-
1
-
-
84870243337
-
Rescheduling rail networks with maintenance disruptions using problem space search
-
Mar.
-
A. R. Albrecht, D. M. Panton, and D. H. Lee, "Rescheduling rail networks with maintenance disruptions using problem space search," Comput. Oper. Res., vol. 40, no. 3, pp. 703-712, Mar. 2013.
-
(2013)
Comput. Oper. Res.
, vol.40
, Issue.3
, pp. 703-712
-
-
Albrecht, A.R.1
Panton, D.M.2
Lee, D.H.3
-
2
-
-
84881065708
-
An overview on real-time speed control in rail-bound public transportation systems
-
Leuven, Belgium
-
T. Albrecht, A. Binder, and C. Gassel, "An overview on real-time speed control in rail-bound public transportation systems," in Proc. 2nd Int. Conf. Models Technol. ITS, Leuven, Belgium, 2011, pp. 1-4.
-
(2011)
Proc. 2nd Int. Conf. Models Technol. ITS
, pp. 1-4
-
-
Albrecht, T.1
Binder, A.2
Gassel, C.3
-
3
-
-
84870238126
-
On-line reschedule optimization for passenger railways in case of emergencies
-
Mar.
-
M. Almodóvar and R. García-Ródenas, "On-line reschedule optimization for passenger railways in case of emergencies," Comput. Oper. Res., vol. 40, no. 3, pp. 725-736, Mar. 2013.
-
(2013)
Comput. Oper. Res.
, vol.40
, Issue.3
, pp. 725-736
-
-
Almodóvar, M.1
García-Ródenas, R.2
-
4
-
-
84899790526
-
Rules of thumb: Practical online-strategies for delay management
-
Jan.
-
R. Bauer and A. Schöbel, "Rules of thumb: Practical online-strategies for delay management," Public Transp., vol. 6, no. 1/2, pp. 85-105, Jan. 2014.
-
(2014)
Public Transp.
, vol.6
, Issue.1-2
, pp. 85-105
-
-
Bauer, R.1
Schöbel, A.2
-
5
-
-
85015025100
-
Stochastic delay prediction in large train networks
-
Saarbrücken, Germany
-
A. Berger, A. Gebhardt, M. Müller-Hannemann, and M. Ostrowski, "Stochastic delay prediction in large train networks," in Proc. 11th Workshop Algorithmic Approaches Transp. Modelling, Optim., Syst., Saarbrücken, Germany, 2011, pp. 1-12.
-
(2011)
Proc. 11th Workshop Algorithmic Approaches Transp. Modelling, Optim., Syst.
, pp. 1-12
-
-
Berger, A.1
Gebhardt, A.2
Müller-Hannemann, M.3
Ostrowski, M.4
-
6
-
-
84887082868
-
The dispatching problem on multitrack territories: Heuristic approaches based on mixed integer linear programming
-
Dec.
-
M. Boccia, C. Mannino, and I. Vasliyev, "The dispatching problem on multitrack territories: Heuristic approaches based on mixed integer linear programming," Networks, vol. 62, no. 4, pp. 315-326, Dec. 2013.
-
(2013)
Networks
, vol.62
, Issue.4
, pp. 315-326
-
-
Boccia, M.1
Mannino, C.2
Vasliyev, I.3
-
7
-
-
77955925115
-
Rescheduling in passenger railways: The rolling stock rebalancing problem
-
Jun.
-
G. Budai, G. Maróti, R. Dekker, D. Huisman, and L. G. Kroon, "Rescheduling in passenger railways: The rolling stock rebalancing problem," J. Scheduling, vol. 13, no. 3, pp. 281-297, Jun. 2010.
-
(2010)
J. Scheduling
, vol.13
, Issue.3
, pp. 281-297
-
-
Budai, G.1
Maróti, G.2
Dekker, R.3
Huisman, D.4
Kroon, L.G.5
-
8
-
-
85028221522
-
Defining efficient modelling of delay distribution functions
-
Zurich, Switzerland
-
T. Buker and E. Wendler, "Defining efficient modelling of delay distribution functions," in Proc. 3rd Int. Conf. Railway Oper. Modelling Anal. RailZurich, Zurich, Switzerland, 2009, pp. 1-21.
-
(2009)
Proc. 3rd Int. Conf. Railway Oper. Modelling Anal. RailZurich
, pp. 1-21
-
-
Buker, T.1
Wendler, E.2
-
9
-
-
84859705420
-
A model predictive control approach for discrete-time rescheduling in complex, central railway station areas
-
Nov.
-
G. Caimi, M. Fuchsberger, M. Laumanns, and M. Lüthi, "A model predictive control approach for discrete-time rescheduling in complex, central railway station areas," Comput. Oper. Res., vol. 39, no. 11, pp. 2578-2593, Nov. 2012.
-
(2012)
Comput. Oper. Res.
, vol.39
, Issue.11
, pp. 2578-2593
-
-
Caimi, G.1
Fuchsberger, M.2
Laumanns, M.3
Lüthi, M.4
-
10
-
-
0031594060
-
Optimizing scheduled times, allowing for behavioral response
-
Jun.
