메뉴 건너뛰기




Volumn 30, Issue , 2009, Pages 97-144

Modeling and managing uncertainty in process planning and scheduling

Author keywords

[No Author keywords available]

Indexed keywords


EID: 84976496732     PISSN: 19316828     EISSN: 19316836     Source Type: Book Series    
DOI: 10.1007/978-0-387-88617-6_3     Document Type: Chapter
Times cited : (8)

References (120)
  • 1
    • 0031100306 scopus 로고    scopus 로고
    • A multiparametric programming approach for linear process engineering problems under uncertainty
    • J. Acevedo and E.N. Pistikopoulos. A multiparametric programming approach for linear process engineering problems under uncertainty. Industrial and Engineering Chemistry Research, 36:717-728, 1997.
    • (1997) Industrial and Engineering Chemistry Research , vol.36 , pp. 717-728
    • Acevedo, J.1    Pistikopoulos, E.N.2
  • 2
    • 34249842390 scopus 로고
    • A pivoting algorithm for convex hulls and vertex enumeration of arrangements and polyhedra
    • D. Avis and K. Fukuda. A pivoting algorithm for convex hulls and vertex enumeration of arrangements and polyhedra. Discrete Computational Geometry, 8:295-313, 1992.
    • (1992) Discrete Computational Geometry , vol.8 , pp. 295-313
    • Avis, D.1    Fukuda, K.2
  • 3
    • 5144232431 scopus 로고    scopus 로고
    • Executing production schedules in the face of uncertainties: A review and some future directions
    • H. Aytug, M.A. Lawley, K.McKay, S.Mohan, and R. Uzsoy. Executing production schedules in the face of uncertainties: A review and some future directions. European Journal of Operational Research, 161(1):86-110, 2005.
    • (2005) European Journal of Operational Research , vol.161 , Issue.1 , pp. 86-110
    • Aytug, H.1    Lawley, M.A.2    McKay, K.3    Mohan, S.4    Uzsoy, R.5
  • 4
    • 0037081993 scopus 로고    scopus 로고
    • A novel branch and bound algorithm for scheduling flowshop plants with uncertain processing times
    • J. Balasubramanian and I.E. Grossmann. A novel branch and bound algorithm for scheduling flowshop plants with uncertain processing times. Computers and Chemical Engineering, 26:41-57, 2002.
    • (2002) Computers and Chemical Engineering , vol.26 , pp. 41-57
    • Balasubramanian, J.1    Grossmann, I.E.2
  • 5
    • 0037445865 scopus 로고    scopus 로고
    • Scheduling optimization under uncertainty - An alternative approach
    • J. Balasubramanian and I.E. Grossmann. Scheduling optimization under uncertainty - an alternative approach. Computers and Chemical Engineering, 27(4):469-490, 2003.
    • (2003) Computers and Chemical Engineering , vol.27 , Issue.4 , pp. 469-490
    • Balasubramanian, J.1    Grossmann, I.E.2
  • 6
    • 3042702298 scopus 로고    scopus 로고
    • Approximation to multistage stochastic optimization in multiperiod batch plant scheduling under demand uncertainty
    • J. Balasubramanian and I.E. Grossmann. Approximation to multistage stochastic optimization in multiperiod batch plant scheduling under demand uncertainty. Industrial and Engineering Chemistry Research, 43(14):3695- 3713, 2004.
    • (2004) Industrial and Engineering Chemistry Research , vol.43 , Issue.14 , pp. 3695-3713
    • Balasubramanian, J.1    Grossmann, I.E.2
  • 7
    • 0030417871 scopus 로고    scopus 로고
    • Decomposition techniques for the solution of large-scale scheduling problems
    • M.H. Bassett, J.F. Pekny, and G.V. Reklaitis. Decomposition techniques for the solution of large-scale scheduling problems. AIChE Journal, 42:3373-3387, 1996.
    • (1996) AIChE Journal , vol.42 , pp. 3373-3387
    • Bassett, M.H.1    Pekny, J.F.2    Reklaitis, G.V.3
  • 8
    • 0031146289 scopus 로고    scopus 로고
    • Using detailed scheduling to obtain realistic operating policies for a batch processing facility
    • M.H. Bassett, J.F. Pekny, and G.V. Reklaitis. Using detailed scheduling to obtain realistic operating policies for a batch processing facility. Industrial and Engineering Chemistry Research, 36:1717-1726, 1997.
    • (1997) Industrial and Engineering Chemistry Research , vol.36 , pp. 1717-1726
    • Bassett, M.H.1    Pekny, J.F.2    Reklaitis, G.V.3
  • 9
    • 0036027604 scopus 로고    scopus 로고
    • The explicit linear quadratic regulator for constrained systems
    • A. Bemporad, M. Morari, V. Dua, and E.N. Pistikopoulos. The explicit linear quadratic regulator for constrained systems. Automatica, 38(1):3-20, 2002.
    • (2002) Automatica , vol.38 , Issue.1 , pp. 3-20
    • Bemporad, A.1    Morari, M.2    Dua, V.3    Pistikopoulos, E.N.4
  • 11
    • 84870613023 scopus 로고    scopus 로고
    • Robust discrete optimization and network flows
    • D. Bertsimas and M. Sim. Robust discrete optimization and network flows. Mathematic Progress, 98:49-71, 2003.
