메뉴 건너뛰기




Volumn 16, Issue 3, 2015, Pages 1274-1284

A review of online dynamic models and algorithms for railway traffic management

Author keywords

Delay propagation; dynamic systems; railway traffic management; train rescheduling

Indexed keywords

ALGORITHMS; DYNAMICAL SYSTEMS; RAILROADS; SCHEDULING; SOCIAL NETWORKING (ONLINE); STOCHASTIC SYSTEMS; TRANSPORTATION;

EID: 85027957658     PISSN: 15249050     EISSN: None     Source Type: Journal    
DOI: 10.1109/TITS.2014.2358392     Document Type: Article
Times cited : (194)

References (82)
  • 1
    • 84870243337 scopus 로고    scopus 로고
    • Rescheduling rail networks with maintenance disruptions using problem space search
    • Mar.
    • A. R. Albrecht, D. M. Panton, and D. H. Lee, "Rescheduling rail networks with maintenance disruptions using problem space search," Comput. Oper. Res., vol. 40, no. 3, pp. 703-712, Mar. 2013.
    • (2013) Comput. Oper. Res. , vol.40 , Issue.3 , pp. 703-712
    • Albrecht, A.R.1    Panton, D.M.2    Lee, D.H.3
  • 2
    • 84881065708 scopus 로고    scopus 로고
    • An overview on real-time speed control in rail-bound public transportation systems
    • Leuven, Belgium
    • T. Albrecht, A. Binder, and C. Gassel, "An overview on real-time speed control in rail-bound public transportation systems," in Proc. 2nd Int. Conf. Models Technol. ITS, Leuven, Belgium, 2011, pp. 1-4.
    • (2011) Proc. 2nd Int. Conf. Models Technol. ITS , pp. 1-4
    • Albrecht, T.1    Binder, A.2    Gassel, C.3
  • 3
    • 84870238126 scopus 로고    scopus 로고
    • On-line reschedule optimization for passenger railways in case of emergencies
    • Mar.
    • M. Almodóvar and R. García-Ródenas, "On-line reschedule optimization for passenger railways in case of emergencies," Comput. Oper. Res., vol. 40, no. 3, pp. 725-736, Mar. 2013.
    • (2013) Comput. Oper. Res. , vol.40 , Issue.3 , pp. 725-736
    • Almodóvar, M.1    García-Ródenas, R.2
  • 4
    • 84899790526 scopus 로고    scopus 로고
    • Rules of thumb: Practical online-strategies for delay management
    • Jan.
    • R. Bauer and A. Schöbel, "Rules of thumb: Practical online-strategies for delay management," Public Transp., vol. 6, no. 1/2, pp. 85-105, Jan. 2014.
    • (2014) Public Transp. , vol.6 , Issue.1-2 , pp. 85-105
    • Bauer, R.1    Schöbel, A.2
  • 6
    • 84887082868 scopus 로고    scopus 로고
    • The dispatching problem on multitrack territories: Heuristic approaches based on mixed integer linear programming
    • Dec.
    • M. Boccia, C. Mannino, and I. Vasliyev, "The dispatching problem on multitrack territories: Heuristic approaches based on mixed integer linear programming," Networks, vol. 62, no. 4, pp. 315-326, Dec. 2013.
    • (2013) Networks , vol.62 , Issue.4 , pp. 315-326
    • Boccia, M.1    Mannino, C.2    Vasliyev, I.3
  • 7
    • 77955925115 scopus 로고    scopus 로고
    • Rescheduling in passenger railways: The rolling stock rebalancing problem
    • Jun.
    • G. Budai, G. Maróti, R. Dekker, D. Huisman, and L. G. Kroon, "Rescheduling in passenger railways: The rolling stock rebalancing problem," J. Scheduling, vol. 13, no. 3, pp. 281-297, Jun. 2010.
    • (2010) J. Scheduling , vol.13 , Issue.3 , pp. 281-297
    • Budai, G.1    Maróti, G.2    Dekker, R.3    Huisman, D.4    Kroon, L.G.5
  • 9
    • 84859705420 scopus 로고    scopus 로고
    • A model predictive control approach for discrete-time rescheduling in complex, central railway station areas
    • Nov.
