-
2
-
-
0022768294
-
Survey of exact algorithms for the simple assembly line balancing problem
-
I. Baybars A survey of exact algorithms for the simple assembly line balancing problem Management Sci. 32 1986 909 932 (Pubitemid 16612186)
-
(1986)
Management Science
, vol.32
, Issue.8
, pp. 909-932
-
-
Baybars Ilker1
-
3
-
-
0001387789
-
A decomposition theorem for partially ordered sets
-
R.P. Dilworth A decomposition theorem for partially ordered sets Ann. Math. 51 1950 161 166
-
(1950)
Ann. Math.
, vol.51
, pp. 161-166
-
-
Dilworth, R.P.1
-
5
-
-
0024641634
-
A comprehensive literature review and analysis of the design, balancing and scheduling of assembly systems
-
S. Ghosh, and R.J. Gagnon A comprehensive literature review and analysis of the design, balancing and scheduling of assembly systems Internat. J. Production Res. 27 4 1989 637 670
-
(1989)
Internat. J. Production Res.
, vol.27
, Issue.4
, pp. 637-670
-
-
Ghosh, S.1
Gagnon, R.J.2
-
6
-
-
0020751825
-
An integer programming procedure for assembly system design problems
-
S.C. Graves, and B.W. Lamar An integer programming procedure for assembly system design problems Oper. Res. 31 3 1983 522 545
-
(1983)
Oper. Res.
, vol.31
, Issue.3
, pp. 522-545
-
-
Graves, S.C.1
Lamar, B.W.2
-
7
-
-
0002117744
-
Equipment selection and task assignment for multiproduct assembly system design
-
S.C. Graves, and C.H. Redfield Equipment selection and task assignment for multiproduct assembly system design Internat. J. Flexible Manuf. Systems 1 1 1988 31 50
-
(1988)
Internat. J. Flexible Manuf. Systems
, vol.1
, Issue.1
, pp. 31-50
-
-
Graves, S.C.1
Redfield, C.H.2
-
8
-
-
0029205206
-
Assembly planning research at CSIRO Australia
-
Pittsburgh, PA, August
-
S. Grewal, P. Tran, A. Bhaskare, Assembly planning research at CSIRO Australia, First International Symposium on Assembly and Task Planning ISATP 95, Pittsburgh, PA, August, 1995.
-
(1995)
First International Symposium on Assembly and Task Planning ISATP 95
-
-
Grewal, S.1
Tran, P.2
Bhaskare, A.3
-
9
-
-
0001474336
-
An algorithm for the line balancing problem
-
A.L. Gutjahr, and G.L. Nemhauser An algorithm for the line balancing problem Management Sci. 11 2 1964 308 315
-
(1964)
Management Sci.
, vol.11
, Issue.2
, pp. 308-315
-
-
Gutjahr, A.L.1
Nemhauser, G.L.2
-
10
-
-
0000313704
-
Assembly line balancing - Dynamic programming with precedence constraints
-
M. Held, R.M. Karp, and R. Shareshian Assembly line balancing - dynamic programming with precedence constraints Oper. Res. 11 1963 442 459
-
(1963)
Oper. Res.
, vol.11
, pp. 442-459
-
-
Held, M.1
Karp, R.M.2
Shareshian, R.3
-
11
-
-
84952496111
-
Assembly line balancing - A set of challenging problems
-
T.R. Hoffmann Assembly line balancing - a set of challenging problems Internat. J. Production Res. 28 1990 1807 1815
-
(1990)
Internat. J. Production Res.
, vol.28
, pp. 1807-1815
-
-
Hoffmann, T.R.1
-
12
-
-
0026487247
-
EUREKA: A hybrid system for assembly line balancing
-
T.R. Hoffmann EUREKA: a hybrid system for assembly line balancing Management Sci. 38 1 1992 39 47
-
(1992)
Management Sci.
, vol.38
, Issue.1
, pp. 39-47
-
-
Hoffmann, T.R.1
-
13
-
-
0023963644
-
Optimally balancing large assembly lines with FABLE
-
R.V. Johnson Optimally balancing large assembly lines with FABLE Management Sci. 34 2 1988 240 253
-
(1988)
Management Sci.
, vol.34
, Issue.2
, pp. 240-253
-
-
Johnson, R.V.1
-
14
-
-
0020103084
-
On dynamic programming methods for assembly line balancing
-
E.P.C. Kao, and M. Queyranne On dynamic programming methods for assembly line balancing Oper. Res. 30 2 1982 375 390
-
(1982)
Oper. Res.
