-
1
-
-
84912655917
-
The role of mathematical programming in production planning
-
Lawrence, K. D., Zanakis, S. H., Eds.; Industrial Engineering and Management Press: Atlanta, GA
-
Bitran, G. R.; Hax, A. C. The role of mathematical programming in production planning. In Production Planning and Scheduling: Mathematical Programming Applications; Lawrence, K. D., Zanakis, S. H., Eds.; Industrial Engineering and Management Press: Atlanta, GA, 1984; p 21.
-
(1984)
Production Planning and Scheduling: Mathematical Programming Applications
, pp. 21
-
-
Bitran, G.R.1
Hax, A.C.2
-
3
-
-
0025400698
-
Economic lot scheduling for multiple products on parallel identical processors
-
Carreno, J. J. Economic lot scheduling for multiple products on parallel identical processors. Mgmt. Sci. 1990, 36 (3), 348.
-
(1990)
Mgmt. Sci.
, vol.36
, Issue.3
, pp. 348
-
-
Carreno, J.J.1
-
4
-
-
0023420909
-
The economic lot scheduling problem: Achieving feasibility using time-varying lot sizes
-
Dobson, G. The economic lot scheduling problem: Achieving feasibility using time-varying lot sizes. Oper. Res. 1987, 35 (5), 764.
-
(1987)
Oper. Res.
, vol.35
, Issue.5
, pp. 764
-
-
Dobson, G.1
-
5
-
-
0017931081
-
The economic lot scheduling (ELSP): Review and extensions
-
Elmaghraby, S. E. The economic lot scheduling (ELSP): Review and extensions. Mgmt. Sci. 1978, 24 (6), 587.
-
(1978)
Mgmt. Sci.
, vol.24
, Issue.6
, pp. 587
-
-
Elmaghraby, S.E.1
-
6
-
-
0016971681
-
Scheduling parallel production lines with changeover costs: Practical application of a quadratic assignment/LP approach
-
Geoffrion, A. M.; Graves, G. W. Scheduling parallel production lines with changeover costs: Practical application of a quadratic assignment/LP approach. Oper. Res. 1976, 24 (4), 595.
-
(1976)
Oper. Res.
, vol.24
, Issue.4
, pp. 595
-
-
Geoffrion, A.M.1
Graves, G.W.2
-
7
-
-
0027545176
-
A general algorithm for short-term scheduling of batch operations - I. MILP formulation
-
Kondili, E.; Pantelides, C. C.; Sargent, R. W. H. A general algorithm for short-term scheduling of batch operations - I. MILP formulation. Comput. Chem. Eng. 1993a 17 (2), 211.
-
(1993)
Comput. Chem. Eng.
, vol.17
, Issue.2
, pp. 211
-
-
Kondili, E.1
Pantelides, C.C.2
Sargent, R.W.H.3
-
8
-
-
0027676050
-
Production planning for the rational use of energy in multiproduct continuous plants
-
Kondili, E.; Shah, N.; Pantelides, C. C. Production planning for the rational use of energy in multiproduct continuous plants. Comput. Chem. Eng. 1993b, 17, S123.
-
(1993)
Comput. Chem. Eng.
, vol.17
-
-
Kondili, E.1
Shah, N.2
Pantelides, C.C.3
-
9
-
-
1542546250
-
A modular system for scheduling chemical plant production
-
Rippin, D. W. T., Hale, J. C., Davis, J. F., Eds.; Cache Publications: Austin, TX
-
Miller, D. L.; Singh, H.; Rogers, K. A. A modular system for scheduling chemical plant production. In Proceedings of FOCAPO II; Rippin, D. W. T., Hale, J. C., Davis, J. F., Eds.; Cache Publications: Austin, TX, 1993; p 355.
-
(1993)
Proceedings of FOCAPO II
, pp. 355
-
-
Miller, D.L.1
Singh, H.2
Rogers, K.A.3
-
11
-
-
0028173940
-
Strategic planning model for complete process flexibility
-
Norton, L. C.; Grossmann, I. E. Strategic planning model for complete process flexibility. Ind. Eng. Chem. Res. 1994, 33, 69.
-
(1994)
Ind. Eng. Chem. Res.