    • G. Caimi, M. Fuchsberger, M. Laumanns, and M. Lüthi, "A model predictive control approach for discrete-time rescheduling in complex, central railway station areas," Comput. Oper. Res., vol. 39, no. 11, pp. 2578-2593, Nov. 2012.
    • (2012) Comput. Oper. Res. , vol.39 , Issue.11 , pp. 2578-2593
    • Caimi, G.1    Fuchsberger, M.2    Laumanns, M.3    Lüthi, M.4
  • 10
    • 0031594060 scopus 로고    scopus 로고
    • Optimizing scheduled times, allowing for behavioral response
    • Jun.
    • M. Carey, "Optimizing scheduled times, allowing for behavioral response," Transp. Res. B, Methodol., vol. 32, no. 5, pp. 329-342, Jun. 1998.
    • (1998) Transp. Res. B, Methodol. , vol.32 , Issue.5 , pp. 329-342
    • Carey, M.1
  • 11
    • 0028481461 scopus 로고
    • Stochastic approximation to the effects of headways on knock-on delays of trains
    • Aug.
    • M. Carey and A. Kwiecinski, "Stochastic approximation to the effects of headways on knock-on delays of trains," Transp. Res. B, Methodol., vol. 28, no. 4, pp. 251-267, Aug. 1994.
    • (1994) Transp. Res. B, Methodol. , vol.28 , Issue.4 , pp. 251-267
    • Carey, M.1    Kwiecinski, A.2
  • 12
    • 0032050958 scopus 로고    scopus 로고
    • Hybrid simulation for resolving resource conflicts in train traffic rescheduling
    • Apr.
    • Y. Cheng, "Hybrid simulation for resolving resource conflicts in train traffic rescheduling," Comput. Ind., vol. 35, no. 3, pp. 233-246, Apr. 1998.
    • (1998) Comput. Ind. , vol.35 , Issue.3 , pp. 233-246
    • Cheng, Y.1
  • 14
    • 0032203702 scopus 로고    scopus 로고
    • A survey of optimization models for train routing and scheduling
    • Nov.
    • J. F. Cordeau, P. Toth, and D. Vigo, "A survey of optimization models for train routing and scheduling," Transp. Sci., vol. 32, no. 4, pp. 380-404, Nov. 1998.
    • (1998) Transp. Sci. , vol.32 , Issue.4 , pp. 380-404
    • Cordeau, J.F.1    Toth, P.2    Vigo, D.3
  • 16
    • 79958004969 scopus 로고    scopus 로고
    • Effectiveness of dynamic reordering and rerouting of trains in a complicated and densely occupied station area
    • May
    • F. Corman, A. D'Ariano, M. Pranzo, and I. A. Hansen, "Effectiveness of dynamic reordering and rerouting of trains in a complicated and densely occupied station area," Transp. Planning Technol., vol. 34, no. 4, pp. 341-362, May 2011.
    • (2011) Transp. Planning Technol. , vol.34 , Issue.4 , pp. 341-362
    • Corman, F.1    D'Ariano, A.2    Pranzo, M.3    Hansen, I.A.4
  • 17
    • 84893289108 scopus 로고    scopus 로고
    • Robustness and delay reduction of advanced train dispatching solutions under disturbances
    • Lisboa, Portugal
    • F. Corman, A. D'Ariano, G. Longo, and G. Medeossi, "Robustness and delay reduction of advanced train dispatching solutions under disturbances," in Proc. 12th World Conf. Transp. Res., Lisboa, Portugal, 2010, pp. 1-12.
    • (2010) Proc. 12th World Conf. Transp. Res. , pp. 1-12
    • Corman, F.1    D'Ariano, A.2    Longo, G.3    Medeossi, G.4
  • 20
    • 69249202566 scopus 로고    scopus 로고
    • Evaluation of green wave policy in real-time rail traffic management
    • Dec.
    • F. Corman, A. D'Ariano, D. Pacciarelli, and M. Pranzo, "Evaluation of green wave policy in real-time rail traffic management," Transp. Res. C, Emerging Technol., vol. 17, no. 6, pp. 607-616, Dec. 2009.
