메뉴 건너뛰기




Volumn , Issue , 2008, Pages 279-285

Modeling and analysis of real-life job shop scheduling problems by petri nets

Author keywords

[No Author keywords available]

Indexed keywords

CHLORINE COMPOUNDS; GRAPH THEORY; MARINE BIOLOGY; PETRI NETS;

EID: 50149094327     PISSN: 1080241X     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/ANSS-41.2008.15     Document Type: Conference Paper
Times cited : (4)

References (10)
  • 1
    • 34548607440 scopus 로고    scopus 로고
    • Cpn tools: http://wiki.daimi.au.dk/cpntools/cpntools.wiki.
    • Cpn tools
  • 3
    • 0035546217 scopus 로고    scopus 로고
    • A petri net model and a general method for on and off-line multi-resource shop floor scheduling with setup times
    • A. Christian and R. Francois. A petri net model and a general method for on and off-line multi-resource shop floor scheduling with setup times. International Journal of Production Economics, 74(1-3):63, 2001.
    • (2001) International Journal of Production Economics , vol.74 , Issue.1-3 , pp. 63
    • Christian, A.1    Francois, R.2
  • 4
    • 0024719992 scopus 로고
    • Using timed petri nets for the scheduling of job-shop systems
    • H. P. Hillion and J.-M. Proth. Using timed petri nets for the scheduling of job-shop systems. Engineering Costs and Production Economics, 17(1-4): 149-154, 1989.
    • (1989) Engineering Costs and Production Economics , vol.17 , Issue.1-4 , pp. 149-154
    • Hillion, H.P.1    Proth, J.-M.2
  • 5
    • 33846121916 scopus 로고    scopus 로고
    • FMS scheduling based on timed petri net model and reactive graph search
    • Y. W. Kim, T. Suzuki, and T. Narikiyo. FMS scheduling based on timed petri net model and reactive graph search. Applied Mathematical Modelling, 31(6):955-970, 2007.
    • (2007) Applied Mathematical Modelling , vol.31 , Issue.6 , pp. 955-970
    • Kim, Y.W.1    Suzuki, T.2    Narikiyo, T.3
  • 6
    • 74849101820 scopus 로고    scopus 로고
    • J. K. L. R. L. Graham, Lawler and A. H. G. R. Kan. Optimization and approximation in deterministic sequencing and scheduling: a survey. Annals of Discrete Mathematics, 5:287-326, 1979.
    • J. K. L. R. L. Graham, Lawler and A. H. G. R. Kan. Optimization and approximation in deterministic sequencing and scheduling: a survey. Annals of Discrete Mathematics, 5:287-326, 1979.
  • 9
    • 0032044735 scopus 로고    scopus 로고
    • Modeling with colored timed object-oriented petri nets for automated manufacturing systems
    • L.-C. Wang and S.-Y. Wu. Modeling with colored timed object-oriented petri nets for automated manufacturing systems. Computers and Industrial Engineering, 34(2):463-480, 1998.
    • (1998) Computers and Industrial Engineering , vol.34 , Issue.2 , pp. 463-480
    • Wang, L.-C.1    Wu, S.-Y.2
  • 10
    • 23144456427 scopus 로고    scopus 로고
    • Dynamic scheduling in flexible assembly system based on timed petri nets model
    • W. Zhang, T. Freiheit, and H. Yang. Dynamic scheduling in flexible assembly system based on timed petri nets model. Robotics and Computer-Integrated Manufacturing, 21(6):550-558, 2005.
    • (2005) Robotics and Computer-Integrated Manufacturing , vol.21 , Issue.6 , pp. 550-558
    • Zhang, W.1    Freiheit, T.2    Yang, H.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.