-
M. Carey, "Optimizing scheduled times, allowing for behavioral response," Transp. Res. B, Methodol., vol. 32, no. 5, pp. 329-342, Jun. 1998.
-
(1998)
Transp. Res. B, Methodol.
, vol.32
, Issue.5
, pp. 329-342
-
-
Carey, M.1
-
11
-
-
0028481461
-
Stochastic approximation to the effects of headways on knock-on delays of trains
-
Aug.
-
M. Carey and A. Kwiecinski, "Stochastic approximation to the effects of headways on knock-on delays of trains," Transp. Res. B, Methodol., vol. 28, no. 4, pp. 251-267, Aug. 1994.
-
(1994)
Transp. Res. B, Methodol.
, vol.28
, Issue.4
, pp. 251-267
-
-
Carey, M.1
Kwiecinski, A.2
-
12
-
-
0032050958
-
Hybrid simulation for resolving resource conflicts in train traffic rescheduling
-
Apr.
-
Y. Cheng, "Hybrid simulation for resolving resource conflicts in train traffic rescheduling," Comput. Ind., vol. 35, no. 3, pp. 233-246, Apr. 1998.
-
(1998)
Comput. Ind.
, vol.35
, Issue.3
, pp. 233-246
-
-
Cheng, Y.1
-
13
-
-
84882963402
-
Dynamic algorithms for recoverable robustness problems
-
Dagstuhl, Germany
-
S. Cicerone, G. D. Stefano, M. Schachtebeck, and A. Schöbel, "Dynamic algorithms for recoverable robustness problems," in Proc. 8th Workshop Algorithmic Approaches Transp. Modeling, Optim., Syst., Dagstuhl, Germany, 2008, pp. 1-20.
-
(2008)
Proc. 8th Workshop Algorithmic Approaches Transp. Modeling, Optim., Syst.
, pp. 1-20
-
-
Cicerone, S.1
Stefano, G.D.2
Schachtebeck, M.3
Schöbel, A.4
-
14
-
-
0032203702
-
A survey of optimization models for train routing and scheduling
-
Nov.
-
J. F. Cordeau, P. Toth, and D. Vigo, "A survey of optimization models for train routing and scheduling," Transp. Sci., vol. 32, no. 4, pp. 380-404, Nov. 1998.
-
(1998)
Transp. Sci.
, vol.32
, Issue.4
, pp. 380-404
-
-
Cordeau, J.F.1
Toth, P.2
Vigo, D.3
-
15
-
-
80054114657
-
Optimal interarea coordination of train rescheduling decisions
-
Jan.
-
F. Corman, A. D'Ariano, D. Pacciarelli, and M. Pranzo, "Optimal interarea coordination of train rescheduling decisions," Transp. Res. E, Logist. Transp. Rev., vol. 48, no. 1, pp. 71-88, Jan. 2012.
-
(2012)
Transp. Res. E, Logist. Transp. Rev.
, vol.48
, Issue.1
, pp. 71-88
-
-
Corman, F.1
D'Ariano, A.2
Pacciarelli, D.3
Pranzo, M.4
-
16
-
-
79958004969
-
Effectiveness of dynamic reordering and rerouting of trains in a complicated and densely occupied station area
-
May
-
F. Corman, A. D'Ariano, M. Pranzo, and I. A. Hansen, "Effectiveness of dynamic reordering and rerouting of trains in a complicated and densely occupied station area," Transp. Planning Technol., vol. 34, no. 4, pp. 341-362, May 2011.
-
(2011)
Transp. Planning Technol.
, vol.34
, Issue.4
, pp. 341-362
-
-
Corman, F.1
D'Ariano, A.2
Pranzo, M.3
Hansen, I.A.4
-
17
-
-
84893289108
-
Robustness and delay reduction of advanced train dispatching solutions under disturbances
-
Lisboa, Portugal
-
F. Corman, A. D'Ariano, G. Longo, and G. Medeossi, "Robustness and delay reduction of advanced train dispatching solutions under disturbances," in Proc. 12th World Conf. Transp. Res., Lisboa, Portugal, 2010, pp. 1-12.
-
(2010)
Proc. 12th World Conf. Transp. Res.
, pp. 1-12
-
-
Corman, F.1
D'Ariano, A.2
Longo, G.3
Medeossi, G.4
-
18
-
-
85028192984
-
Closing the loop in railway traffic management
-
Washington, DC, USA
-
F. Corman and E. Quaglietta, "Closing the loop in railway traffic management," in Proc. 93rd Annual Meeting of the Transportation Research Board, Washington, DC, USA, 2014, pp. 1-17.
-
(2014)
Proc. 93rd Annual Meeting of the Transportation Research Board
, pp. 1-17
-
-
Corman, F.1
Quaglietta, E.2
-
19
-
-
84895529646
-
Evaluating disturbance robustness of railway schedules
-
Jan.
-
F. Corman, A. D'Ariano, and I. A. Hansen, "Evaluating disturbance robustness of railway schedules," J. Intell. Transp. Syst., Technol., Planning, Oper., vol. 18, no. 1, pp. 106-120, Jan. 2014.