    • (2009) Transp. Res. C, Emerging Technol. , vol.17 , Issue.6 , pp. 607-616
    • Corman, F.1    D'Ariano, A.2    Pacciarelli, D.3    Pranzo, M.4
  • 21
    • 85028221397 scopus 로고    scopus 로고
    • Analysis on differences of railway CTC system in China and foreign countries
    • (Chinese) Apr.
    • Y. P. Cui and H. Zhuang, "Analysis on differences of railway CTC system in China and foreign countries," (in Chinese), Railway Transp. Econom., vol. 35, no. 4, pp. 16-21, Apr. 2013.
    • (2013) Railway Transp. Econom. , vol.35 , Issue.4 , pp. 16-21
    • Cui, Y.P.1    Zhuang, H.2
  • 22
    • 36148994764 scopus 로고    scopus 로고
    • Running time re-optimization during realtime timetable perturbations
    • Southampton, U.K. WIT Press
    • A. D'Ariano and T. Albrecht, "Running time re-optimization during realtime timetable perturbations," in WIT Transactions on the Built Environment, vol. 88. Southampton, U.K.: WIT Press, 2006, pp. 531-540.
    • (2006) WIT Transactions on the Built Environment , vol.88 , pp. 531-540
    • D'Ariano, A.1    Albrecht, T.2
  • 23
    • 59749089450 scopus 로고    scopus 로고
    • An advanced real-time train dispatching system for minimizing the propagation of delays in a dispatching area under severe disturbances
    • Mar.
    • A. D'Ariano and M. Pranzo, "An advanced real-time train dispatching system for minimizing the propagation of delays in a dispatching area under severe disturbances," Netw. Spatial Econ., vol. 9, no. 1, pp. 63-84, Mar. 2009.
    • (2009) Netw. Spatial Econ. , vol.9 , Issue.1 , pp. 63-84
    • D'Ariano, A.1    Pranzo, M.2
  • 24
    • 84894028235 scopus 로고    scopus 로고
    • Improving the robustness in railway station areas
    • May
    • T. Dewilde, P. Sels, P. Cattrysse, and P. Vanteenwegen, "Improving the robustness in railway station areas," Eur. J. Oper. Res., vol. 235, no. 1, pp. 276-286, May 2014.
    • (2014) Eur. J. Oper. Res. , vol.235 , Issue.1 , pp. 276-286
    • Dewilde, T.1    Sels, P.2    Cattrysse, P.3    Vanteenwegen, P.4
  • 25
    • 0039258445 scopus 로고    scopus 로고
    • On-line timetable rescheduling in regional train services
    • Aug.
    • A. Diaz, M. O. Gonzalez, and P. Gonzalez-Torre, "On-line timetable rescheduling in regional train services," Transp. Res. B, Methodol., vol. 33, no. 6, pp. 387-398, Aug. 1999.
    • (1999) Transp. Res. B, Methodol. , vol.33 , Issue.6 , pp. 387-398
    • Diaz, A.1    Gonzalez, M.O.2    Gonzalez-Torre, P.3
  • 26
  • 27
    • 84912041490 scopus 로고    scopus 로고
    • An iterative optimization framework for delay management and train scheduling
    • 1007/510696-013-9187-2
    • T. Dollevoet, F. Corman, A. D'Ariano, and D. Huisman, "An iterative optimization framework for delay management and train scheduling," Flexible Serv. Manuf. J., pp. 1-26, DOI: 1007/510696-013-9187-2.
    • Flexible Serv. Manuf. J. , pp. 1-26
    • Dollevoet, T.1    Corman, F.2    D'Ariano, A.3    Huisman, D.4
  • 28
    • 84894309347 scopus 로고    scopus 로고
    • RCS-Rail Control System. Real-time train run simulation and conflict detection on a netwide scale based on updated train positions
    • Zürich, Switzerland
    • U. Dolder, M. Krista, and M. Voelcker, "RCS-Rail Control System. Real-time train run simulation and conflict detection on a netwide scale based on updated train positions," in Proc. 3rd Int. Conf. Railway Oper. Modelling Anal. RailZurich, Zürich, Switzerland, 2009, pp. 1-15.
    • (2009) Proc. 3rd Int. Conf. Railway Oper. Modelling Anal. RailZurich , pp. 1-15
    • Dolder, U.1    Krista, M.2    Voelcker, M.3
  • 29
    • 0142156064 scopus 로고    scopus 로고
    • Scheduling trains on a railway network using a discrete event model of railway traffic
    • Jan.
