operational Research , vol.35 , pp. 242-254
    • Desrochers, M.1    Soumis, F.2
  • 14
    • 0021691757 scopus 로고
    • Routing with Time Windows by Column Generation
    • Desrosiers, J., Soumis, F., and Desrochers, M., "Routing with Time Windows by Column Generation," Networks, Vol. 14, pp. 545-565 (1984).
    • (1984) Networks , vol.14 , pp. 545-565
    • Desrosiers, J.1    Soumis, F.2    Desrochers, M.3
  • 15
    • 0022709422 scopus 로고
    • The Potential Market for Robot Assembly
    • Funk, J.L., "The Potential Market for Robot Assembly," International Journal of Production Research, Vol. 24, No. 3, pp. 663-686 (1986).
    • (1986) International Journal of Production Research , vol.24 , Issue.3 , pp. 663-686
    • Funk, J.L.1
  • 16
    • 0024641634 scopus 로고
    • A Comprehensive Literature Review and Analysis of the Design, Balancing, and Scheduling of Assembly Systems
    • Ghosh, S. and Gagnon, R.J., "A Comprehensive Literature Review and Analysis of the Design, Balancing, and Scheduling of Assembly Systems," International Journal of Production Research, Vol. 27, pp. 637-670 (1989).
    • (1989) International Journal of Production Research , vol.27 , pp. 637-670
    • Ghosh, S.1    Gagnon, R.J.2
  • 17
    • 0001510482 scopus 로고
    • A Linear Programming Approach to the Cutting Stock Problem
    • Gilmore, P.C. and R.E. Gomory, "A Linear Programming Approach to the Cutting Stock Problem," Operations Research, Vol. 9, pp. 849-859 (1961).
    • (1961) Operations Research , vol.9 , pp. 849-859
    • Gilmore, P.C.1    Gomory, R.E.2
  • 18
    • 0000143954 scopus 로고
    • A Linear Programming Approach to the Cutting Stock Problem - Part II
    • Gilmore, P.C. and R.E. Gomory, "A Linear Programming Approach to the Cutting Stock Problem - Part II," Operations Research, Vol. 11, No. 6, pp. 863-888 (1963).
    • (1963) Operations Research , vol.11 , Issue.6 , pp. 863-888
    • Gilmore, P.C.1    Gomory, R.E.2
  • 19
    • 0020751825 scopus 로고
    • An Integer Programming Procedure for Assembly System Design Problems
    • May-June
    • Graves, S.C. and Lamar, B.W., "An Integer Programming Procedure for Assembly System Design Problems," Operations Research, Vol. 31, No. 3, pp. 522-545 (May-June 1983).
    • (1983) Operations Research , vol.31 , Issue.3 , pp. 522-545
    • Graves, S.C.1    Lamar, B.W.2
  • 21
    • 0018698979 scopus 로고
    • A Mathematical Programming Procedure for Equipment Selection and System Evaluation in Programmable Assembly
    • Graves, S.C. and Whitney, D.E., "A Mathematical Programming Procedure for Equipment Selection and System Evaluation in Programmable Assembly," in Proceedings of the 18th IEEE Conference on Decision and Control, pp. 531-536 (1979).
    • (1979) Proceedings of the 18th IEEE Conference on Decision and Control , pp. 531-536
    • Graves, S.C.1    Whitney, D.E.2
  • 22
    • 0024765174 scopus 로고
    • Fast, Effective Algorithms for Simple Assembly Line Balancing Problems
    • Hackman, S.T., Magazine, M.J., and Wee, T.S., "Fast, Effective Algorithms for Simple Assembly Line Balancing Problems," Operations Research, Vol. 37, No. 6, pp. 916-924 (1989).
    • (1989) Operations Research , vol.37 , Issue.6 , pp. 916-924
    • Hackman, S.T.1    Magazine, M.J.2    Wee, T.S.3
  • 23
    • 84987047540 scopus 로고
    • A Dual Algorithm for the Constrained Shortest Path Problem
    • Handler, G.Y. and Zang, I., "A Dual Algorithm for the Constrained Shortest Path Problem," Networks, Vol. 10, pp. 293-310 (1980).