    • (2003) Mathematic Progress , vol.98 , pp. 49-71
    • Bertsimas, D.1    Sim, M.2
  • 12
    • 0002668131 scopus 로고
    • Sharp lower bounds and efficient algorithms for the simple plant location problem
    • O. Bilde and J. Krarup. Sharp lower bounds and efficient algorithms for the simple plant location problem. Annals of Discrete Mathematics, 1: 79-97, 1977.
    • (1977) Annals of Discrete Mathematics , vol.1 , pp. 79-97
    • Bilde, O.1    Krarup, J.2
  • 13
    • 0025416591 scopus 로고
    • Simultaneous production planning and scheduling in multiproduct batch plants
    • D.B. Birewar and I.E. Grossmann. Simultaneous production planning and scheduling in multiproduct batch plants. Industrial and Engineering Chemistry Research, 29(4):570-580, 1990.
    • (1990) Industrial and Engineering Chemistry Research , vol.29 , Issue.4 , pp. 570-580
    • Birewar, D.B.1    Grossmann, I.E.2
  • 15
    • 14344251891 scopus 로고    scopus 로고
    • Addressing robustness in scheduling batch processes with uncertain operation times
    • A. Bonfill, A. Espuna, and L. Puigjaner. Addressing robustness in scheduling batch processes with uncertain operation times. Industrial and Engineering Chemistry Research, 44(5):1524-1534, 2005.
    • (2005) Industrial and Engineering Chemistry Research , vol.44 , Issue.5 , pp. 1524-1534
    • Bonfill, A.1    Espuna, A.2    Puigjaner, L.3
  • 17
    • 0034661221 scopus 로고    scopus 로고
    • A model predictive framework for planning and scheduling problems: A case study of consumer goods supply chain
    • S. Bose and J. Pekny. A model predictive framework for planning and scheduling problems: a case study of consumer goods supply chain. Computers and Chemical Engineering, 24:329-335, 2000.
    • (2000) Computers and Chemical Engineering , vol.24 , pp. 329-335
    • Bose, S.1    Pekny, J.2
  • 18
    • 0038337833 scopus 로고    scopus 로고
    • Optimal periodic scheduling of batch plants using rtn-based discrete and continuous-time formulations: A case study approach
    • P. Castro, A. Barbosa-Povoa, and H. Matos. Optimal periodic scheduling of batch plants using rtn-based discrete and continuous-time formulations: A case study approach. Industrial and Engineering Chemistry Research, 42:3346- 3360, 2003.
    • (2003) Industrial and Engineering Chemistry Research , vol.42 , pp. 3346-3360
    • Castro, P.1    Barbosa-Povoa, A.2    Matos, H.3
  • 19
    • 0000522889 scopus 로고
    • Analysis of periodic and event-driven rescheduling policies in dynamic shops
    • L. Churh and R. Uzsoy. Analysis of periodic and event-driven rescheduling policies in dynamic shops. International Computer Integrated Manufacturing, 5:153-163, 1992.
    • (1992) International Computer Integrated Manufacturing , vol.5 , pp. 153-163
    • Churh, L.1    Uzsoy, R.2
  • 20
    • 0002215475 scopus 로고    scopus 로고
    • On the convergence of derivativefree methods for unconstrained optimization
    • Report 96/10, Cambridge
    • A.R. Conn, K. Scheinberg, and P.L. Toint On the convergence of derivativefree methods for unconstrained optimization. In Invited Presentation at the Powellfest, Report 96/10, Cambridge, 1996.
    • (1996) Invited Presentation at the Powellfest
    • Conn, A.R.1    Scheinberg, K.2    Toint, P.L.3
  • 21
    • 0001499525 scopus 로고
    • Minimizing the effects of batch process variability using online schedule modification
    • B.J. Cott and S. Macchietto. Minimizing the effects of batch process variability using online schedule modification. Computers and Chemical Engineering, 13:105-113, 1989.
    • (1989) Computers and Chemical Engineering , vol.13 , pp. 105-113
    • Cott, B.J.1    Macchietto, S.2
  • 23
    • 0029254356 scopus 로고
    • Robust scheduling to hedge against processing time uncertainty in single-stage production
    • R.L. Daniels and P. Kouvelis. Robust scheduling to hedge against processing time uncertainty in single-stage production. Management Science, 41:363- 376, 1995.
    • (1995) Management Science , vol.41 , pp. 363-376
    • Daniels, R.L.1    Kouvelis, P.2
  • 24
    • 0000813562 scopus 로고
    • Linear programming under uncertainty
    • G.B. Dantzig. Linear programming under uncertainty. Management Science, 1:197-206, 1955.
    • (1955) Management Science , vol.1 , pp. 197-206
    • Dantzig, G.B.1
  • 25
    • 0001226544 scopus 로고
    • A lagrangean relaxation approach for very-large-scale capacitated lot-sizing
    • M. Diaby, H.C. Bahl, M.H. Karwan, and S. Zionts. A lagrangean relaxation approach for very-large-scale capacitated lot-sizing. Management Science, 9:1329, 1992.