-
(2014)
J. Intell. Transp. Syst., Technol., Planning, Oper.
, vol.18
, Issue.1
, pp. 106-120
-
-
Corman, F.1
D'Ariano, A.2
Hansen, I.A.3
-
20
-
-
69249202566
-
Evaluation of green wave policy in real-time rail traffic management
-
Dec.
-
F. Corman, A. D'Ariano, D. Pacciarelli, and M. Pranzo, "Evaluation of green wave policy in real-time rail traffic management," Transp. Res. C, Emerging Technol., vol. 17, no. 6, pp. 607-616, Dec. 2009.
-
(2009)
Transp. Res. C, Emerging Technol.
, vol.17
, Issue.6
, pp. 607-616
-
-
Corman, F.1
D'Ariano, A.2
Pacciarelli, D.3
Pranzo, M.4
-
21
-
-
85028221397
-
Analysis on differences of railway CTC system in China and foreign countries
-
(Chinese) Apr.
-
Y. P. Cui and H. Zhuang, "Analysis on differences of railway CTC system in China and foreign countries," (in Chinese), Railway Transp. Econom., vol. 35, no. 4, pp. 16-21, Apr. 2013.
-
(2013)
Railway Transp. Econom.
, vol.35
, Issue.4
, pp. 16-21
-
-
Cui, Y.P.1
Zhuang, H.2
-
22
-
-
36148994764
-
Running time re-optimization during realtime timetable perturbations
-
Southampton, U.K. WIT Press
-
A. D'Ariano and T. Albrecht, "Running time re-optimization during realtime timetable perturbations," in WIT Transactions on the Built Environment, vol. 88. Southampton, U.K.: WIT Press, 2006, pp. 531-540.
-
(2006)
WIT Transactions on the Built Environment
, vol.88
, pp. 531-540
-
-
D'Ariano, A.1
Albrecht, T.2
-
23
-
-
59749089450
-
An advanced real-time train dispatching system for minimizing the propagation of delays in a dispatching area under severe disturbances
-
Mar.
-
A. D'Ariano and M. Pranzo, "An advanced real-time train dispatching system for minimizing the propagation of delays in a dispatching area under severe disturbances," Netw. Spatial Econ., vol. 9, no. 1, pp. 63-84, Mar. 2009.
-
(2009)
Netw. Spatial Econ.
, vol.9
, Issue.1
, pp. 63-84
-
-
D'Ariano, A.1
Pranzo, M.2
-
24
-
-
84894028235
-
Improving the robustness in railway station areas
-
May
-
T. Dewilde, P. Sels, P. Cattrysse, and P. Vanteenwegen, "Improving the robustness in railway station areas," Eur. J. Oper. Res., vol. 235, no. 1, pp. 276-286, May 2014.
-
(2014)
Eur. J. Oper. Res.
, vol.235
, Issue.1
, pp. 276-286
-
-
Dewilde, T.1
Sels, P.2
Cattrysse, P.3
Vanteenwegen, P.4
-
25
-
-
0039258445
-
On-line timetable rescheduling in regional train services
-
Aug.
-
A. Diaz, M. O. Gonzalez, and P. Gonzalez-Torre, "On-line timetable rescheduling in regional train services," Transp. Res. B, Methodol., vol. 33, no. 6, pp. 387-398, Aug. 1999.
-
(1999)
Transp. Res. B, Methodol.
, vol.33
, Issue.6
, pp. 387-398
-
-
Diaz, A.1
Gonzalez, M.O.2
Gonzalez-Torre, P.3
-
26
-
-
84893317416
-
-
Ph.D. dissertation Erasmus Univ. Rotterdam, Rotterdam, The Netherlands
-
T. Dollevoet, "Delay management and dispatching in railways," Ph.D. dissertation, Erasmus Univ. Rotterdam, Rotterdam, The Netherlands, 2013.
-
(2013)
Delay Management and Dispatching in Railways
-
-
Dollevoet, T.1
-
27
-
-
84912041490
-
An iterative optimization framework for delay management and train scheduling
-
1007/510696-013-9187-2
-
T. Dollevoet, F. Corman, A. D'Ariano, and D. Huisman, "An iterative optimization framework for delay management and train scheduling," Flexible Serv. Manuf. J., pp. 1-26, DOI: 1007/510696-013-9187-2.
-
Flexible Serv. Manuf. J.
, pp. 1-26
-
-
Dollevoet, T.1
Corman, F.2
D'Ariano, A.3
Huisman, D.4
-
28
-
-
84894309347
-
RCS-Rail Control System. Real-time train run simulation and conflict detection on a netwide scale based on updated train positions
-
Zürich, Switzerland
-
U. Dolder, M. Krista, and M. Voelcker, "RCS-Rail Control System. Real-time train run simulation and conflict detection on a netwide scale based on updated train positions," in Proc. 3rd Int. Conf. Railway Oper. Modelling Anal. RailZurich, Zürich, Switzerland, 2009, pp. 1-15.
-
(2009)
Proc. 3rd Int. Conf. Railway Oper. Modelling Anal. RailZurich
, pp. 1-15
-
-
Dolder, U.1
Krista, M.2
Voelcker, M.3
-
29
-
-
0142156064
-
Scheduling trains on a railway network using a discrete event model of railway traffic
-
Jan.
