메뉴 건너뛰기




Volumn , Issue , 2013, Pages 342-352

Re-scheduling in railway networks

Author keywords

[No Author keywords available]

Indexed keywords

GOODS TRANSPORT; PUBLIC TRANSPORT; RAILWAY INFRASTRUCTURE; RAILWAY NETWORK; RAILWAY TRANSPORT; RE-SCHEDULING; SEVERE WEATHER; TRAIN DISPATCHERS;

EID: 84891075573     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/UKCI.2013.6651326     Document Type: Conference Paper
Times cited : (7)

References (46)
  • 1
    • 84891122548 scopus 로고    scopus 로고
    • Scheduling and rescheduling of railway operations: A review and expository analysis
    • S. Narayanaswami and N. Rangaraj, "Scheduling and rescheduling of railway operations: A review and expository analysis," Technology Operation Management, vol. 2, no. 2, pp. 102-122, 2011.
    • (2011) Technology Operation Management , vol.2 , Issue.2 , pp. 102-122
    • Narayanaswami, S.1    Rangaraj, N.2
  • 3
    • 30544435688 scopus 로고    scopus 로고
    • An exact solution procedure to determine the optimal dispatching times for complex rail networks
    • M. M. Dessouky, Q. Lu, J. Zhao, and R. C. Leachman, "An exact solution procedure to determine the optimal dispatching times for complex rail networks," IIE Transactions, vol. 38, no. 2, pp. 141-152, 2006.
    • (2006) IIE Transactions , vol.38 , Issue.2 , pp. 141-152
    • Dessouky, M.M.1    Lu, Q.2    Zhao, J.3    Leachman, R.C.4
  • 4
    • 34249982545 scopus 로고    scopus 로고
    • A branch and bound algorithm for scheduling trains in a railway network
    • A. D'Ariano, D. Pacciarelli, and M. Pranzo, "A branch and bound algorithm for scheduling trains in a railway network," European Journal of Operational Research, vol. 183, no. 2, pp. 643-657, 2007.
    • (2007) European Journal of Operational Research , vol.183 , Issue.2 , pp. 643-657
    • D'ariano, A.1    Pacciarelli, D.2    Pranzo, M.3
  • 5
    • 33748695294 scopus 로고    scopus 로고
    • A constraint programming model for realtime train scheduling at junctions
    • J. Rodriguez, "A constraint programming model for realtime train scheduling at junctions," Transportation Research Part B: Methodological, vol. 41, no. 2, pp. 231-245, 2007.
    • (2007) Transportation Research Part B: Methodological , vol.41 , Issue.2 , pp. 231-245
    • Rodriguez, J.1
  • 9
    • 0035119102 scopus 로고    scopus 로고
    • Railway junction traffic control by heuristic methods
    • T.K.Ho and T.H.Yeung, "Railway junction traffic control by heuristic methods," IEE Proceedings-Electric Power Applications, vol. 148, no. 1, pp. 77-84, 2001.
    • (2001) IEE Proceedings-Electric Power Applications , vol.148 , Issue.1 , pp. 77-84
    • Ho, T.K.1    Yeung, T.H.2
  • 14
    • 33748698838 scopus 로고    scopus 로고
    • A traffic management system for real-time traffic optimisation in railways
    • M. Mazzarello and E. Ottaviani, "A traffic management system for real-time traffic optimisation in railways," Transportation Research Part B: Methodological, vol. 41, no. 2, pp. 246-274, 2007.
    • (2007) Transportation Research Part B: Methodological , vol.41 , Issue.2 , pp. 246-274
    • Mazzarello, M.1    Ottaviani, E.2
  • 15
    • 34249889301 scopus 로고    scopus 로고
    • Conflict resolution and train speed coordination for solving realtime timetable perturbations
    • A. D'Ariano, M. Pranzo, and I. A. Hansen, "Conflict resolution and train speed coordination for solving realtime timetable perturbations," IEEE Transactions on Intelligent Transportation Systems, vol. 8, no. 2, pp. 208-222, 2007.
    • (2007) IEEE Transactions on Intelligent Transportation Systems , vol.8 , Issue.2 , pp. 208-222
    • D'ariano, A.1    Pranzo, M.2    Hansen, I.A.3
  • 16
    • 38849099559 scopus 로고    scopus 로고
    • Assessment of flexible timetables in real-time traffic management of a railway bottleneck