    • (1980) Networks , vol.10 , pp. 293-310
    • Handler, G.Y.1    Zang, I.2
  • 24
    • 0026487247 scopus 로고
    • 'EUREKA': A Hybrid System for Assembly Line Balancing
    • Hoffman, T.R., "'EUREKA': A Hybrid System for Assembly Line Balancing," Management Science, Vol. 38, No. 1, pp. 39-47 (1992).
    • (1992) Management Science , vol.38 , Issue.1 , pp. 39-47
    • Hoffman, T.R.1
  • 26
    • 0344625674 scopus 로고
    • Technology Requirements to Support Aerospace Plant Modernization
    • Institute of Industrial Engineers, Norcross, GA
    • Huber, J., "Technology Requirements to Support Aerospace Plant Modernization," in Proceedings: 1984 International Industrial Engineering Conference, Institute of Industrial Engineers, Norcross, GA, pp. 262-270 (1984).
    • (1984) Proceedings: 1984 International Industrial Engineering Conference , pp. 262-270
    • Huber, J.1
  • 29
    • 0020848902 scopus 로고
    • A Branch and Bound Algorithm for Assembly Line Balancing Problems with Formulation Irregularities
    • Johnson, R.V., "A Branch and Bound Algorithm for Assembly Line Balancing Problems with Formulation Irregularities," Management Science, Vol. 29, No. 11, pp. 1309-1324 (1983).
    • (1983) Management Science , vol.29 , Issue.11 , pp. 1309-1324
    • Johnson, R.V.1
  • 30
    • 0023963644 scopus 로고
    • Optimally Balancing Large Assembly Lines with FABLE
    • Johnson, R.V., "Optimally Balancing Large Assembly Lines with FABLE," Management Science, Vol. 34, pp. 240-253 (1988).
    • (1988) Management Science , vol.34 , pp. 240-253
    • Johnson, R.V.1
  • 31
    • 0344193873 scopus 로고
    • Impact of Resequencing on Parallel Assembly Systems
    • Kumar, A., Gurnani, H., and Kekre, S., "Impact of Resequencing on Parallel Assembly Systems," Journal of Manufacturing Systems, Vol. 14, No. 2, pp. 109-117 (1995).
    • (1995) Journal of Manufacturing Systems , vol.14 , Issue.2 , pp. 109-117
    • Kumar, A.1    Gurnani, H.2    Kekre, S.3
  • 34
    • 0002965016 scopus 로고    scopus 로고
    • An Integrated Design Support Method for Flexible Assembly Systems
    • Lee, H.F. and Stecke, K.E., "An Integrated Design Support Method for Flexible Assembly Systems," Journal of Manufacturing Systems, Vol. 15, No. 1, pp. 13-32 (1996).
    • (1996) Journal of Manufacturing Systems , vol.15 , Issue.1 , pp. 13-32
    • Lee, H.F.1    Stecke, K.E.2
  • 37
    • 0002844993 scopus 로고
    • Computer-controlled Assembly
    • February
    • Nevins, J.L. and Whitney, D.E., "Computer-Controlled Assembly," Scientific American, Vol. 238, No. 2 (February 1978).
    • (1978) Scientific American , vol.238 , Issue.2
    • Nevins, J.L.1    Whitney, D.E.2
  • 39
    • 0030823620 scopus 로고    scopus 로고
    • A Family of Hierarchical Models for the Design of Deterministic Assembly Systems
    • Pinnoi, A. and Wilhelm, W.E., "A Family of Hierarchical Models for the Design of Deterministic Assembly Systems," International Journal of Production Research, Vol. 35, No. 1, pp. 253-280 (1997a).