    • M. J. Dorfman and J. Medanic, "Scheduling trains on a railway network using a discrete event model of railway traffic," Transp. Res. B, Methodol., vol. 38, no. 1, pp. 81-98, Jan. 2004.
    • (2004) Transp. Res. B, Methodol. , vol.38 , Issue.1 , pp. 81-98
    • Dorfman, M.J.1    Medanic, J.2
  • 30
    • 84888432721 scopus 로고    scopus 로고
    • A demand-based weighted train delay approach for rescheduling railway networks in real time
    • Feb.-May
    • J. L. Espinosa-Aranda and R. García-Ródenas, "A demand-based weighted train delay approach for rescheduling railway networks in real time," J. Rail Transp. Planning Manage., vol. 3, no. 1/2, pp. 1-13, Feb.-May 2013.
    • (2013) J. Rail Transp. Planning Manage. , vol.3 , Issue.1-2 , pp. 1-13
    • Espinosa-Aranda, J.L.1    García-Ródenas, R.2
  • 32
  • 33
    • 40849124003 scopus 로고    scopus 로고
    • Optimization models for the delay management problem in public transportation
    • Sep.
    • L. D. Giovanni, G. Heilporn, and M. Labbé, "Optimization models for the delay management problem in public transportation," Eur. J. Oper. Res., vol. 189, no. 3, pp. 762-774, Sep. 2008.
    • (2008) Eur. J. Oper. Res. , vol.189 , Issue.3 , pp. 762-774
    • Giovanni, L.D.1    Heilporn, G.2    Labbé, M.3
  • 34
    • 77952289414 scopus 로고    scopus 로고
    • A delay propagation algorithm for large-scale railway traffic networks
    • Jun.
    • R. M. P. Goverde, "A delay propagation algorithm for large-scale railway traffic networks," Transp. Res. C, Emerging Technol., vol. 18, no. 3, pp. 269-287, Jun. 2010.
    • (2010) Transp. Res. C, Emerging Technol. , vol.18 , Issue.3 , pp. 269-287
    • Goverde, R.M.P.1
  • 35
    • 83755173831 scopus 로고    scopus 로고
    • Energy saving for automatic train control in moving block signaling system
    • USA
    • Q. Gu, X. Lu, and T. Tang, "Energy saving for automatic train control in moving block signaling system," in Proc. 14th Int. IEEE Conf. Intell. Transp. Syst., USA, 2011, pp. 1305-1310.
    • (2011) Proc. 14th Int. IEEE Conf. Intell. Transp. Syst. , pp. 1305-1310
    • Gu, Q.1    Lu, X.2    Tang, T.3
  • 36
    • 0035413693 scopus 로고    scopus 로고
    • Simultaneous vehicle and crew scheduling in urban mass transit systems
    • Aug.
    • K. Haase, G. Desaulniers, and J. Desrosiers, "Simultaneous vehicle and crew scheduling in urban mass transit systems," Transp. Sci., vol. 35, no. 3, pp. 286-303, Aug. 2001.
    • (2001) Transp. Sci. , vol.35 , Issue.3 , pp. 286-303
    • Haase, K.1    Desaulniers, G.2    Desrosiers, J.3
  • 38
    • 79951897217 scopus 로고    scopus 로고
    • Modeling network transition constraints with hypergraphs
    • Feb.
    • S. Harrod, "Modeling network transition constraints with hypergraphs," Transp. Sci., vol. 45, no. 1, pp. 81-97, Feb. 2011.
    • (2011) Transp. Sci. , vol.45 , Issue.1 , pp. 81-97
    • Harrod, S.1
  • 39
  • 40
    • 33644681577 scopus 로고    scopus 로고
    • A solution approach for dynamic vehicle and crew scheduling
    • Jul.
    • D. Huisman and A. P. M. Wagelmans, "A solution approach for dynamic vehicle and crew scheduling," Eur. J. Oper. Res., vol. 172, no. 2, pp. 453-471, Jul. 2006.