, vol.33
, pp. 69
-
-
Norton, L.C.1
Grossmann, I.E.2
-
12
-
-
0000763707
-
Unified frameworks for optimal process planning and scheduling
-
Rippin, D. W. T., Hale, J. C., Davis, J. F., Eds.; Cache Publications: Austin, TX
-
Pantelides, C. C. Unified frameworks for optimal process planning and scheduling. In Proceedings of FOCAPO II; Rippin, D. W. T., Hale, J. C., Davis, J. F., Eds.; Cache Publications: Austin, TX, 1993; p 253.
-
(1993)
Proceedings of FOCAPO II
, pp. 253
-
-
Pantelides, C.C.1
-
13
-
-
0025492187
-
An exact parallel algorithm for when production costs depend on consecutive states
-
Pekny, J. F.; Miller, D. L.; McRae, G. J. An exact parallel algorithm for when production costs depend on consecutive states. Comput. Chem. Eng. 1990, 14 (9), 1009.
-
(1990)
Comput. Chem. Eng.
, vol.14
, Issue.9
, pp. 1009
-
-
Pekny, J.F.1
Miller, D.L.2
McRae, G.J.3
-
14
-
-
0028500039
-
Optimal cyclic scheduling of multistage continuous multiproduct plants
-
Pinto, J. M.; Grossmann, I. E. Optimal cyclic scheduling of multistage continuous multiproduct plants. Comput. Chem. Eng. 1994, 18 (9), 797.
-
(1994)
Comput. Chem. Eng.
, vol.18
, Issue.9
, pp. 797
-
-
Pinto, J.M.1
Grossmann, I.E.2
-
15
-
-
0026108226
-
MINLP model for cyclic multiproduct scheduling on continuous parallel lines
-
Sahinidis, N. V.; Grossmann, I. E. MINLP model for cyclic multiproduct scheduling on continuous parallel lines. Comput. Chem. Eng. 1991a, 15 (2), 85.
-
(1991)
Comput. Chem. Eng.
, vol.15
, Issue.2
, pp. 85
-
-
Sahinidis, N.V.1
Grossmann, I.E.2
-
16
-
-
0026143149
-
Reformulation of multiperiod MILP models for planning and scheduling of chemical processes
-
Sahinidis, N. V.; Grossmann, I. E. Reformulation of multiperiod MILP models for planning and scheduling of chemical processes. Comput. Chem. Eng. 1991b, 15 (4), 255.
-
(1991)
Comput. Chem. Eng.
, vol.15
, Issue.4
, pp. 255
-
-
Sahinidis, N.V.1
Grossmann, I.E.2
-
17
-
-
0026174356
-
Multiperiod investment model for processing networks with dedicated and flexible plants
-
Sahinidis, N. V.; Grossmann, I. E. Multiperiod investment model for processing networks with dedicated and flexible plants. Ind. Eng. Chem. Res. 1991c, 30, 1165.
-
(1991)
Ind. Eng. Chem. Res.
, vol.30
, pp. 1165
-
-
Sahinidis, N.V.1
Grossmann, I.E.2
-
18
-
-
0029394712
-
Scheduling of multiple products on parallel units with tardiness penalties using simulated annealing
-
Tandon, M.; Cummings, P. T.; LeVan, M. D. Scheduling of multiple products on parallel units with tardiness penalties using simulated annealing. Comput. Chem. Eng. 1995, 19 (10), 1069.
-
(1995)
Comput. Chem. Eng.
, vol.19
, Issue.10
, pp. 1069
-
-
Tandon, M.1
Cummings, P.T.2
LeVan, M.D.3
-
19
-
-
0028546642
-
Practical considerations in using model-based optimization for the scheduling and planning of batch/semicontinuous processes
-
Zentner, M. G.; Pekny, J. F.; Reklaitis, G. V.; Gupta, J. Practical considerations in using model-based optimization for the scheduling and planning of batch/semicontinuous processes. J. Process Control 1994, 4 (4), 259.
-
(1994)
J. Process Control
, vol.4
, Issue.4
, pp. 259
-
-
Zentner, M.G.1
Pekny, J.F.2
Reklaitis, G.V.3
Gupta, J.4
|