Volumn 59, Issue 3, 2010, Pages 436-447

An effective heuristic for flexible job-shop scheduling problem with maintenance activities

Author keywords

Availability constraints; Filtered beam search; Flexible job shop scheduling problem; Preventive maintenance

Indexed keywords

AVAILABILITY CONSTRAINTS; BEAM SEARCH; FLEXIBLE JOB-SHOP SCHEDULING PROBLEM; MACHINE AVAILABILITY; MAINTENANCE ACTIVITY; PLANNING PERIOD; PRODUCTION SCHEDULING PROBLEMS; RESOURCE CONSTRAINT; SIMULATION EXPERIMENTS; TIME WINDOWS;

EID: 77955473840     PISSN: 03608352     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.cie.2010.05.016     Document Type: Article
Times cited : (109)

References (41)
  • 1
    • 0242658501 scopus 로고    scopus 로고
    • Minimizing the makespan for the flow shop scheduling problem with availability constraints
    • R. Aggoune Minimizing the makespan for the flow shop scheduling problem with availability constraints European Journal of Operational Research 153 3 2004 534 543
    • (2004) European Journal of Operational Research , vol.153 , Issue.3 , pp. 534-543
    • Aggoune, R.1
  • 2
    • 10444260511 scopus 로고    scopus 로고
    • Simulation and optimization to schedule a hybrid flow shop with maintenance constraints
    • H. Allaoui, and A. Artiba simulation and optimization to schedule a hybrid flow shop with maintenance constraints Computers & Industrial Engineering 47 4 2004 431 450
    • (2004) Computers & Industrial Engineering , vol.47 , Issue.4 , pp. 431-450
    • Allaoui, H.1    Artiba, A.2
  • 3
    • 34250084648 scopus 로고
    • Routing and scheduling in a flexible job shop by tabu search
    • P. Brandimarte Routing and scheduling in a flexible job shop by tabu search Annals of Operations Research 41 1-4 1993 157 183
    • (1993) Annals of Operations Research , vol.41 , Issue.14 , pp. 157-183
    • Brandimarte, P.1
  • 4
    • 29144477260 scopus 로고    scopus 로고
    • A polynomial-time approximation scheme for the two-machine flow shop scheduling problem with an availability constraint
    • J. Breit A polynomial-time approximation scheme for the two-machine flow shop scheduling problem with an availability constraint Computers & Operations Research 33 8 2006 2143 2153
    • (2006) Computers & Operations Research , vol.33 , Issue.8 , pp. 2143-2153
    • Breit, J.1
  • 5
    • 0038813446 scopus 로고    scopus 로고
    • Minimizing job tardiness using integrated preventive maintenance planning and production scheduling
    • C.R. Cassady, and E. Kutanoglu Minimizing job tardiness using integrated preventive maintenance planning and production scheduling IIE Transactions 35 6 2003 503 513
    • (2003) IIE Transactions , vol.35 , Issue.6 , pp. 503-513
    • Cassady, C.R.1    Kutanoglu, E.2
  • 6
    • 22444439337 scopus 로고    scopus 로고
    • Integrating preventive maintenance planning and production scheduling for a single machine
    • C.R. Cassady, and E. Kutanoglu Integrating preventive maintenance planning and production scheduling for a single machine IEEE Transactions on Reliability 54 2 2005 304 309
    • (2005) IEEE Transactions on Reliability , vol.54 , Issue.2 , pp. 304-309
    • Cassady, C.R.1    Kutanoglu, E.2
  • 8
    • 41149166270 scopus 로고    scopus 로고
    • Scheduling of nonresumable jobs and flexible maintenance activities on a single machine to minimize makespan
    • J.S. Chen Scheduling of nonresumable jobs and flexible maintenance activities on a single machine to minimize makespan European Journal of Operational Research 190 1 2008 90 102
    • (2008) European Journal of Operational Research , vol.190 , Issue.1 , pp. 90-102
    • Chen, J.S.1
  • 9
    • 50349092766 scopus 로고    scopus 로고
    • Minimizing number of tardy jobs on a single machine subject to periodic maintenance
    • W.J. Chen Minimizing number of tardy jobs on a single machine subject to periodic maintenance Omega 37 3 2009 591 599