-
M. J. Dorfman and J. Medanic, "Scheduling trains on a railway network using a discrete event model of railway traffic," Transp. Res. B, Methodol., vol. 38, no. 1, pp. 81-98, Jan. 2004.
-
(2004)
Transp. Res. B, Methodol.
, vol.38
, Issue.1
, pp. 81-98
-
-
Dorfman, M.J.1
Medanic, J.2
-
30
-
-
84888432721
-
A demand-based weighted train delay approach for rescheduling railway networks in real time
-
Feb.-May
-
J. L. Espinosa-Aranda and R. García-Ródenas, "A demand-based weighted train delay approach for rescheduling railway networks in real time," J. Rail Transp. Planning Manage., vol. 3, no. 1/2, pp. 1-13, Feb.-May 2013.
-
(2013)
J. Rail Transp. Planning Manage.
, vol.3
, Issue.1-2
, pp. 1-13
-
-
Espinosa-Aranda, J.L.1
García-Ródenas, R.2
-
31
-
-
84891075573
-
Re-scheduling in railway networks
-
Guildford, U.K.
-
W. Fang, J. Sun, X.Wu, and X. Yao, "Re-scheduling in railway networks," in Proc. 13th U.K. Workshop Comput. Intell., Guildford, U.K., 2013, pp. 342-352.
-
(2013)
Proc. 13th U.K. Workshop Comput. Intell.
, pp. 342-352
-
-
Fang, W.1
Sun, J.2
Wu, X.3
Yao, X.4
-
32
-
-
78650096077
-
Online delay management on a single train line
-
Dagstuhl, Germany
-
M. Gatto, R. Jacob, L. Peeters, and P. Widmayer, "Online delay management on a single train line," in Proc. 4th Int. ATMOS Conf., Dagstuhl, Germany, 2004, pp. 306-320.
-
(2004)
Proc. 4th Int. ATMOS Conf.
, pp. 306-320
-
-
Gatto, M.1
Jacob, R.2
Peeters, L.3
Widmayer, P.4
-
33
-
-
40849124003
-
Optimization models for the delay management problem in public transportation
-
Sep.
-
L. D. Giovanni, G. Heilporn, and M. Labbé, "Optimization models for the delay management problem in public transportation," Eur. J. Oper. Res., vol. 189, no. 3, pp. 762-774, Sep. 2008.
-
(2008)
Eur. J. Oper. Res.
, vol.189
, Issue.3
, pp. 762-774
-
-
Giovanni, L.D.1
Heilporn, G.2
Labbé, M.3
-
34
-
-
77952289414
-
A delay propagation algorithm for large-scale railway traffic networks
-
Jun.
-
R. M. P. Goverde, "A delay propagation algorithm for large-scale railway traffic networks," Transp. Res. C, Emerging Technol., vol. 18, no. 3, pp. 269-287, Jun. 2010.
-
(2010)
Transp. Res. C, Emerging Technol.
, vol.18
, Issue.3
, pp. 269-287
-
-
Goverde, R.M.P.1
-
35
-
-
83755173831
-
Energy saving for automatic train control in moving block signaling system
-
USA
-
Q. Gu, X. Lu, and T. Tang, "Energy saving for automatic train control in moving block signaling system," in Proc. 14th Int. IEEE Conf. Intell. Transp. Syst., USA, 2011, pp. 1305-1310.
-
(2011)
Proc. 14th Int. IEEE Conf. Intell. Transp. Syst.
, pp. 1305-1310
-
-
Gu, Q.1
Lu, X.2
Tang, T.3
-
36
-
-
0035413693
-
Simultaneous vehicle and crew scheduling in urban mass transit systems
-
Aug.
-
K. Haase, G. Desaulniers, and J. Desrosiers, "Simultaneous vehicle and crew scheduling in urban mass transit systems," Transp. Sci., vol. 35, no. 3, pp. 286-303, Aug. 2001.
-
(2001)
Transp. Sci.
, vol.35
, Issue.3
, pp. 286-303
-
-
Haase, K.1
Desaulniers, G.2
Desrosiers, J.3
-
38
-
-
79951897217
-
Modeling network transition constraints with hypergraphs
-
Feb.
-
S. Harrod, "Modeling network transition constraints with hypergraphs," Transp. Sci., vol. 45, no. 1, pp. 81-97, Feb. 2011.
-
(2011)
Transp. Sci.
, vol.45
, Issue.1
, pp. 81-97
-
-
Harrod, S.1
-
40
-
-
33644681577
-
A solution approach for dynamic vehicle and crew scheduling
-
Jul.
-
D. Huisman and A. P. M. Wagelmans, "A solution approach for dynamic vehicle and crew scheduling," Eur. J. Oper. Res., vol. 172, no. 2, pp. 453-471, Jul. 2006.
-
(2006)
Eur. J. Oper. Res.
, vol.172
, Issue.2
, pp. 453-471
-
-
Huisman, D.1
Wagelmans, A.P.M.2
-
41
-
-
0035521192
-
Predictive and reactive approaches to the train-scheduling problem: A knowledge management perspective
-
Nov.