    • (1992) Management Science , vol.9 , pp. 1329
    • Diaby, M.1    Bahl, H.C.2    Karwan, M.H.3    Zionts, S.4
  • 26
    • 0000685021 scopus 로고    scopus 로고
    • Rtn-based rolling horizon algorithms for medium term scheduling of multipurpose plants
    • A.D. Dimitriadis, N. Shah, and C.C. Pantelides. Rtn-based rolling horizon algorithms for medium term scheduling of multipurpose plants. Computers and Chemical Engineering, 21:S1061-S1066, 1997.Suppl. S.
    • (1997) Computers and Chemical Engineering , vol.21 , pp. S1061-S1066
    • Dimitriadis, A.D.1    Shah, N.2    Pantelides, C.C.3
  • 27
    • 4143089013 scopus 로고    scopus 로고
    • An outer-approximation algorithm for the solution of multiparametric minlp problems
    • V. Dua and E.N. Pistikopoulos. An outer-approximation algorithm for the solution of multiparametric minlp problems. Computers and Chemical Engineering, 22:S955 - S958, 1998.
    • (1998) Computers and Chemical Engineering , vol.22 , pp. S955-S958
    • Dua, V.1    Pistikopoulos, E.N.2
  • 28
    • 0033494781 scopus 로고    scopus 로고
    • Algorithms for the solution of multiparametric mixed-integer nonlinear optimization problems
    • V. Dua and E.N. Pistikopoulos. Algorithms for the solution of multiparametric mixed-integer nonlinear optimization problems. Industrial and Engineering Chemistry Research, 38:3976 - 3987, 1999.
    • (1999) Industrial and Engineering Chemistry Research , vol.38 , pp. 3976-3987
    • Dua, V.1    Pistikopoulos, E.N.2
  • 30
    • 0031412922 scopus 로고    scopus 로고
    • A decomposition heuristic for scheduling the general batch chemical plant
    • A. Elkamel, M. Zentner, J.F. Pekny, and G.V. Reklaitis. A decomposition heuristic for scheduling the general batch chemical plant. Engineering Optimization, 28(4):299-330, 1997.
    • (1997) Engineering Optimization , vol.28 , Issue.4 , pp. 299-330
    • Elkamel, A.1    Zentner, M.2    Pekny, J.F.3    Reklaitis, G.V.4
  • 32
    • 0018031445 scopus 로고
    • A dual-based procedure for uncapacitated facility location
    • D. Erlenkotter. A dual-based procedure for uncapacitated facility location. Operational Research, 26(1):992-1009, 1978.
    • (1978) Operational Research , vol.26 , Issue.1 , pp. 992-1009
    • Erlenkotter, D.1
  • 33
    • 0033131859 scopus 로고    scopus 로고
    • A modeling and an algorithmic framework for oil supply, transformation and distribution optimization under uncertainty
    • L. Escudero, F.J. Quintana, and J. Salmeron. A modeling and an algorithmic framework for oil supply, transformation and distribution optimization under uncertainty. European Journal of Operational Research, 114:638-656, 1999.
    • (1999) European Journal of Operational Research , vol.114 , pp. 638-656
    • Escudero, L.1    Quintana, F.J.2    Salmeron, J.3
  • 35
    • 0002983810 scopus 로고
    • Optimal solution of scheduling problems using lagrange multipliers: Part i
    • M.L. Fisher. Optimal solution of scheduling problems using lagrange multipliers: Part i. Operational Research, 21:1114-1127, 1973.
    • (1973) Operational Research , vol.21 , pp. 1114-1127
    • Fisher, M.L.1
  • 36
    • 84976472453 scopus 로고
    • Database location in a computer network
    • M.L. Fisher and D.S. Hochbaum. Database location in a computer network. Journ. ACM, 27(718-735), 1980.
    • (1980) Journ. ACM , vol.27 , Issue.718-735
    • Fisher, M.L.1    Hochbaum, D.S.2
  • 37
    • 0000554525 scopus 로고
    • Optimal solution of set covering/partitioning problems using dual heuristics
    • M.L. Fisher and P. Kedia. Optimal solution of set covering/partitioning problems using dual heuristics. Management Science, 39(67-88), 1990.
    • (1990) Management Science , vol.39 , Issue.67-88
    • Fisher, M.L.1    Kedia, P.2
  • 38
    • 2442583184 scopus 로고    scopus 로고
    • Continuous-time versus discrete-time approaches for scheduling of chemical processes: A review
    • C.A. Floudas and X. Lin. Continuous-time versus discrete-time approaches for scheduling of chemical processes: A review. Computers and Chemical Engineering, 28:2109-2129, 2004.
    • (2004) Computers and Chemical Engineering , vol.28 , pp. 2109-2129
    • Floudas, C.A.1    Lin, X.2
  • 41
    • 0002554041 scopus 로고
    • Lagrangean relaxation and its uses in integer programming
    • A.M. Geoffrion. Lagrangean relaxation and its uses in integer programming. Mathematic Programmatic Studies, 2:82, 1974.