    • (2009) Omega , vol.37 , Issue.3 , pp. 591-599
    • Chen, W.J.1
  • 10
    • 17744392411 scopus 로고    scopus 로고
    • Scheduling with different maintenance policies in a textile company
    • W.J. Chen, and C.J. Liao Scheduling with different maintenance policies in a textile company Journal of Quality in Maintenance Engineering 11 1 2005 43 52
    • (2005) Journal of Quality in Maintenance Engineering , vol.11 , Issue.1 , pp. 43-52
    • Chen, W.J.1    Liao, C.J.2
  • 11
    • 33747682830 scopus 로고    scopus 로고
    • Scheduling jobs and maintenances in flexible job shop with a hybrid genetic algorithm
    • J. Gao, M. Gen, and L. Sun Scheduling jobs and maintenances in flexible job shop with a hybrid genetic algorithm Journal of Intelligent Manufacturing 17 4 2006 493 507
    • (2006) Journal of Intelligent Manufacturing , vol.17 , Issue.4 , pp. 493-507
    • Gao, J.1    Gen, M.2    Sun, L.3
  • 12
    • 38749142590 scopus 로고    scopus 로고
    • A hybrid genetic and variable neighborhood descent algorithm for flexible job shop scheduling problems
    • J. Gao, L.Y. Sun, and M. Gen A hybrid genetic and variable neighborhood descent algorithm for flexible job shop scheduling problems Computers & Operations Research 35 9 2008 2892 2907
    • (2008) Computers & Operations Research , vol.35 , Issue.9 , pp. 2892-2907
    • Gao, J.1    Sun, L.Y.2    Gen, M.3
  • 13
    • 15344340708 scopus 로고    scopus 로고
    • Optimal parallel machines scheduling with availability constraints
    • A. Gharbi, and M. Haouari Optimal parallel machines scheduling with availability constraints Discrete Applied Mathematics 148 1 2005 63 87
    • (2005) Discrete Applied Mathematics , vol.148 , Issue.1 , pp. 63-87
    • Gharbi, A.1    Haouari, M.2
  • 14
    • 0032671338 scopus 로고    scopus 로고
    • Scheduling maintenance and semiresumable jobs on a single machine
    • G.H. Graves, and C.Y. Lee Scheduling maintenance and semiresumable jobs on a single machine Naval Research Logistics 46 7 1999 845 863
    • (1999) Naval Research Logistics , vol.46 , Issue.7 , pp. 845-863
    • Graves, G.H.1    Lee, C.Y.2
  • 15
    • 33749681702 scopus 로고    scopus 로고
    • Single-machine scheduling with periodic maintenance to minimize makespan
    • M. Ji, Y. He, and T.C.E. Cheng Single-machine scheduling with periodic maintenance to minimize makespan Computers & Operations Research 34 6 2007 1764 1770
    • (2007) Computers & Operations Research , vol.34 , Issue.6 , pp. 1764-1770
    • Ji, M.1    He, Y.2    Cheng, T.C.E.3
  • 16
    • 0036464279 scopus 로고    scopus 로고
    • Approach by localization and multiobjective evolutionary optimization for flexible job-shop scheduling problems
    • I. Kacem, S. Hammadi, and P. Borne Approach by localization and multiobjective evolutionary optimization for flexible job-shop scheduling problems IEEE Transactions on Systems, Man, and Cybernetics, Part C 32 1 2002 1 13
    • (2002) IEEE Transactions on Systems, Man, and Cybernetics, Part C , vol.32 , Issue.1 , pp. 1-13
    • Kacem, I.1    Hammadi, S.2    Borne, P.3
  • 18
    • 33749503018 scopus 로고    scopus 로고
    • Planning machine maintenance in two-machine shop scheduling
    • M.A. Kubzin, and V.A. Strusevich Planning machine maintenance in two-machine shop scheduling Operations Research 54 4 2006 789 800
    • (2006) Operations Research , vol.54 , Issue.4 , pp. 789-800
    • Kubzin, M.A.1    Strusevich, V.A.2
  • 19
    • 0034159705 scopus 로고    scopus 로고
    • Scheduling jobs and maintenance activities on parallel machines
    • C.Y. Lee, and Z.L. Chen Scheduling jobs and maintenance activities on parallel machines Naval Research Logistics 47 2 2000 145 165
    • (2000) Naval Research Logistics , vol.47 , Issue.2 , pp. 145-165
    • Lee, C.Y.1    Chen, Z.L.2
  • 20
    • 35448929087 scopus 로고    scopus 로고