-
M. T. Isaai and N. P. Cassaigne, "Predictive and reactive approaches to the train-scheduling problem: A knowledge management perspective," IEEE Trans. Syst., Man, Cybern. C, Appl. Rev., vol. 31, no. 4, pp. 476-484, Nov. 2001.
-
(2001)
IEEE Trans. Syst., Man, Cybern. C, Appl. Rev.
, vol.31
, Issue.4
, pp. 476-484
-
-
Isaai, M.T.1
Cassaigne, N.P.2
-
43
-
-
0029250003
-
DARYN-A distributed decision-making algorithm for railway networks: Modeling and simulation
-
Feb.
-
R. V. Iyer and S. Ghosh, "DARYN-A distributed decision-making algorithm for railway networks: Modeling and simulation," IEEE Trans. Veh. Technol., vol. 44, no. 1, pp. 180-191, Feb. 1995.
-
(1995)
IEEE Trans. Veh. Technol.
, vol.44
, Issue.1
, pp. 180-191
-
-
Iyer, R.V.1
Ghosh, S.2
-
44
-
-
34249902848
-
Reducing delays by means of computer-aided 'on-The-spot' rescheduling
-
Southampton, U.K. WIT Press
-
J. Jacobs, "Reducing delays by means of computer-aided 'on-the-spot' rescheduling," in Computers in Railways IX. Southampton, U.K.: WIT Press, 2004.
-
(2004)
Computers in Railways IX
-
-
Jacobs, J.1
-
45
-
-
77956302319
-
Disruption management in passenger railway transportation
-
Berlin, Germany: Springer- Verlag
-
J. Jespersen-Groth et al., "Disruption management in passenger railway transportation," in Lecture Notes in Computer Science, vol. 5868. Berlin, Germany: Springer-Verlag, 2009, pp. 399-421.
-
(2009)
Lecture Notes in Computer Science
, vol.5868
, pp. 399-421
-
-
Jespersen-Groth, J.1
-
46
-
-
85028222446
-
Optimal reinsertion of cancelled train lines
-
Tech. Univ. Denmark, Lyngby, Denmark
-
J. Jespersen-Groth and J. Clausen, "Optimal reinsertion of cancelled train lines," Informat. Math. Modelling, Tech. Univ. Denmark, Lyngby, Denmark, 2006.
-
(2006)
Informat. Math. Modelling
-
-
Jespersen-Groth, J.1
Clausen, J.2
-
47
-
-
30544441805
-
Future train traffic control: Control by re-planning
-
Jan.
-
A. Kauppi, J.Wikström, B. Sandblad, and A.W. Andersson, "Future train traffic control: Control by re-planning," Cognit., Technol. Work, vol. 8, no. 1, pp. 50-56, Jan. 2006.
-
(2006)
Cognit., Technol. Work
, vol.8
, Issue.1
, pp. 50-56
-
-
Kauppi, A.1
Wikström, J.2
Sandblad, B.3
Andersson, A.W.4
-
48
-
-
85051187221
-
An online railway traffic prediction model
-
Copenhagen, Denmark
-
P. Kecman and R. M. P. Goverde, "An online railway traffic prediction model," in Proc. 5th Int. Conf. Railway Oper. Modelling Anal., Copenhagen, Denmark, 2013, pp. 448-467.
-
(2013)
Proc. 5th Int. Conf. Railway Oper. Modelling Anal.
, pp. 448-467
-
-
Kecman, P.1
Goverde, R.M.P.2
-
49
-
-
77649271726
-
Slack time allocation in robust double-track train timetabling applications
-
Mar.
-
M. B. Khan and X. Zhou, "Slack time allocation in robust double-track train timetabling applications," IEEE Trans. Intell. Transp. Syst., vol. 11, no. 1, pp. 81-89, Mar. 2010.
-
(2010)
IEEE Trans. Intell. Transp. Syst.
, vol.11
, Issue.1
, pp. 81-89
-
-
Khan, M.B.1
Zhou, X.2
-
50
-
-
78650137333
-
A note on the online nature of the railway delay management problem
-
Mar.
-
N. Kliewer and L. Suhl, "A note on the online nature of the railway delay management problem," Networks, vol. 57, no. 1, pp. 28-37, Mar. 2010.
-
(2010)
Networks
, vol.57
, Issue.1
, pp. 28-37
-
-
Kliewer, N.1
Suhl, L.2
-
51
-
-
34748853876
-
Application of dynamic programming to optimization of running profile of a train
-
Southampton, U.K WIT Press
-
H. Ko, T. Koseki, and M. Miyatake, "Application of dynamic programming to optimization of running profile of a train," in Computers in Railways IX. Southampton, U.K: WIT Press, 2004.
-
(2004)
Computers in Railways IX
-
-
Ko, H.1
Koseki, T.2
Miyatake, M.3
-
52
-
-
67649977016
-
The new Dutch timetable: The or revolution
-
Jan./Feb.