    • (1974) Mathematic Programmatic Studies , vol.2 , pp. 82
    • Geoffrion, A.M.1
  • 42
    • 2342539060 scopus 로고    scopus 로고
    • A stochastic programming approach to planning of offshore gas field developments under uncertainty in reserves
    • V. Goel and I.E. Grossmann. A stochastic programming approach to planning of offshore gas field developments under uncertainty in reserves. Computers and Chemical Engineering, 28:1409-1429, 2004.
    • (2004) Computers and Chemical Engineering , vol.28 , pp. 1409-1429
    • Goel, V.1    Grossmann, I.E.2
  • 43
    • 0020100192 scopus 로고
    • Using lagrangean techniques to solve hierarchical production planning problems
    • S.C. Graves. Using lagrangean techniques to solve hierarchical production planning problems. Management Science, 28:260, 1982.
    • (1982) Management Science , vol.28 , pp. 260
    • Graves, S.C.1
  • 45
    • 52449148785 scopus 로고    scopus 로고
    • Lagrangean relaxation
    • M. Guignard. Lagrangean relaxation. Top, 11(2):151-228, 2003.
    • (2003) Top , vol.11 , Issue.2 , pp. 151-228
    • Guignard, M.1
  • 46
    • 0023451776 scopus 로고
    • Lagrangean decomposition: A model yielding stronger lagrangean bounds
    • M. Guignard and S. Kim. Lagrangean decomposition: A model yielding stronger lagrangean bounds. Mathematic Programing, 39:215, 1987.
    • (1987) Mathematic Programing , vol.39 , pp. 215
    • Guignard, M.1    Kim, S.2
  • 47
    • 84987028342 scopus 로고
    • An application of lagrangean decomposition to the resource-constrained minimum weighted arborescence problem
    • M. Guignard and M.B. Rosenwein. An application of lagrangean decomposition to the resource-constrained minimum weighted arborescence problem. Networks, 20:345-359, 1990.
    • (1990) Networks , vol.20 , pp. 345-359
    • Guignard, M.1    Rosenwein, M.B.2
  • 48
    • 0348231896 scopus 로고    scopus 로고
    • Sensitivity analysis of tree scheduling on two machines with communication delays
    • F. Guinand, A. Moukrim, and E. Sanlaville. Sensitivity analysis of tree scheduling on two machines with communication delays. Parallel Computing, 30(1):103-120, 2004.
    • (2004) Parallel Computing , vol.30 , Issue.1 , pp. 103-120
    • Guinand, F.1    Moukrim, A.2    Sanlaville, E.3
  • 49
    • 0032960899 scopus 로고    scopus 로고
    • A hierarchical lagrangean relaxation procedure for solving midterm planning problem
    • A. Gupta and C.D. Maranas. A hierarchical lagrangean relaxation procedure for solving midterm planning problem. Industrial and Engineering Chemistry Research, 38:1937, 1999.
    • (1999) Industrial and Engineering Chemistry Research , vol.38 , pp. 1937
    • Gupta, A.1    Maranas, C.D.2
  • 50
    • 3543072290 scopus 로고    scopus 로고
    • Sensitivity analysis for scheduling problems
    • N.G. Hall and M.E. Posner. Sensitivity analysis for scheduling problems. Journal of Scheduling, 7(1):49-83, 2004.
    • (2004) Journal of Scheduling , vol.7 , Issue.1 , pp. 49-83
    • Hall, N.G.1    Posner, M.E.2
  • 51
    • 0035890549 scopus 로고    scopus 로고
    • A decomposition approach for the scheduling of a steel plant production
    • I. Harjunkoski and I.E. Grossmann. A decomposition approach for the scheduling of a steel plant production. Computers and Chemical Engineering, 25(11-12):1647-1660, 2001.
    • (2001) Computers and Chemical Engineering , vol.25 , Issue.11-12 , pp. 1647-1660
    • Harjunkoski, I.1    Grossmann, I.E.2
  • 52
    • 0033180207 scopus 로고    scopus 로고
    • Disjunctive multiperiod optimization methods for design and planning of chemical process systems
    • S.A.V.D. Heever and I.E. Grossmann. Disjunctive multiperiod optimization methods for design and planning of chemical process systems. Computers and Chemical Engineering, 23:1075-1095, 1999.
    • (1999) Computers and Chemical Engineering , vol.23 , pp. 1075-1095
    • Heever, S.A.V.D.1    Grossmann, I.E.2
  • 53
    • 0001050402 scopus 로고
    • The traveling salesman problem and minimum spanning trees
    • M. Held and R.M. Karp. The traveling salesman problem and minimum spanning trees. Operational Research, 18:1138-1162, 1970.
    • (1970) Operational Research , vol.18 , pp. 1138-1162
    • Held, M.1    Karp, R.M.2
  • 54
    • 0036138955 scopus 로고    scopus 로고
    • A hybrid parametric/stochastic programming approach for mixed- integer nonlinear problems under uncertainty
    • T.S. Hene, V. Dua, and E.N. Pistikopoulos. A hybrid parametric/stochastic programming approach for mixed- integer nonlinear problems under uncertainty. Industrial and Engineering Chemistry Research, 41:67-77, 2002.