    • (1997) International Journal of Production Research , vol.35 , Issue.1 , pp. 253-280
    • Pinnoi, A.1    Wilhelm, W.E.2
  • 40
    • 0011717224 scopus 로고    scopus 로고
    • A Branch-and-cut Approach for Workload Smoothing on Assembly Lines
    • Pinnoi, A. and Wilhelm, W.E., "A Branch-and-Cut Approach for Workload Smoothing on Assembly Lines," INFORMS Journal on Computing, Vol. 9, No. 4, pp. 335-350 (1997b).
    • (1997) INFORMS Journal on Computing , vol.9 , Issue.4 , pp. 335-350
    • Pinnoi, A.1    Wilhelm, W.E.2
  • 41
    • 0031677329 scopus 로고    scopus 로고
    • Assembly System Design: A Branch and Cut Approach
    • Pinnoi, A. and Wilhelm, W.E., "Assembly System Design: A Branch and Cut Approach," Management Science, Vol. 44, No. 1, pp. 103-118 (1998).
    • (1998) Management Science , vol.44 , Issue.1 , pp. 103-118
    • Pinnoi, A.1    Wilhelm, W.E.2
  • 42
    • 0020781916 scopus 로고
    • Assembly Line Balancing with Processing Alternatives: An Application
    • Pinto, P.A., Dannenbring, D.G., and Khumawala, B.M., "Assembly Line Balancing with Processing Alternatives: An Application," Management Science, Vol. 29, No. 7, pp. 817-830 (1983).
    • (1983) Management Science , vol.29 , Issue.7 , pp. 817-830
    • Pinto, P.A.1    Dannenbring, D.G.2    Khumawala, B.M.3
  • 44
    • 0028460582 scopus 로고
    • Optimal Product Sequence for a Product with Matching Components
    • So, K.C. and Scott, C.H., "Optimal Product Sequence for a Product with Matching Components," Operations Research, Vol. 42, No. 4, pp. 694-708 (1994).
    • (1994) Operations Research , vol.42 , Issue.4 , pp. 694-708
    • So, K.C.1    Scott, C.H.2
  • 46
    • 84995006908 scopus 로고
    • A Modeling Approach to Aid in Designing Robotized Manufacturing Cells
    • Wilhelm, WE., Kalkunte, M.V., and Cash, C., "A Modeling Approach to Aid in Designing Robotized Manufacturing Cells," Journal of Robotic Systems, Vol. 4, No. 1, pp. 25-48 (1987).
    • (1987) Journal of Robotic Systems , vol.4 , Issue.1 , pp. 25-48
    • Wilhelm, W.E.1    Kalkunte, M.V.2    Cash, C.3
  • 47
    • 0002645608 scopus 로고
    • On the Automatic Generation of Assembly Plans
    • H. Homem de Mello and S. Lee (Eds.), Kluwer Academic Publishers, Boston
    • Wolter, J.D., "On the Automatic Generation of Assembly Plans," in Computer Aided Mechanical Assembly Planning, H. Homem de Mello and S. Lee (Eds.), Kluwer Academic Publishers, Boston, pp. 263-288 (1991).
    • (1991) Computer Aided Mechanical Assembly Planning , pp. 263-288
    • Wolter, J.D.1
  • 48
    • 0001839895 scopus 로고
    • A Combinatorial Analysis of Enumerative Data Structures for Assembly Planning
    • Wolter, J.D., "A Combinatorial Analysis of Enumerative Data Structures for Assembly Planning," Journal of Design and Manufacturing, Vol. 2, No. 2, pp. 93-104 (1992).
    • (1992) Journal of Design and Manufacturing , vol.2 , Issue.2 , pp. 93-104
    • Wolter, J.D.1
  • 49
    • 0004944582 scopus 로고
    • Mating Constraint Languages for Assembly Sequence Planning
    • Department of Computer Science, Texas A&M University, College Station, September
    • Wolter, J.D., Chakrabarty, S., and Tsao, J., "Mating Constraint Languages for Assembly Sequence Planning," Technical Report 91-038, Department of Computer Science, Texas A&M University, College Station, (September 1991).
    • (1991) Technical Report 91-038
    • Wolter, J.D.1    Chakrabarty, S.2    Tsao, J.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.