    • (2006) Eur. J. Oper. Res. , vol.172 , Issue.2 , pp. 453-471
    • Huisman, D.1    Wagelmans, A.P.M.2
  • 41
    • 0035521192 scopus 로고    scopus 로고
    • Predictive and reactive approaches to the train-scheduling problem: A knowledge management perspective
    • Nov.
    • M. T. Isaai and N. P. Cassaigne, "Predictive and reactive approaches to the train-scheduling problem: A knowledge management perspective," IEEE Trans. Syst., Man, Cybern. C, Appl. Rev., vol. 31, no. 4, pp. 476-484, Nov. 2001.
    • (2001) IEEE Trans. Syst., Man, Cybern. C, Appl. Rev. , vol.31 , Issue.4 , pp. 476-484
    • Isaai, M.T.1    Cassaigne, N.P.2
  • 43
    • 0029250003 scopus 로고
    • DARYN-A distributed decision-making algorithm for railway networks: Modeling and simulation
    • Feb.
    • R. V. Iyer and S. Ghosh, "DARYN-A distributed decision-making algorithm for railway networks: Modeling and simulation," IEEE Trans. Veh. Technol., vol. 44, no. 1, pp. 180-191, Feb. 1995.
    • (1995) IEEE Trans. Veh. Technol. , vol.44 , Issue.1 , pp. 180-191
    • Iyer, R.V.1    Ghosh, S.2
  • 44
    • 34249902848 scopus 로고    scopus 로고
    • Reducing delays by means of computer-aided 'on-The-spot' rescheduling
    • Southampton, U.K. WIT Press
    • J. Jacobs, "Reducing delays by means of computer-aided 'on-the-spot' rescheduling," in Computers in Railways IX. Southampton, U.K.: WIT Press, 2004.
    • (2004) Computers in Railways IX
    • Jacobs, J.1
  • 45
    • 77956302319 scopus 로고    scopus 로고
    • Disruption management in passenger railway transportation
    • Berlin, Germany: Springer- Verlag
    • J. Jespersen-Groth et al., "Disruption management in passenger railway transportation," in Lecture Notes in Computer Science, vol. 5868. Berlin, Germany: Springer-Verlag, 2009, pp. 399-421.
    • (2009) Lecture Notes in Computer Science , vol.5868 , pp. 399-421
    • Jespersen-Groth, J.1
  • 46
    • 85028222446 scopus 로고    scopus 로고
    • Optimal reinsertion of cancelled train lines
    • Tech. Univ. Denmark, Lyngby, Denmark
    • J. Jespersen-Groth and J. Clausen, "Optimal reinsertion of cancelled train lines," Informat. Math. Modelling, Tech. Univ. Denmark, Lyngby, Denmark, 2006.
    • (2006) Informat. Math. Modelling
    • Jespersen-Groth, J.1    Clausen, J.2
  • 49
    • 77649271726 scopus 로고    scopus 로고
    • Slack time allocation in robust double-track train timetabling applications
    • Mar.
    • M. B. Khan and X. Zhou, "Slack time allocation in robust double-track train timetabling applications," IEEE Trans. Intell. Transp. Syst., vol. 11, no. 1, pp. 81-89, Mar. 2010.
    • (2010) IEEE Trans. Intell. Transp. Syst. , vol.11 , Issue.1 , pp. 81-89
    • Khan, M.B.1    Zhou, X.2
  • 50
    • 78650137333 scopus 로고    scopus 로고
    • A note on the online nature of the railway delay management problem
    • Mar.
    • N. Kliewer and L. Suhl, "A note on the online nature of the railway delay management problem," Networks, vol. 57, no. 1, pp. 28-37, Mar. 2010.
    • (2010) Networks , vol.57 , Issue.1 , pp. 28-37
    • Kliewer, N.1    Suhl, L.2
  • 51
    • 34748853876 scopus 로고    scopus 로고
    • Application of dynamic programming to optimization of running profile of a train
    • Southampton, U.K WIT Press
    • H. Ko, T. Koseki, and M. Miyatake, "Application of dynamic programming to optimization of running profile of a train," in Computers in Railways IX. Southampton, U.K: WIT Press, 2004.
    • (2004) Computers in Railways IX
    • Ko, H.1    Koseki, T.2    Miyatake, M.3
  • 52
    • 67649977016 scopus 로고    scopus 로고
    • The new Dutch timetable: The or revolution
    • Jan./Feb.