-
L. G. Kroon et al., "The new Dutch timetable: The OR revolution," Interfaces, vol. 39, no. 1, pp. 6-17, Jan./Feb. 2009.
-
(2009)
Interfaces
, vol.39
, Issue.1
, pp. 6-17
-
-
Kroon, L.G.1
-
53
-
-
79955709136
-
A proposal of autonomous online expansion technology for real-time system and its application to railway signalling system
-
T. Kunifuji, H. Ito, Y. Saimi, and K. Mori, "A proposal of autonomous online expansion technology for real-time system and its application to railway signalling system," in Proc. 10th Int. Symp. Auton. Decentralized Syst., 2011, pp. 73-80.
-
(2011)
Proc. 10th Int. Symp. Auton. Decentralized Syst.
, pp. 73-80
-
-
Kunifuji, T.1
Ito, H.2
Saimi, Y.3
Mori, K.4
-
54
-
-
84912051240
-
Susceptibility of optimal train schedules to stochastic disturbances of process times
-
R. Larsen, M. Pranzo, A. D'Ariano, D. Pacciarelli, and F. Corman, "Susceptibility of optimal train schedules to stochastic disturbances of process times," Flexible Serv. Manuf. J., pp. 1-26, DOI: 10.1007/s10696-013-9187-2.
-
Flexible Serv. Manuf. J.
, pp. 1-26
-
-
Larsen, R.1
Pranzo, M.2
D'Ariano, A.3
Pacciarelli, D.4
Corman, F.5
-
55
-
-
0035038348
-
Stability of RYNSORD: A decentralized algorithm for railway networks under perturbation
-
Jan.
-
T. S. Lee and S. Ghosh, "Stability of RYNSORD: A decentralized algorithm for railway networks under perturbation," IEEE Trans. Veh. Technol., vol. 50, no. 1, pp. 287-301, Jan. 2001.
-
(2001)
IEEE Trans. Veh. Technol.
, vol.50
, Issue.1
, pp. 287-301
-
-
Lee, T.S.1
Ghosh, S.2
-
56
-
-
77956296690
-
-
Ph.D. dissertation Eidgenoessische Technische Hochschule (ETH) Zürich, Zürich, Switzerland
-
M. Luethi, "Improving the efficiency of heavily used railway networks through integrated real-time rescheduling," Ph.D. dissertation, Eidgenoessische Technische Hochschule (ETH) Zürich, Zürich, Switzerland, 2009, 18615.
-
(2009)
Improving the Efficiency of Heavily Used Railway Networks Through Integrated Real-time Rescheduling
, pp. 18615
-
-
Luethi, M.1
-
57
-
-
69949109733
-
Real-time traffic control in metro stations
-
Jul./Aug.
-
C. Mannino and A. Mascis, "Real-time traffic control in metro stations," Oper. Res., vol. 57, no. 4, pp. 1026-1039, Jul./Aug. 2009.
-
(2009)
Oper. Res.
, vol.57
, Issue.4
, pp. 1026-1039
-
-
Mannino, C.1
Mascis, A.2
-
58
-
-
53749098943
-
Scheduling models for shortterm railway traffic optimization
-
Berlin, Germany: Springer- Verlag ser. Lecture Notes in Economics and Mathematical Systems
-
A. Mascis, D. Pacciarelli, and M. Pranzo, "Scheduling models for shortterm railway traffic optimization," in Computer-aided Systems in Public Transport, vol. 600. Berlin, Germany: Springer-Verlag, 2008, ser. Lecture Notes in Economics and Mathematical Systems, pp. 71-90.
-
(2008)
Computer-aided Systems in Public Transport
, vol.600
, pp. 71-90
-
-
Mascis, A.1
Pacciarelli, D.2
Pranzo, M.3
-
59
-
-
33748698838
-
A traffic management system for real-time traffic optimization in railways
-
Feb.
-
M. Mazzarello and E. Ottaviani, "A traffic management system for real-time traffic optimization in railways," Transp. Res. B, Methodol., vol. 41, no. 2, pp. 246-274, Feb. 2007.
-
(2007)
Transp. Res. B, Methodol.
, vol.41
, Issue.2
, pp. 246-274
-
-
Mazzarello, M.1
Ottaviani, E.2
-
60
-
-
79959808568
-
Robust single-track train dispatching model under a dynamic and stochastic environment: A scenario-based rolling horizon approach
-
Aug.
-
L. Meng and X. Zhou, "Robust single-track train dispatching model under a dynamic and stochastic environment: A scenario-based rolling horizon approach," Transp. Res. B, Methodol., vol. 45, no. 7, pp. 1080-1102, Aug. 2011.
-
(2011)
Transp. Res. B, Methodol.
, vol.45
, Issue.7
, pp. 1080-1102
-
-
Meng, L.1
Zhou, X.2
-
61
-
-
84902346437
-
Simultaneous train rerouting and rescheduling on an N-track network: A model reformulation with network-based cumulative flow variables
-
Sep.
-
L. Meng and X. Zhou, "Simultaneous train rerouting and rescheduling on an N-track network: A model reformulation with network-based cumulative flow variables," Transp. Res. B, Methodol., vol. 67, pp. 208-234, Sep. 2014.
-
(2014)
Transp. Res. B, Methodol.