    • Parallel-machine scheduling under potential disruption
    • C.Y. Lee, and G. Yu Parallel-machine scheduling under potential disruption Optimization Letters 2 1 2008 27 37
    • (2008) Optimization Letters , vol.2 , Issue.1 , pp. 27-37
    • Lee, C.Y.1    Yu, G.2
  • 21
    • 4344570389 scopus 로고    scopus 로고
    • Makespan minimization for two parallel machines with an availability constraint
    • C.J. Liao, D.L. Shyur, and C.H. Lin Makespan minimization for two parallel machines with an availability constraint European Journal of Operational Research 160 2 2005 445 456
    • (2005) European Journal of Operational Research , vol.160 , Issue.2 , pp. 445-456
    • Liao, C.J.1    Shyur, D.L.2    Lin, C.H.3
  • 22
    • 34548502246 scopus 로고    scopus 로고
    • Parallel machine scheduling with machine availability and eligibility constraints
    • L.W. Liao, and G.J. Sheen Parallel machine scheduling with machine availability and eligibility constraints European Journal of Operational Research 184 2 2008 458 467
    • (2008) European Journal of Operational Research , vol.184 , Issue.2 , pp. 458-467
    • Liao, L.W.1    Sheen, G.J.2
  • 23
    • 34547326656 scopus 로고    scopus 로고
    • Makespan minimization for two parallel machines with an unavailable period on each machine
    • C.H. Lin, and C.J. Liao Makespan minimization for two parallel machines with an unavailable period on each machine International Journal of Advanced Manufacturing Technology 33 9-10 2007 1024 1030
    • (2007) International Journal of Advanced Manufacturing Technology , vol.33 , Issue.910 , pp. 1024-1030
    • Lin, C.H.1    Liao, C.J.2
  • 24
    • 76349087153 scopus 로고    scopus 로고
    • A survey of scheduling with deterministic machine availability constraints
    • Y. Ma, C.B. Chu, and C.R. Zuo A survey of scheduling with deterministic machine availability constraints Computer & Industrial Engineering 58 2 2010 199 211
    • (2010) Computer & Industrial Engineering , vol.58 , Issue.2 , pp. 199-211
    • Ma, Y.1    Chu, C.B.2    Zuo, C.R.3
  • 25
    • 24144436089 scopus 로고    scopus 로고
    • New single machine and job-shop scheduling problems with availability constraints
    • P.H. Mauguiere, J.C. Billaut, and J.L. Bouquard New single machine and job-shop scheduling problems with availability constraints Journal of Scheduling 8 3 2005 211 231
    • (2005) Journal of Scheduling , vol.8 , Issue.3 , pp. 211-231
    • Mauguiere, P.H.1    Billaut, J.C.2    Bouquard, J.L.3
  • 26
    • 61849184894 scopus 로고    scopus 로고
    • Identical parallel-machine scheduling under availability constraints to minimize the sum of completion times
    • R. Mellouli, C. Sadfi, C.B. Chu, and I. Kacem Identical parallel-machine scheduling under availability constraints to minimize the sum of completion times European Journal of Operational Research 197 3 2009 1150 1165
    • (2009) European Journal of Operational Research , vol.197 , Issue.3 , pp. 1150-1165
    • Mellouli, R.1    Sadfi, C.2    Chu, C.B.3    Kacem, I.4
  • 27
    • 33750358079 scopus 로고    scopus 로고
    • Deterministic and stochastic approach for safety and reliability optimization of captive power plant maintenance scheduling using GA/SA-based hybrid techniques: A comparison of results
    • D.K. Mohanta, P.K. Sadhu, and R. Chakrabarti Deterministic and stochastic approach for safety and reliability optimization of captive power plant maintenance scheduling using GA/SA-based hybrid techniques: A comparison of results Reliability Engineering and System Safety 92 2 2007 187 199
    • (2007) Reliability Engineering and System Safety , vol.92 , Issue.2 , pp. 187-199
    • Mohanta, D.K.1    Sadhu, P.K.2    Chakrabarti, R.3
  • 31
    • 40249118429 scopus 로고    scopus 로고
    • A genetic algorithm for the flexible job-shop scheduling problem