    • A. D'Ariano, D. Pacciarelli, and M. Pranzo, "Assessment of flexible timetables in real-time traffic management of a railway bottleneck," Transportation Research Part C: Emerging Technologies, vol. 16, no. 2, pp. 232-245, 2008.
    • (2008) Transportation Research Part C: Emerging Technologies , vol.16 , Issue.2 , pp. 232-245
    • D'ariano, A.1    Pacciarelli, D.2    Pranzo, M.3
  • 19
    • 33644594453 scopus 로고    scopus 로고
    • A lagrangian heuristic algorithm for a real-world train timetabling problem
    • A. Caprara, M. Monaci, P. Toth, and P. L. Guida, "A lagrangian heuristic algorithm for a real-world train timetabling problem," Discrete Applied Mathematics, vol. 154, no. 5, pp. 738-753, 2006.
    • (2006) Discrete Applied Mathematics , vol.154 , Issue.5 , pp. 738-753
    • Caprara, A.1    Monaci, M.2    Toth, P.3    Guida, P.L.4
  • 20
    • 77955639714 scopus 로고    scopus 로고
    • To wait or not to wait and who goes first? Delay management with priority decisions
    • M. Schachtebeck and A. Schobel, "To wait or not to wait and who goes first? delay management with priority decisions," Transportation Science, vol. 44, no. 3, p. 307C321, 2010.
    • (2010) Transportation Science , vol.44 , Issue.3
    • Schachtebeck, M.1    Schobel, A.2
  • 24
    • 78650130562 scopus 로고    scopus 로고
    • A mip-based local search method for the railway rescheduling problem
    • R. Acuna-Agost, P. Michelon, D. Feillet, and S. Gueye, "A mip-based local search method for the railway rescheduling problem," Networks, vol. 57, no. 1, pp. 69-86, 2011.
    • (2011) Networks , vol.57 , Issue.1 , pp. 69-86
    • Acuna-Agost, R.1    Michelon, P.2    Feillet, D.3    Gueye, S.4
  • 25
    • 79960905667 scopus 로고    scopus 로고
    • Sapi: Statistical analysis of propagation of incidents. A new approach for rescheduling trains after disruptions
    • R. Acuna-Agost, P. Michelon, and D. Feillet, "Sapi: Statistical analysis of propagation of incidents. A new approach for rescheduling trains after disruptions," European Journal of Operational Research, vol. 215, no. 1, pp. 227-243, 2011.
    • (2011) European Journal of Operational Research , vol.215 , Issue.1 , pp. 227-243
    • Acuna-Agost, R.1    Michelon, P.2    Feillet, D.3
  • 26
    • 78650824016 scopus 로고    scopus 로고
    • An appraisal of a column-generation-based algorithm for centralized train-conflict resolution on a metropolitan railway network
    • Y.-H. Min, M.-J. Park, S.-P. Hong, and S.-H. Hong, "An appraisal of a column-generation-based algorithm for centralized train-conflict resolution on a metropolitan railway network," Transportation Research Part B: Methodological, vol. 45, no. 2, pp. 409-429, 2011.
    • (2011) Transportation Research Part B: Methodological , vol.45 , Issue.2 , pp. 409-429
    • Min, Y.-H.1    Park, M.-J.2    Hong, S.-P.3    Hong, S.-H.4
  • 27
  • 28
    • 36448977879 scopus 로고    scopus 로고
    • Railway traffic disturbance management?an experimental analysis of disturbance complexity, management objectives and limitations in planning horizon
    • J. Tornquist, "Railway traffic disturbance management?an experimental analysis of disturbance complexity, management objectives and limitations in planning horizon," Transportation Research Part A: Policy and Practice, vol. 41, no. 3, pp. 249-266, 2007.
    • (2007) Transportation Research Part A: Policy and Practice , vol.41 , Issue.3 , pp. 249-266
    • Tornquist, J.1
  • 29
    • 78751483806 scopus 로고    scopus 로고
    • Greedy algorithm for railway traffic rescheduling during disturbances: A swedish case
    • J. Krasemann, "Greedy algorithm for railway traffic rescheduling during disturbances: A swedish case," Intelligent Transport Systems, IET, vol. 4, no. 4, pp. 375-386, 2010.
    • (2010) Intelligent Transport Systems, IET , vol.4 , Issue.4 , pp. 375-386
    • Krasemann, J.1
  • 30
    • 80054777781 scopus 로고    scopus 로고
    • Design of an effective algorith-m for fast response to the re-scheduling of railway traffic during disturbances