    • L. G. Kroon et al., "The new Dutch timetable: The OR revolution," Interfaces, vol. 39, no. 1, pp. 6-17, Jan./Feb. 2009.
    • (2009) Interfaces , vol.39 , Issue.1 , pp. 6-17
    • Kroon, L.G.1
  • 53
    • 79955709136 scopus 로고    scopus 로고
    • A proposal of autonomous online expansion technology for real-time system and its application to railway signalling system
    • T. Kunifuji, H. Ito, Y. Saimi, and K. Mori, "A proposal of autonomous online expansion technology for real-time system and its application to railway signalling system," in Proc. 10th Int. Symp. Auton. Decentralized Syst., 2011, pp. 73-80.
    • (2011) Proc. 10th Int. Symp. Auton. Decentralized Syst. , pp. 73-80
    • Kunifuji, T.1    Ito, H.2    Saimi, Y.3    Mori, K.4
  • 54
    • 84912051240 scopus 로고    scopus 로고
    • Susceptibility of optimal train schedules to stochastic disturbances of process times
    • R. Larsen, M. Pranzo, A. D'Ariano, D. Pacciarelli, and F. Corman, "Susceptibility of optimal train schedules to stochastic disturbances of process times," Flexible Serv. Manuf. J., pp. 1-26, DOI: 10.1007/s10696-013-9187-2.
    • Flexible Serv. Manuf. J. , pp. 1-26
    • Larsen, R.1    Pranzo, M.2    D'Ariano, A.3    Pacciarelli, D.4    Corman, F.5
  • 55
    • 0035038348 scopus 로고    scopus 로고
    • Stability of RYNSORD: A decentralized algorithm for railway networks under perturbation
    • Jan.
    • T. S. Lee and S. Ghosh, "Stability of RYNSORD: A decentralized algorithm for railway networks under perturbation," IEEE Trans. Veh. Technol., vol. 50, no. 1, pp. 287-301, Jan. 2001.
    • (2001) IEEE Trans. Veh. Technol. , vol.50 , Issue.1 , pp. 287-301
    • Lee, T.S.1    Ghosh, S.2
  • 57
    • 69949109733 scopus 로고    scopus 로고
    • Real-time traffic control in metro stations
    • Jul./Aug.
    • C. Mannino and A. Mascis, "Real-time traffic control in metro stations," Oper. Res., vol. 57, no. 4, pp. 1026-1039, Jul./Aug. 2009.
    • (2009) Oper. Res. , vol.57 , Issue.4 , pp. 1026-1039
    • Mannino, C.1    Mascis, A.2
  • 58
    • 53749098943 scopus 로고    scopus 로고
    • Scheduling models for shortterm railway traffic optimization
    • Berlin, Germany: Springer- Verlag ser. Lecture Notes in Economics and Mathematical Systems
    • A. Mascis, D. Pacciarelli, and M. Pranzo, "Scheduling models for shortterm railway traffic optimization," in Computer-aided Systems in Public Transport, vol. 600. Berlin, Germany: Springer-Verlag, 2008, ser. Lecture Notes in Economics and Mathematical Systems, pp. 71-90.
    • (2008) Computer-aided Systems in Public Transport , vol.600 , pp. 71-90
    • Mascis, A.1    Pacciarelli, D.2    Pranzo, M.3
  • 59
    • 33748698838 scopus 로고    scopus 로고
    • A traffic management system for real-time traffic optimization in railways
    • Feb.
    • M. Mazzarello and E. Ottaviani, "A traffic management system for real-time traffic optimization in railways," Transp. Res. B, Methodol., vol. 41, no. 2, pp. 246-274, Feb. 2007.
    • (2007) Transp. Res. B, Methodol. , vol.41 , Issue.2 , pp. 246-274
    • Mazzarello, M.1    Ottaviani, E.2
  • 60
    • 79959808568 scopus 로고    scopus 로고
    • Robust single-track train dispatching model under a dynamic and stochastic environment: A scenario-based rolling horizon approach
    • Aug.
    • L. Meng and X. Zhou, "Robust single-track train dispatching model under a dynamic and stochastic environment: A scenario-based rolling horizon approach," Transp. Res. B, Methodol., vol. 45, no. 7, pp. 1080-1102, Aug. 2011.