    • (2002) Industrial and Engineering Chemistry Research , vol.41 , pp. 67-77
    • Hene, T.S.1    Dua, V.2    Pistikopoulos, E.N.3
  • 57
    • 0029224646 scopus 로고
    • Incorporating on-line scheduling strategies in integrated batch production control
    • A. Huercio, A. Espuna, and L. Puigjaner. Incorporating on-line scheduling strategies in integrated batch production control. Computers and Chemical Engineering, 19:S609-S615, 1995.
    • (1995) Computers and Chemical Engineering , vol.19 , pp. S609-S615
    • Huercio, A.1    Espuna, A.2    Puigjaner, L.3
  • 58
    • 0032216021 scopus 로고    scopus 로고
    • Effective continuous-time formulation for short-term scheduling. 1. multipurpose batch processes
    • M.G. Ierapetritou and C.A. Floudas. Effective continuous-time formulation for short-term scheduling. 1. multipurpose batch processes. Industrial and Engineering Chemistry Research, 37(11):4341-4359, 1998.
    • (1998) Industrial and Engineering Chemistry Research , vol.37 , Issue.11 , pp. 4341-4359
    • Ierapetritou, M.G.1    Floudas, C.A.2
  • 59
    • 0032877613 scopus 로고    scopus 로고
    • Effective continuous-time formulation for short-term scheduling. 3. multiple intermediate due dates
    • M.G. Ierapetritou, T.S. Hene, and C.A. Floudas. Effective continuous-time formulation for short-term scheduling. 3. multiple intermediate due dates. Industrial and Engineering Chemistry Research, 38(9):3446-3461, 1999.
    • (1999) Industrial and Engineering Chemistry Research , vol.38 , Issue.9 , pp. 3446-3461
    • Ierapetritou, M.G.1    Hene, T.S.2    Floudas, C.A.3
  • 63
    • 33745739750 scopus 로고    scopus 로고
    • Uncertainty analysis on the right-hand-side for MILP problems
    • Z. Jia and M.G. Ierapetritou. Uncertainty analysis on the right-hand-side for MILP problems. AIChE Journal, 52:2486, 2006.
    • (2006) AIChE Journal , vol.52 , pp. 2486
    • Jia, Z.1    Ierapetritou, M.G.2
  • 64
    • 33846267725 scopus 로고    scopus 로고
    • Generate pareto optimal solutions of scheduling problems using normal boundary intersection technique
    • Z. Jia and M.G. Ierapetritou. Generate pareto optimal solutions of scheduling problems using normal boundary intersection technique. Computers and Chemical Engineering, 31(4):268-280, 2007.
    • (2007) Computers and Chemical Engineering , vol.31 , Issue.4 , pp. 268-280
    • Jia, Z.1    Ierapetritou, M.G.2
  • 66
    • 84976508886 scopus 로고    scopus 로고
    • Rescheduling frequency in an fms with uncertain processing times and unreliable machines
    • S. Karabuk and I. Sabuncuoglu. Rescheduling frequency in an fms with uncertain processing times and unreliable machines. Research Report, pages IEOR-9704, 1997.
    • (1997) Research Report
    • Karabuk, S.1    Sabuncuoglu, I.2
  • 67
    • 0001547779 scopus 로고
    • The cutting-plane method for solving convex programs
    • J.E. Kelley. The cutting-plane method for solving convex programs. Journal SIAM, 8:703-712, 1960.
    • (1960) Journal SIAM , vol.8 , pp. 703-712
    • Kelley, J.E.1
  • 68
    • 0027545176 scopus 로고
    • A general algorithm for short-term scheduling of batch operations. i. MILP formulation
    • E. Kondili, C.C. Pantelides, and R.W.H. Sargent. A general algorithm for short-term scheduling of batch operations. i. MILP formulation. Computers and Chemical Engineering, 17:211-227, 1993.
    • (1993) Computers and Chemical Engineering , vol.17 , pp. 211-227
    • Kondili, E.1    Pantelides, C.C.2    Sargent, R.W.H.3
  • 69
    • 0033894477 scopus 로고    scopus 로고
    • Robust scheduling of a twomachine flow shop with uncertain processing times
    • P. Kouvelis, R.L. Daniels, and G. Vairaktarakis. Robust scheduling of a twomachine flow shop with uncertain processing times. IIE Trans, 32:421-432, 2000.
    • (2000) IIE Trans , vol.32 , pp. 421-432
    • Kouvelis, P.1    Daniels, R.L.2    Vairaktarakis, G.3
  • 70
    • 0032208369 scopus 로고    scopus 로고
    • Applying robust optimization to capacity expansion of one location in telecommunications with demand uncertainty
    • M. Laguna. Applying robust optimization to capacity expansion of one location in telecommunications with demand uncertainty. Management Science, 44:S101-S110, 1998.
    • (1998) Management Science , vol.44 , pp. S101-S110
    • Laguna, M.1
  • 71
    • 0344362809 scopus 로고
    • An algorithm for minimizing convex functions
    • North Holland
    • C. Lemarechal. An algorithm for minimizing convex functions. In Proceedings IFIP'74 Congress, pages 552-556. North Holland, 1974.
    • (1974) Proceedings IFIP'74 Congress , pp. 552-556
    • Lemarechal, C.1
  • 72
    • 37749011834 scopus 로고    scopus 로고
    • Process scheduling under uncertainty using multiparametric programming
    • Z. Li and Marianthi G. Ierapetritou. Process scheduling under uncertainty using multiparametric programming. AIChE Journal, 53:3183-3203, 2007.