, vol.67
, pp. 208-234
-
-
Meng, L.1
Zhou, X.2
-
62
-
-
79959786879
-
Scheduling freight trains traveling on complex networks
-
Aug.
-
S. Mu and M. Dessouky, "Scheduling freight trains traveling on complex networks," Transp. Res. B, Methodol., vol. 45, no. 7, pp. 1103-1123, Aug. 2011.
-
(2011)
Transp. Res. B Methodol.
, vol.45
, Issue.7
, pp. 1103-1123
-
-
Mu, S.1
Dessouky, M.2
-
63
-
-
84891122548
-
Scheduling and rescheduling of railway operations: A review and expository analysis
-
Dec.
-
S. Narayanaswami and N. Rangaraj, "Scheduling and rescheduling of railway operations: A review and expository analysis," Technol. Oper. Manage., vol. 2, no. 2, pp. 102-122, Dec. 2011.
-
(2011)
Technol. Oper. Manage.
, vol.2
, Issue.2
, pp. 102-122
-
-
Narayanaswami, S.1
Rangaraj, N.2
-
64
-
-
84859796707
-
A rolling horizon approach for disruption management of railway rolling stock
-
Jul.
-
L. K. Nielsen, L. Kroon, and G. Maróti, "A rolling horizon approach for disruption management of railway rolling stock," Eur. J. Oper. Res., vol. 220, no. 2, pp. 496-509, Jul. 2012.
-
(2012)
Eur. J. Oper. Res.
, vol.220
, Issue.2
, pp. 496-509
-
-
Nielsen, L.K.1
Kroon, L.2
Maróti, G.3
-
66
-
-
85028211252
-
Real time railway traffic management modeling track-circuits
-
Saarbrücken, Germany
-
P. Pellegrini, G. Marlière, and J. Rodriguez, "Real time railway traffic management modeling track-circuits," in Proc. 12th Workshop Algorithmic Approaches Transp. Modelling, Optim., Syst., Saarbrücken, Germany, 2012, pp. 1-12.
-
(2012)
Proc. 12th Workshop Algorithmic Approaches Transp. Modelling, Optim., Syst.
, pp. 1-12
-
-
Pellegrini, P.1
Marlière, G.2
Rodriguez, J.3
-
67
-
-
85028232351
-
Railway capacity optimization by integration of real-time rescheduling and automatic train operation
-
Zürich, Switzerland
-
X. Rao, M. Montigel, and U. Weidmann, "Railway capacity optimization by integration of real-time rescheduling and automatic train operation," in Proc. IT Rail, Zürich, Switzerland, 2013, pp. 1-12.
-
(2013)
Proc. IT Rail
, pp. 1-12
-
-
Rao, X.1
Montigel, M.2
Weidmann, U.3
-
68
-
-
84901007306
-
Stability analysis of railway dispatching plans in a stochastic and dynamic environment
-
Nov.
-
E. Quaglietta, F. Corman, and R. M. P. Goverde, "Stability analysis of railway dispatching plans in a stochastic and dynamic environment," J. Rail Transp. Planning Manage., vol. 3, no. 4, pp. 137-149, Nov. 2013.
-
(2013)
J. Rail Transp. Planning Manage.
, vol.3
, Issue.4
, pp. 137-149
-
-
Quaglietta, E.1
Corman, F.2
Goverde, R.M.P.3
-
69
-
-
0032884348
-
Railway traffic control and train scheduling based on intertrain conflict management
-
Sep.
-
I. Sahin, "Railway traffic control and train scheduling based on intertrain conflict management," Transp. Res. B, Methodol., vol. 33, no. 7, pp. 511-534, Sep. 1999.
-
(1999)
Transp. Res. B, Methodol.
, vol.33
, Issue.7
, pp. 511-534
-
-
Sahin, I.1
-
70
-
-
84893307572
-
Dynamic traffic management in the schiphol bottleneck
-
Hannover, Germany
-
A. A. M. Schaafsma and M. M. G. P. Bartholomeus, "Dynamic traffic management in the schiphol bottleneck," in Proc. 2nd Int. Conf. Railway Oper. Modelling Anal., Hannover, Germany, 2007, pp. 1-18.
-
(2007)
Proc. 2nd Int. Conf. Railway Oper. Modelling Anal.
, pp. 1-18
-
-
Schaafsma, A.A.M.1
Bartholomeus, M.M.G.P.2
-
71
-
-
36448977879
-
Railway traffic disturbance management-An experimental analysis of disturbance complexity, management objectives and limitations in planning horizon
-
Mar.
-
J. Törnquist, "Railway traffic disturbance management-An experimental analysis of disturbance complexity, management objectives and limitations in planning horizon," Transp. Res. A, Pol. Pract., vol. 41, no. 3, pp. 249-266, Mar. 2007.
-
(2007)
Transp. Res. A, Pol. Pract.
, vol.41
, Issue.3
, pp. 249-266
-
-
Törnquist, J.1
-
72
-
-
84893212572
-
Improved railway service by shared traffic information
-
Beijing, China
-
S. Tschirner, A. W. Andersson, and B. Sandblad, "Improved railway service by shared traffic information," in Proc. 1st IEEE Int. Conf. Intell. Rail Transp., Beijing, China, 2013, pp. 117-122.