    • (2011) Transp. Res. B, Methodol. , vol.45 , Issue.7 , pp. 1080-1102
    • Meng, L.1    Zhou, X.2
  • 61
    • 84902346437 scopus 로고    scopus 로고
    • Simultaneous train rerouting and rescheduling on an N-track network: A model reformulation with network-based cumulative flow variables
    • Sep.
    • L. Meng and X. Zhou, "Simultaneous train rerouting and rescheduling on an N-track network: A model reformulation with network-based cumulative flow variables," Transp. Res. B, Methodol., vol. 67, pp. 208-234, Sep. 2014.
    • (2014) Transp. Res. B, Methodol. , vol.67 , pp. 208-234
    • Meng, L.1    Zhou, X.2
  • 62
    • 79959786879 scopus 로고    scopus 로고
    • Scheduling freight trains traveling on complex networks
    • Aug.
    • S. Mu and M. Dessouky, "Scheduling freight trains traveling on complex networks," Transp. Res. B, Methodol., vol. 45, no. 7, pp. 1103-1123, Aug. 2011.
    • (2011) Transp. Res. B Methodol. , vol.45 , Issue.7 , pp. 1103-1123
    • Mu, S.1    Dessouky, M.2
  • 63
    • 84891122548 scopus 로고    scopus 로고
    • Scheduling and rescheduling of railway operations: A review and expository analysis
    • Dec.
    • S. Narayanaswami and N. Rangaraj, "Scheduling and rescheduling of railway operations: A review and expository analysis," Technol. Oper. Manage., vol. 2, no. 2, pp. 102-122, Dec. 2011.
    • (2011) Technol. Oper. Manage. , vol.2 , Issue.2 , pp. 102-122
    • Narayanaswami, S.1    Rangaraj, N.2
  • 64
    • 84859796707 scopus 로고    scopus 로고
    • A rolling horizon approach for disruption management of railway rolling stock
    • Jul.
    • L. K. Nielsen, L. Kroon, and G. Maróti, "A rolling horizon approach for disruption management of railway rolling stock," Eur. J. Oper. Res., vol. 220, no. 2, pp. 496-509, Jul. 2012.
    • (2012) Eur. J. Oper. Res. , vol.220 , Issue.2 , pp. 496-509
    • Nielsen, L.K.1    Kroon, L.2    Maróti, G.3
  • 67
    • 85028232351 scopus 로고    scopus 로고
    • Railway capacity optimization by integration of real-time rescheduling and automatic train operation
    • Zürich, Switzerland
    • X. Rao, M. Montigel, and U. Weidmann, "Railway capacity optimization by integration of real-time rescheduling and automatic train operation," in Proc. IT Rail, Zürich, Switzerland, 2013, pp. 1-12.
    • (2013) Proc. IT Rail , pp. 1-12
    • Rao, X.1    Montigel, M.2    Weidmann, U.3
  • 68
    • 84901007306 scopus 로고    scopus 로고
    • Stability analysis of railway dispatching plans in a stochastic and dynamic environment
    • Nov.
    • E. Quaglietta, F. Corman, and R. M. P. Goverde, "Stability analysis of railway dispatching plans in a stochastic and dynamic environment," J. Rail Transp. Planning Manage., vol. 3, no. 4, pp. 137-149, Nov. 2013.
    • (2013) J. Rail Transp. Planning Manage. , vol.3 , Issue.4 , pp. 137-149
    • Quaglietta, E.1    Corman, F.2    Goverde, R.M.P.3
  • 69
    • 0032884348 scopus 로고    scopus 로고
    • Railway traffic control and train scheduling based on intertrain conflict management
    • Sep.
    • I. Sahin, "Railway traffic control and train scheduling based on intertrain conflict management," Transp. Res. B, Methodol., vol. 33, no. 7, pp. 511-534, Sep. 1999.
    • (1999) Transp. Res. B, Methodol. , vol.33 , Issue.7 , pp. 511-534
    • Sahin, I.1
  • 71
    • 36448977879 scopus 로고    scopus 로고
    • Railway traffic disturbance management-An experimental analysis of disturbance complexity, management objectives and limitations in planning horizon
    • Mar.