, vol.30
, Issue.2
, pp. 375-390
-
-
Kao, E.P.C.1
Queyranne, M.2
-
15
-
-
0003037529
-
Reducibility among combinatorial problems
-
R.E. Miller, J.W. Thatcher, Plenum Press New York
-
R.M. Karp Reducibility among combinatorial problems R.E. Miller, J.W. Thatcher, Complexity of Computer Computations 1972 Plenum Press New York 85 104
-
(1972)
Complexity of Computer Computations
, pp. 85-104
-
-
Karp, R.M.1
-
16
-
-
0001846124
-
A line-balancing strategy for designing flexible assembly systems
-
H.F. Lee, and R.V. Johnson A line-balancing strategy for designing flexible assembly systems Internat. J. Flexible Manuf. Systems 3 1991 91 120
-
(1991)
Internat. J. Flexible Manuf. Systems
, vol.3
, pp. 91-120
-
-
Lee, H.F.1
Johnson, R.V.2
-
17
-
-
0043032637
-
Characteristics of optimal workload allocation for closed queueing networks
-
H.F. Lee, M.M. Srinivasan, and C.A. Yano Characteristics of optimal workload allocation for closed queueing networks Performance Evaluation 12 1991 255 268
-
(1991)
Performance Evaluation
, vol.12
, pp. 255-268
-
-
Lee, H.F.1
Srinivasan, M.M.2
Yano, C.A.3
-
18
-
-
0002965016
-
An integrated design support method for flexible assembly systems
-
H.F. Lee, and K.E. Stecke An integrated design support method for flexible assembly systems J. Manuf. Systems 15 1 1996 13 32
-
(1996)
J. Manuf. Systems
, vol.15
, Issue.1
, pp. 13-32
-
-
Lee, H.F.1
Stecke, K.E.2
-
20
-
-
0030147766
-
Throughput for production lines with serial work stations and parallel service facilities
-
DOI 10.1016/0166-5316(95)00005-4
-
M.J. Magazine, and K.E. Stecke Throughput for production lines with serial work stations and parallel service facilities Performance Evaluation 25 1996 211 232 (Pubitemid 126400405)
-
(1996)
Performance Evaluation
, vol.25
, Issue.3
, pp. 211-232
-
-
Magazine, M.J.1
Stecke, K.E.2
-
21
-
-
0000436404
-
Finding optimal line balances with OptPack
-
F.J. Nourie, and E.R. Venta Finding optimal line balances with OptPack Oper. Res. Lett. 10 1991 165 171
-
(1991)
Oper. Res. Lett.
, vol.10
, pp. 165-171
-
-
Nourie, F.J.1
Venta, E.R.2
-
22
-
-
0031677329
-
Assembly system design: A branch and cut approach
-
A. Pinnoi, and W.E. Wilhelm Assembly system design: a branch and cut approach Management Sci. 44 1 1998 103 118 (Pubitemid 128569645)
-
(1998)
Management Science
, vol.44
, Issue.1
, pp. 103-118
-
-
Pinnoi, A.1
Wilhelm, W.E.2
-
23
-
-
0000396642
-
Branch and bound and heuristic procedures for assembly line balancing with paralleling of stations
-
P. Pinto, D.G. Dannenbring, and B.M. Khumawala Branch and bound and heuristic procedures for assembly line balancing with paralleling of stations Internat. J. Production Res. 19 5 1981 565 576
-
(1981)
Internat. J. Production Res.
, vol.19
, Issue.5
, pp. 565-576
-
-
Pinto, P.1
Dannenbring, D.G.2
Khumawala, B.M.3
-
26
-
-
0001193704
-
SALOME: A bidirectional branch-and-bound procedure for assembly line balancing
-
A. Scholl, and R. Klein SALOME: a bidirectional branch-an-bound procedure for assembly line balancing INFORMS J. Comput. 9 1997 319 334 (Pubitemid 127697778)
-
(1997)
INFORMS Journal on Computing
, vol.9
, Issue.4
, pp. 319-334
-
-
Scholl, A.1
Klein, R.2
-
27
-
-
0017972181
-
Dynamic programming solution of sequencing problems with precedence constraints
-
L. Schrage, and K.R. Baker Dynamic programming solution of sequencing problems with precedence constraints Oper. Res. 26 1978 444 449 (Pubitemid 8611378)
-
(1978)
Operations Research
, vol.26
, Issue.3
, pp. 444-449
-
-
Schrage Linus1
Baker Kenneth, R.2
-
29
-
-
0020116655
-
Assembly line balancing as generalized bin packing
-
T.S. Wee, and M.J. Magazine Assembly line balancing as generalized bin packing Operations Research Lett. 1 1982 56 58
-
(1982)
Operations Research Lett.
, vol.1
, pp. 56-58
-
-
Wee, T.S.1
Magazine, M.J.2
|