메뉴 건너뛰기




Volumn 3, Issue , 2010, Pages 47-50

Real-time train scheduling and control based on model predictive control

Author keywords

Centralized traffic control (CTC); Model predictive control (MPC); Predictive scheduling(PS); Train scheduling

Indexed keywords

CENTRALIZED TRAFFIC CONTROLS; COMPLETION TIME; FIRST COME FIRST SERVED; FORMAL DESCRIPTION; FRAMEWORK AND ALGORITHMS; HEURISTIC SCHEDULING; HIGH SPEED TRAINS; INTELLIGENT DECISION SUPPORT; MODEL PREDICTIVE CONTROL (MPC); NETWORKED OPERATIONS; PERFORMANCE IMPROVEMENTS; PLANNING HORIZONS; PREDICTION HORIZON; PREDICTIVE SCHEDULING; PREDICTIVE SCHEDULING(PS); RAILWAY NETWORK; REALTIME PROCESSING; SIMULATION RESULT; TRAIN OPERATIONS; TRAIN SCHEDULING;

EID: 79952406435     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/GCIS.2010.186     Document Type: Conference Paper
Times cited : (7)

References (10)
  • 1
    • 34249982545 scopus 로고    scopus 로고
    • A branch and bound algorithm for scheduling trains in a railway network
    • December
    • A. D'Ariano, D. Pacciarelli, and M. Pranzo, "A branch and bound algorithm for scheduling trains in a railway network," European Journal of Operational Research, vol. 183, pp. 643-657, December 2007.
    • (2007) European Journal of Operational Research , vol.183 , pp. 643-657
    • D'Ariano, A.1    Pacciarelli, D.2    Pranzo, M.3
  • 2
    • 34249889301 scopus 로고    scopus 로고
    • Conflict resolution and train speed coordination for solving real-time timetable perturbations
    • June
    • A. D'Ariano, M. Pranzo, and I. A. Hansen, "Conflict resolution and train speed coordination for solving real-time timetable perturbations," IEEE Transactions on Intelligent Transportation Systems, vol. 8, pp. 208-222, June 2007.
    • (2007) IEEE Transactions on Intelligent Transportation Systems , vol.8 , pp. 208-222
    • D'Ariano, A.1    Pranzo, M.2    Hansen, I.A.3
  • 3
    • 38849099559 scopus 로고    scopus 로고
    • Assessment of flexible timetables in real-time traffic management of a railway bottleneck
    • April
    • A. D'Ariano, D. Pacciarelli, and M. Pranzo, "Assessment of flexible timetables in real-time traffic management of a railway bottleneck," Transportation Research, Part C, vol. 16, pp. 232-245, April 2008.
    • (2008) Transportation Research, Part C , vol.16 , pp. 232-245
    • D'Ariano, A.1    Pacciarelli, D.2    Pranzo, M.3
  • 4
    • 33845274298 scopus 로고    scopus 로고
    • Single-track train timetabling with guaranteed optimality: Branch-and-bound algorithms with enhanced lower bounds
    • March
    • X. Zhou, and M. Zhong, "Single-track train timetabling with guaranteed optimality: Branch-and-bound algorithms with enhanced lower bounds," Transportation Research, Part B, vol. 41, pp. 320-341, March 2007.
    • (2007) Transportation Research, Part B , vol.41 , pp. 320-341
    • Zhou, X.1    Zhong, M.2
  • 5
    • 71549158818 scopus 로고    scopus 로고
    • A tabu search algorithm for rerouting trains during rail operations
    • January
    • F. Corman, A. D'Ariano, D. Pacciarelli, and M. Pranzo, "A tabu search algorithm for rerouting trains during rail operations," Transportation Research, Part B, vol. 44, pp. 175-192, January 2010.
    • (2010) Transportation Research, Part B , vol.44 , pp. 175-192
    • Corman, F.1    D'Ariano, A.2    Pacciarelli, D.3    Pranzo, M.4
  • 6
    • 33644594453 scopus 로고    scopus 로고
    • A Lagrangian heuristic algorithm for a real-world train timetabling problem
    • April
    • A. Caprara, M. Monaci, P. Toth, and P. L. Guida, "A Lagrangian heuristic algorithm for a real-world train timetabling problem," Discrete Applied Mathematics, vol. 154, pp. 738-753, April 2006.
    • (2006) Discrete Applied Mathematics , vol.154 , pp. 738-753
    • Caprara, A.1    Monaci, M.2    Toth, P.3    Guida, P.L.4
  • 7
    • 52749094717 scopus 로고    scopus 로고
    • Efficient scheduling of railway traffic based on global information of train
    • December
    • F. Li, Z. Gao, K. Li, and L. Yang, "Efficient scheduling of railway traffic based on global information of train," Transportation Research, Part B, vol. 42, pp. 1008-1030, December 2008.
    • (2008) Transportation Research, Part B , vol.42 , pp. 1008-1030
    • Li, F.1    Gao, Z.2    Li, K.3    Yang, L.4
  • 9
    • 33748698838 scopus 로고    scopus 로고
    • A traffic management system for real-time traffic optimisation in railways
    • February
    • M. Mazzarello, and E. Ottaviani, "A traffic management system for real-time traffic optimisation in railways," Transportation Research Part B, vol. 41, pp. 246-274, February 2007.
    • (2007) Transportation Research Part B , vol.41 , pp. 246-274
    • Mazzarello, M.1    Ottaviani, E.2
  • 10
    • 13544267417 scopus 로고    scopus 로고
    • Bicriteria train scheduling for high-speed passenger railroad planning applications
    • December
    • X. Zhou, and M. Zhong, "Bicriteria train scheduling for high-speed passenger railroad planning applications," European Journal of Operational Research, vol. 167, pp. 752-771, December 2005.
    • (2005) European Journal of Operational Research , vol.167 , pp. 752-771
    • Zhou, X.1    Zhong, M.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.