    • J. Tornquist Krasemann, "Design of an effective algorith-m for fast response to the re-scheduling of railway traffic during disturbances," Transportation Research Part C: Emerging Technologies, vol. 20, no. 1, pp. 62-78, 2012.
    • (2012) Transportation Research Part C: Emerging Technologies , vol.20 , Issue.1 , pp. 62-78
    • Krasemann, J.T.1
  • 33
    • 0029777050 scopus 로고    scopus 로고
    • Sepia: A realtime expert system that automates train route management
    • Y. Larroche, R. Moulin, and D. Gauyacq, "Sepia: A realtime expert system that automates train route management," Control Engineering Practice, vol. 4, no. 1, pp. 27-34, 1996.
    • (1996) Control Engineering Practice , vol.4 , Issue.1 , pp. 27-34
    • Larroche, Y.1    Moulin, R.2    Gauyacq, D.3
  • 34
    • 0034508998 scopus 로고    scopus 로고
    • A fuzzy knowledge-based system for railway traffic control
    • A. Fay, "A fuzzy knowledge-based system for railway traffic control," Engineering Applications of Artificial Intelligence, vol. 13, no. 6, pp. 719-729, 2000.
    • (2000) Engineering Applications of Artificial Intelligence , vol.13 , Issue.6 , pp. 719-729
    • Fay, A.1
  • 35
    • 60249086557 scopus 로고    scopus 로고
    • A fuzzy petri nets approach for railway traffic control in case of abnormality: Evidence from taiwan railway system
    • Y.-H. Cheng and L.-A. Yang, "A fuzzy petri nets approach for railway traffic control in case of abnormality: Evidence from taiwan railway system," Expert Systems with Applications, vol. 36, no. 4, pp. 8040-8048, 2009.
    • (2009) Expert Systems with Applications , vol.36 , Issue.4 , pp. 8040-8048
    • Cheng, Y.-H.1    Yang, L.-A.2
  • 36
    • 34249902848 scopus 로고    scopus 로고
    • Reducing delays by means of computer-aided on-The-spotrescheduling
    • J. Jacobs, "Reducing delays by means of computer-aided on-The-spotrescheduling," Computers in Railways IX, p. 603C612, 2004.
    • (2004) Computers in Railways , vol.9
    • Jacobs, J.1
  • 37
    • 84859705420 scopus 로고    scopus 로고
    • A model predictive control approach for discrete-time rescheduling in complex central railway station areas
    • M. F. Gabrio Caimi, M. Laumanns, and M. Luthi, "A model predictive control approach for discrete-time rescheduling in complex central railway station areas," Computers &Operations Research, vol. 39, no. 11, pp. 2578-2593, 2012.
    • (2012) Computers &Operations Research , vol.39 , Issue.11 , pp. 2578-2593
    • Gabrio Caimi, M.F.1    Laumanns, M.2    Luthi, M.3
  • 38
    • 84891120634 scopus 로고    scopus 로고
    • Mathematics Subject Classification. American Mathematical Society, 2011
    • Mathematics Subject Classification. American Mathematical Society, 2011.
  • 41
    • 0036759198 scopus 로고    scopus 로고
    • Modeling and solving the train timetabling problem
    • A. Caprara, M. Fischetti, and P. Toth, "Modeling and solving the train timetabling problem," Operations Research, vol. 50, no. 5, pp. 851-861, 2002.
    • (2002) Operations Research , vol.50 , Issue.5 , pp. 851-861
    • Caprara, A.1    Fischetti, M.2    Toth, P.3
  • 42
    • 77955597779 scopus 로고    scopus 로고
    • Capacity constraints in delay management
    • A. Schobel, "Capacity constraints in delay management," Public Transport, vol. 1, no. 2, pp. 135-154, 2009.
    • (2009) Public Transport , vol.1 , Issue.2 , pp. 135-154
    • Schobel, A.1
  • 44
    • 0032884348 scopus 로고    scopus 로고
    • Railway traffic control and train scheduling based oninter-train conflict management
    • I. Sahin, "Railway traffic control and train scheduling based oninter-train conflict management," Transportation Research Part B: Methodological, vol. 33, no. 7, pp. 511-534, 1999.
    • (1999) Transportation Research Part B: Methodological , vol.33 , Issue.7 , pp. 511-534
    • Sahin, I.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.