    • F. Pezzella, G. Morganti, and G. Ciaschetti A genetic algorithm for the flexible job-shop scheduling problem Computers & Operations Research 35 10 2008 3202 3212
    • (2008) Computers & Operations Research , vol.35 , Issue.10 , pp. 3202-3212
    • Pezzella, F.1    Morganti, G.2    Ciaschetti, G.3
  • 32
    • 34047122539 scopus 로고    scopus 로고
    • Considering scheduling and preventive maintenance in the flowshop sequencing problem
    • R. Ruiz, J.C. Garcia-Diaz, and C. Maroto Considering scheduling and preventive maintenance in the flowshop sequencing problem Computers & Operations Research 34 11 2007 3314 3330
    • (2007) Computers & Operations Research , vol.34 , Issue.11 , pp. 3314-3330
    • Ruiz, R.1    Garcia-Diaz, J.C.2    Maroto, C.3
  • 34
  • 35
    • 13444291361 scopus 로고    scopus 로고
    • Genetic algorithms for integrated preventive maintenance planning and production scheduling for a single machine
    • N. Sortrakul, H.L. Nachtmann, and C.R. Cassady Genetic algorithms for integrated preventive maintenance planning and production scheduling for a single machine Computers in Industry 56 2 2005 161 168
    • (2005) Computers in Industry , vol.56 , Issue.2 , pp. 161-168
    • Sortrakul, N.1    Nachtmann, H.L.2    Cassady, C.R.3
  • 36
    • 14044249418 scopus 로고    scopus 로고
    • Filtered and recovering beam search algorithms for the early/tardy scheduling problem with no idle time
    • J.M.S. Valente, and R.A.F.S. Alves Filtered and recovering beam search algorithms for the early/tardy scheduling problem with no idle time Computers & Industrial Engineering 48 2 2005 363 375
    • (2005) Computers & Industrial Engineering , vol.48 , Issue.2 , pp. 363-375
    • Valente, J.M.S.1    Alves, R.A.F.S.2
  • 37
    • 0037118559 scopus 로고    scopus 로고
    • A survey of maintenance policies of deteriorating systems
    • H.Z. Wang A survey of maintenance policies of deteriorating systems European Journal of Operational Research 139 2002 469 489
    • (2002) European Journal of Operational Research , vol.139 , pp. 469-489
    • Wang, H.Z.1
  • 38
    • 41849142977 scopus 로고    scopus 로고
    • A filtered-beam-search-based algorithm for flexible job-shop scheduling problem
    • S.J. Wang, B.H. Zhou, and L.F. Xi A filtered-beam-search-based algorithm for flexible job-shop scheduling problem International Journal of Production Research 46 11 2008 3027 3058
    • (2008) International Journal of Production Research , vol.46 , Issue.11 , pp. 3027-3058
    • Wang, S.J.1    Zhou, B.H.2    Xi, L.F.3
  • 39
    • 14044268702 scopus 로고    scopus 로고
    • An effective hybrid optimization approach for multi-objective flexible job-shop scheduling problems
    • W.J. Xia, and Z.M. Wu An effective hybrid optimization approach for multi-objective flexible job-shop scheduling problems Computers & Industrial Engineering 48 2 2005 409 425
    • (2005) Computers & Industrial Engineering , vol.48 , Issue.2 , pp. 409-425
    • Xia, W.J.1    Wu, Z.M.2
  • 40
    • 34548454869 scopus 로고    scopus 로고
    • A two-machine flowshop scheduling problem with a separated maintenance constraint
    • D.L. Yang, C.J. Hsu, and W.H. Kuo A two-machine flowshop scheduling problem with a separated maintenance constraint Computers & Operations Research 35 3 2008 867 883
    • (2008) Computers & Operations Research , vol.35 , Issue.3 , pp. 867-883
    • Yang, D.L.1    Hsu, C.J.2    Kuo, W.H.3
  • 41
    • 38749084131 scopus 로고    scopus 로고
    • Minimizing the makespan for the MPM job-shop with availability constraints
    • N. Zribi, A.E. Kamel, and P. Borne Minimizing the makespan for the MPM job-shop with availability constraints International Journal of Production Economics 112 1 2008 151 160
    • (2008) International Journal of Production Economics , vol.112 , Issue.1 , pp. 151-160
    • Zribi, N.1    Kamel, A.E.2    Borne, P.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.