-
(2013)
Proc. 1st IEEE Int. Conf. Intell. Rail Transp.
, pp. 117-122
-
-
Tschirner, S.1
Andersson, A.W.2
Sandblad, B.3
-
73
-
-
84930941757
-
On a model predictive control algorithm for dynamic railway network
-
Hannover, Germany
-
T. J. J. Van den Boom and B. De Schutter, "On a model predictive control algorithm for dynamic railway network," in Proc. 2nd Int. Conf. Railway Oper. Modelling Anal., Hannover, Germany, 2007, pp. 1-16.
-
(2007)
Proc. 2nd Int. Conf. Railway Oper. Modelling Anal.
, pp. 1-16
-
-
Van Den Boom, T.J.J.1
De Schutter, B.2
-
74
-
-
0025472092
-
A distributed intelligent methodology for railway traffic control
-
Aug.
-
G. Vernazza and R. Zunino, "A distributed intelligent methodology for railway traffic control," IEEE Trans. Veh. Technol., vol. 39, no. 3, pp. 263-270, Aug. 1990.
-
(1990)
IEEE Trans. Veh. Technol.
, vol.39
, Issue.3
, pp. 263-270
-
-
Vernazza, G.1
Zunino, R.2
-
75
-
-
33644679955
-
Reliability and heterogeneity of railway services
-
Jul.
-
M. Vromans, R. Dekker, and L. G. Kroon, "Reliability and heterogeneity of railway services," Eur. J. Oper. Res., vol. 172, no. 2, pp. 647-665, Jul. 2006.
-
(2006)
Eur. J. Oper. Res.
, vol.172
, Issue.2
, pp. 647-665
-
-
Vromans, M.1
Dekker, R.2
Kroon, L.G.3
-
76
-
-
79952406435
-
Real-time train scheduling and control based on model predictive control
-
Wuhan, China
-
P. Wang, Y. Zhou, J. Chen, Y. Wang, and P. Wu, "Real-time train scheduling and control based on model predictive control," in Proc. 2nd WRI Global Congr. Intell. Syst., Wuhan, China, 2010, pp. 47-50.
-
(2010)
Proc. 2nd WRI Global Congr. Intell. Syst.
, pp. 47-50
-
-
Wang, P.1
Zhou, Y.2
Chen, J.3
Wang, Y.4
Wu, P.5
-
77
-
-
85028198362
-
Sustainable global service intention as objective for controlling railway network operations in real time
-
Seoul, Korea
-
R. Wuest, F. Laube, S. Roos, and G. Caimi, "Sustainable global service intention as objective for controlling railway network operations in real time," in Proc. 8th World Congr. Railway Res., Seoul, Korea, 2008, pp. 1-13.
-
(2008)
Proc. 8th World Congr. Railway Res.
, pp. 1-13
-
-
Wuest, R.1
Laube, F.2
Roos, S.3
Caimi, G.4
-
78
-
-
84930969977
-
Mixed-integer programming based approaches for the movement planner problem: Model, heuristics and decomposition
-
Phoenix, AZ, USA First Prize Winner
-
C. Yan and L. Yang, "Mixed-integer programming based approaches for the movement planner problem: Model, heuristics and decomposition," INFORMS RAS Problem Solving Competition, Phoenix, AZ, USA, 2012, First Prize Winner.
-
(2012)
INFORMS RAS Problem Solving Competition
-
-
Yan, C.1
Yang, L.2
-
79
-
-
84921692938
-
Robustness indices for train rescheduling
-
T. Yoko and T. Norio, "Robustness indices for train rescheduling," in Proc. 1st Int. Conf. Railway Oper. Modelling Anal., Delft, The Netherlands, 2005, pp. 1-12.
-
(2005)
Proc. 1st Int. Conf. Railway Oper. Modelling Anal., Delft, the Netherlands
, pp. 1-12
-
-
Yoko, T.1
Norio, T.2
-
80
-
-
33748706761
-
Optimizing capacity utilization of stations by estimating knock-on train delays
-
Feb.
-
J. Yuan and I. A. Hansen, "Optimizing capacity utilization of stations by estimating knock-on train delays," Transp. Res. B, Methodol., vol. 41, no. 2, pp. 202-217, Feb. 2007.
-
(2007)
Transp. Res. B, Methodol.
, vol.41
, Issue.2
, pp. 202-217
-
-
Yuan, J.1
Hansen, I.A.2
-
81
-
-
33845274298
-
Single-track train timetabling with guaranteed optimality: Branch-and-bound algorithms with enhanced lower bounds
-
Mar.
-
X. Zhou and M. Zhong, "Single-track train timetabling with guaranteed optimality: Branch-and-bound algorithms with enhanced lower bounds," Transp. Res. B, Methodol., vol. 41, no. 3, pp. 320-341, Mar. 2007.
-
(2007)
Transp. Res. B, Methodol.
, vol.41
, Issue.3
, pp. 320-341
-
-
Zhou, X.1
Zhong, M.2
|