    • (2007) AIChE Journal , vol.53 , pp. 3183-3203
    • Li, Z.1    Ierapetritou, M.G.2
  • 73
    • 1942532282 scopus 로고    scopus 로고
    • A new robust optimization approach for scheduling under uncertainty: I. bounded uncertainty
    • X. Lin, S.L. Janak, and C.A. Floudas. A new robust optimization approach for scheduling under uncertainty: I. bounded uncertainty. Computers and Chemical Engineering, 28:1069-1085, 2004.
    • (2004) Computers and Chemical Engineering , vol.28 , pp. 1069-1085
    • Lin, X.1    Janak, S.L.2    Floudas, C.A.3
  • 74
    • 0030107889 scopus 로고    scopus 로고
    • Long range planning in the process industries: A projection approach
    • M.L. Liu and N.V. Sahinidis. Long range planning in the process industries: A projection approach. Computers and Operations Research, 23(3): 237-253, 1996.
    • (1996) Computers and Operations Research , vol.23 , Issue.3 , pp. 237-253
    • Liu, M.L.1    Sahinidis, N.V.2
  • 76
    • 0031188902 scopus 로고    scopus 로고
    • Planning and scheduling of parallel semicontinuous processes. 1. production planning
    • C.M. McDonald and I.A. Karimi. Planning and scheduling of parallel semicontinuous processes. 1. production planning. Industrial and Engineering Chemistry Research, 36:2691-2700, 1997.
    • (1997) Industrial and Engineering Chemistry Research , vol.36 , pp. 2691-2700
    • McDonald, C.M.1    Karimi, I.A.2
  • 77
  • 78
    • 1942500440 scopus 로고    scopus 로고
    • An MILP framework for batch reactive scheduling with limited discrete resources
    • C.A. Mendez and J. Cerda. An MILP framework for batch reactive scheduling with limited discrete resources. Computers and Chemical Engineering, 28:1059-1068, 2004.
    • (2004) Computers and Chemical Engineering , vol.28 , pp. 1059-1068
    • Mendez, C.A.1    Cerda, J.2
  • 79
    • 33748102266 scopus 로고    scopus 로고
    • State-of-the-art review of optimization methods for short-term scheduling of batch processes
    • C.A. Mendez, J. Cerda, I.E. Grossmann, I. Harjunkoski, and M. Fahl. State-of-the-art review of optimization methods for short-term scheduling of batch processes. Computers and Chemical Engineering, 30(6-7):913- 946, 2006.
    • (2006) Computers and Chemical Engineering , vol.30 , Issue.6-7 , pp. 913-946
    • Mendez, C.A.1    Cerda, J.2    Grossmann, I.E.3    Harjunkoski, I.4    Fahl, M.5
  • 80
  • 81
    • 0000238336 scopus 로고
    • A simplex method for function minimization
    • J.A. Nelder and R. Mead. A simplex method for function minimization. Computer Journal, 308-313, 1965.
    • (1965) Computer Journal , pp. 308-313
    • Nelder, J.A.1    Mead, R.2
  • 82
    • 0035869053 scopus 로고    scopus 로고
    • General continuous-time models for production planning and scheduling of batch processing plants: Mixed integer linear program formulations and computational issues
    • S. Orcun, I.K. Altinel, and O. Hortacsu. General continuous-time models for production planning and scheduling of batch processing plants: Mixed integer linear program formulations and computational issues. Computers and Chemical Engineering, 25:371-389, 2001.
    • (2001) Computers and Chemical Engineering , vol.25 , pp. 371-389
    • Orcun, S.1    Altinel, I.K.2    Hortacsu, O.3
  • 83
    • 0029713693 scopus 로고    scopus 로고
    • Scheduling of batch processes with operational uncertainties
    • S. Orcun, K. Altinel, and O. Hortacsu. Scheduling of batch processes with operational uncertainties. Computers and Chemical Engineering, 20:S1191- S1196, 1996.
    • (1996) Computers and Chemical Engineering , vol.20 , pp. S1191-S1196
    • Orcun, S.1    Altinel, K.2    Hortacsu, O.3
  • 84
    • 0031335946 scopus 로고    scopus 로고
    • A combination of the genetic algorithm and lagrangian relaxation decomposition techniques for the generation unit commitment problem
    • S.O. Orero and M.R. Irving. A combination of the genetic algorithm and lagrangian relaxation decomposition techniques for the generation unit commitment problem. Electric Power Systemic Research, 43:149-156, 1997.
    • (1997) Electric Power Systemic Research , vol.43 , pp. 149-156
    • Orero, S.O.1    Irving, M.R.2
  • 86
    • 0027676057 scopus 로고    scopus 로고
    • A hierarchical approach for campaign planning of multipurpose batch plants
    • L.G. Papageorgiou and C.C. Pantelides. A hierarchical approach for campaign planning of multipurpose batch plants. Computers and Chemical Engineering, 17:S27-S32, 2000.