    • J. Törnquist, "Railway traffic disturbance management-An experimental analysis of disturbance complexity, management objectives and limitations in planning horizon," Transp. Res. A, Pol. Pract., vol. 41, no. 3, pp. 249-266, Mar. 2007.
    • (2007) Transp. Res. A, Pol. Pract. , vol.41 , Issue.3 , pp. 249-266
    • Törnquist, J.1
  • 74
    • 0025472092 scopus 로고
    • A distributed intelligent methodology for railway traffic control
    • Aug.
    • G. Vernazza and R. Zunino, "A distributed intelligent methodology for railway traffic control," IEEE Trans. Veh. Technol., vol. 39, no. 3, pp. 263-270, Aug. 1990.
    • (1990) IEEE Trans. Veh. Technol. , vol.39 , Issue.3 , pp. 263-270
    • Vernazza, G.1    Zunino, R.2
  • 75
    • 33644679955 scopus 로고    scopus 로고
    • Reliability and heterogeneity of railway services
    • Jul.
    • M. Vromans, R. Dekker, and L. G. Kroon, "Reliability and heterogeneity of railway services," Eur. J. Oper. Res., vol. 172, no. 2, pp. 647-665, Jul. 2006.
    • (2006) Eur. J. Oper. Res. , vol.172 , Issue.2 , pp. 647-665
    • Vromans, M.1    Dekker, R.2    Kroon, L.G.3
  • 76
    • 79952406435 scopus 로고    scopus 로고
    • Real-time train scheduling and control based on model predictive control
    • Wuhan, China
    • P. Wang, Y. Zhou, J. Chen, Y. Wang, and P. Wu, "Real-time train scheduling and control based on model predictive control," in Proc. 2nd WRI Global Congr. Intell. Syst., Wuhan, China, 2010, pp. 47-50.
    • (2010) Proc. 2nd WRI Global Congr. Intell. Syst. , pp. 47-50
    • Wang, P.1    Zhou, Y.2    Chen, J.3    Wang, Y.4    Wu, P.5
  • 77
    • 85028198362 scopus 로고    scopus 로고
    • Sustainable global service intention as objective for controlling railway network operations in real time
    • Seoul, Korea
    • R. Wuest, F. Laube, S. Roos, and G. Caimi, "Sustainable global service intention as objective for controlling railway network operations in real time," in Proc. 8th World Congr. Railway Res., Seoul, Korea, 2008, pp. 1-13.
    • (2008) Proc. 8th World Congr. Railway Res. , pp. 1-13
    • Wuest, R.1    Laube, F.2    Roos, S.3    Caimi, G.4
  • 78
    • 84930969977 scopus 로고    scopus 로고
    • Mixed-integer programming based approaches for the movement planner problem: Model, heuristics and decomposition
    • Phoenix, AZ, USA First Prize Winner
    • C. Yan and L. Yang, "Mixed-integer programming based approaches for the movement planner problem: Model, heuristics and decomposition," INFORMS RAS Problem Solving Competition, Phoenix, AZ, USA, 2012, First Prize Winner.
    • (2012) INFORMS RAS Problem Solving Competition
    • Yan, C.1    Yang, L.2
  • 80
    • 33748706761 scopus 로고    scopus 로고
    • Optimizing capacity utilization of stations by estimating knock-on train delays
    • Feb.
    • J. Yuan and I. A. Hansen, "Optimizing capacity utilization of stations by estimating knock-on train delays," Transp. Res. B, Methodol., vol. 41, no. 2, pp. 202-217, Feb. 2007.
    • (2007) Transp. Res. B, Methodol. , vol.41 , Issue.2 , pp. 202-217
    • Yuan, J.1    Hansen, I.A.2
  • 81
    • 33845274298 scopus 로고    scopus 로고
    • Single-track train timetabling with guaranteed optimality: Branch-and-bound algorithms with enhanced lower bounds
    • Mar.
    • X. Zhou and M. Zhong, "Single-track train timetabling with guaranteed optimality: Branch-and-bound algorithms with enhanced lower bounds," Transp. Res. B, Methodol., vol. 41, no. 3, pp. 320-341, Mar. 2007.
    • (2007) Transp. Res. B, Methodol. , vol.41 , Issue.3 , pp. 320-341
    • Zhou, X.1    Zhong, M.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.