|
Volumn 32, Issue 2, 1997, Pages 321-332
|
A heuristic for an assembly line balancing problem with incompatibility, range, and partial precedence constraints
a a b |
Author keywords
[No Author keywords available]
|
Indexed keywords
ALGORITHMS;
COMPUTATIONAL COMPLEXITY;
COMPUTATIONAL METHODS;
CONSTRAINT THEORY;
ELECTRONIC EQUIPMENT MANUFACTURE;
GRAPHICAL USER INTERFACES;
HEURISTIC METHODS;
PRODUCTION CONTROL;
SCHEDULING;
ASSEMBLY LINE BALANCING;
COMPUTER AIDED MANUFACTURING;
|
EID: 0031122267
PISSN: 03608352
EISSN: None
Source Type: Journal
DOI: 10.1016/s0360-8352(96)00301-4 Document Type: Article |
Times cited : (33)
|
References (11)
|