    • (2000) Computers and Chemical Engineering , vol.17 , pp. S27-S32
    • Papageorgiou, L.G.1    Pantelides, C.C.2
  • 88
    • 0031271861 scopus 로고    scopus 로고
    • Multiperiod planning and scheduling of multiproduct batch plants under demand uncertainty
    • S.B. Petkov and C.D. Maranas. Multiperiod planning and scheduling of multiproduct batch plants under demand uncertainty. Industrial and Engineering Chemistry Research, 36(11):4864-4881, 1997.
    • (1997) Industrial and Engineering Chemistry Research , vol.36 , Issue.11 , pp. 4864-4881
    • Petkov, S.B.1    Maranas, C.D.2
  • 89
    • 33746054949 scopus 로고    scopus 로고
    • A fuzzy logic based production scheduling/ rescheduling in the presence of uncertain disruptions
    • D. Petrovic and A. Duenas. A fuzzy logic based production scheduling/ rescheduling in the presence of uncertain disruptions. Fuzzy Sets and Systems, 2006.
    • (2006) Fuzzy Sets and Systems
    • Petrovic, D.1    Duenas, A.2
  • 90
    • 0026203733 scopus 로고
    • Routing container ships using lagrangean relaxation and decomposition
    • K. Rana and R.G. Vickson. Routing container ships using lagrangean relaxation and decomposition. Transactions of Science, 25(3), 1991.
    • (1991) Transactions of Science , vol.25 , Issue.3
    • Rana, K.1    Vickson, R.G.2
  • 93
    • 0035339891 scopus 로고    scopus 로고
    • On-line fault diagnosis system support for reactive scheduling in multipurpose batch chemical plants
    • D. Ruiz, J. Canton, J.M. Nougues, A. Espuna, and L. Puigjaner. On-line fault diagnosis system support for reactive scheduling in multipurpose batch chemical plants. Computers and Chemical Engineering, 25:829-837, 2001.
    • (2001) Computers and Chemical Engineering , vol.25 , pp. 829-837
    • Ruiz, D.1    Canton, J.2    Nougues, J.M.3    Espuna, A.4    Puigjaner, L.5
  • 94
    • 1942468138 scopus 로고    scopus 로고
    • A bilevel programming framework for enterprise-wide process networks under uncertainty
    • J.H. Ryu, V. Dua, and E.N. Pistikopoulos. A bilevel programming framework for enterprise-wide process networks under uncertainty. Computers and Chemical Engineering, 28(6-7):1121-1129, 2004.
    • (2004) Computers and Chemical Engineering , vol.28 , Issue.6-7 , pp. 1121-1129
    • Ryu, J.H.1    Dua, V.2    Pistikopoulos, E.N.3
  • 95
    • 84976489470 scopus 로고    scopus 로고
    • Analysis of reactive scheduling problems in a job shop environment
    • I. Sabuncuoglu and M. Bayiz. Analysis of reactive scheduling problems in a job shop environment. Research Report, pages IEOR-9826, 1998.
    • (1998) Research Report
    • Sabuncuoglu, I.1    Bayiz, M.2
  • 97
  • 99
    • 0031193217 scopus 로고    scopus 로고
    • Batch production and preventive maintenance scheduling under equipment failure uncertainty
    • E. Sanmarti, A. Espuna, and L. Puigjaner. Batch production and preventive maintenance scheduling under equipment failure uncertainty. Computers and Chemical Engineering, 21(10):1157-1168, 1997.
    • (1997) Computers and Chemical Engineering , vol.21 , Issue.10 , pp. 1157-1168
    • Sanmarti, E.1    Espuna, A.2    Puigjaner, L.3
  • 100
    • 0029723654 scopus 로고    scopus 로고
    • A combined scheduling/ reactive scheduling strategy to minimize the effect of process operations uncertainty in batch plants
    • E. Sanmarti, A. Huercio, A. Espuna, and L. Puigjaner. A combined scheduling/ reactive scheduling strategy to minimize the effect of process operations uncertainty in batch plants. Computers and Chemical Engineering, 20:1263- 1268, 1996.
    • (1996) Computers and Chemical Engineering , vol.20 , pp. 1263-1268
    • Sanmarti, E.1    Huercio, A.2    Espuna, A.3    Puigjaner, L.4
  • 104
    • 0027545175 scopus 로고
    • A general algorithm for short term scheduling of batch operations - II. Computational issues
    • N. Shah and C.C. Pantelides. A general algorithm for short term scheduling of batch operations - II. Computational issues. Computers and Chemical Engineering, 17:229, 1993.
    • (1993) Computers and Chemical Engineering , vol.17 , pp. 229
    • Shah, N.1    Pantelides, C.C.2
  • 106
    • 0010680207 scopus 로고
    • Convex programming with set-inclusive constraints and applications to inexact linear programming
    • A.L. Soyster. Convex programming with set-inclusive constraints and applications to inexact linear programming. Operations Research, 21:1154- 1157, 1973.
    • (1973) Operations Research , vol.21 , pp. 1154-1157
    • Soyster, A.L.1
  • 107
    • 0034661239 scopus 로고    scopus 로고
    • A simulation-optimization framework for addressing combinatorial and stochastic aspects of an r&d pipeline management problem
    • D. Subramanian, J.F. Pekny, and G.V. Reklaitis. A simulation-optimization framework for addressing combinatorial and stochastic aspects of an r&d pipeline management problem. Computers and Chemical Engineering, 24: 1005-1011, 2000.
    • (2000) Computers and Chemical Engineering , vol.24 , pp. 1005-1011
    • Subramanian, D.1    Pekny, J.F.2    Reklaitis, G.V.3
  • 109
    • 0022230531 scopus 로고
    • Lagrangean relaxation for the multi-item capacitated lot-sizing problem: A heuristic implementation
    • J.M. Thizy and L.N.V. Wassenhove. Lagrangean relaxation for the multi-item capacitated lot-sizing problem: A heuristic implementation. IIE Trans, 17: 308, 1985.
    • (1985) IIE Trans , vol.17 , pp. 308
    • Thizy, J.M.1    Wassenhove, L.N.V.2
  • 110
    • 0041974673 scopus 로고
    • A problem expanding parametric programming method for solving the job shop scheduling problem
    • G.L. Thompson and D.J. Zawack. A problem expanding parametric programming method for solving the job shop scheduling problem. Annals of Operations Research, 4(1):327 - 342, 1985.
    • (1985) Annals of Operations Research , vol.4 , Issue.1 , pp. 327-342
    • Thompson, G.L.1    Zawack, D.J.2
  • 111
    • 0035711007 scopus 로고    scopus 로고
    • An algorithm for multiparametric quadratic programming and explicit MPC solutions
    • P. Tondel, T.A. Johansen, and A. Bemporad. An algorithm for multiparametric quadratic programming and explicit MPC solutions. In IEEE Conference on Decision and Control, pages 1199-1204, 2001.
    • (2001) IEEE Conference on Decision and Control , pp. 1199-1204
    • Tondel, P.1    Johansen, T.A.2    Bemporad, A.3
  • 112
    • 0030215804 scopus 로고    scopus 로고
    • Logic-based MINLP algorithms for the optimization of process systems with discontinuous investment costs-multiple size regions
    • M. Turkay and I.E. Grossmann. Logic-based MINLP algorithms for the optimization of process systems with discontinuous investment costs-multiple size regions. Industrial and Engineering Chemistry Research, 35:2611-2623, 1996.
    • (1996) Industrial and Engineering Chemistry Research , vol.35 , pp. 2611-2623
    • Turkay, M.1    Grossmann, I.E.2
  • 113
    • 0242642748 scopus 로고    scopus 로고
    • A strategy for the integration of production planning and reactive scheduling in the optimization of a hydrogen supply network
    • S.A.V.E. Heever and I.E. Grossmann. A strategy for the integration of production planning and reactive scheduling in the optimization of a hydrogen supply network. Computers and Chemical Engineering, 27(12):1813-1839, 2003.
    • (2003) Computers and Chemical Engineering , vol.27 , Issue.12 , pp. 1813-1839
    • Heever, S.A.V.E.1    Grossmann, I.E.2
  • 115
    • 0035904351 scopus 로고    scopus 로고
    • Robust short-term scheduling of multiproduct batch plants under demand uncertainty
    • J.P. Vin and M.G. Ierapetritou. Robust short-term scheduling of multiproduct batch plants under demand uncertainty. Industrial and Engineering Chemistry Research, 40:4543-4554, 2001.
    • (2001) Industrial and Engineering Chemistry Research , vol.40 , pp. 4543-4554
    • Vin, J.P.1    Ierapetritou, M.G.2
  • 116
    • 0141859879 scopus 로고    scopus 로고
    • A fuzzy robust scheduling approach for product development projects
    • J. Wang. A fuzzy robust scheduling approach for product development projects. European Journal of Operational Research, 152(1):180-194, 2004.
    • (2004) European Journal of Operational Research , vol.152 , Issue.1 , pp. 180-194
    • Wang, J.1
  • 117
    • 84976487681 scopus 로고    scopus 로고
    • Hierarchical approach for production planning andscheduling under uncertainty using continuous-time formulation
    • Princeton University
    • D. Wu and M.G. Ierapetritou. Hierarchical approach for production planning andscheduling under uncertainty using continuous-time formulation. In Foundations of Computer-Aided Process Design 2004 Conference Proceedings, Princeton University, 2004.
    • (2004) Foundations of Computer-Aided Process Design 2004 Conference Proceedings
    • Wu, D.1    Ierapetritou, M.G.2
  • 118
    • 0033881526 scopus 로고    scopus 로고
    • A robust optimization model for stochastic logistic problems
    • C. Yu and H. Li. A robust optimization model for stochastic logistic problems. International Journal of Production Economics, 64:385-397, 2000.
    • (2000) International Journal of Production Economics , vol.64 , pp. 385-397
    • Yu, C.1    Li, H.2
  • 119
    • 0035205124 scopus 로고    scopus 로고
    • Novel continuous-time milp formulation for multipurpose batch plants. 2. integrated planning and scheduling
    • X.X. Zhu and T. Majozi. Novel continuous-time milp formulation for multipurpose batch plants. 2. integrated planning and scheduling. Industrial and Engineering Chemistry Research, 40:5621-5634, 2001.
    • (2001) Industrial and Engineering Chemistry Research , vol.40 , pp. 5621-5634
    • Zhu, X.X.1    Majozi, T.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.