메뉴 건너뛰기




Volumn 57, Issue 3, 2009, Pages 822-831

Modelling and performance maximization of an integrated automated guided vehicle system using coloured Petri net and response surface methods

Author keywords

Automated guided vehicle system; Coloured Petri net; Flexible manufacturing system; Guide path configurations; Multiple response optimization; Response surface method

Indexed keywords

AUTOMATED GUIDED VEHICLE SYSTEM; COLOURED PETRI NET; GUIDE-PATH CONFIGURATIONS; MULTIPLE RESPONSE OPTIMIZATION; RESPONSE SURFACE METHOD;

EID: 69649092723     PISSN: 03608352     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.cie.2009.02.009     Document Type: Article
Times cited : (57)

References (29)
  • 2
    • 69649102003 scopus 로고    scopus 로고
    • Modelling and analysis of an integrated automated guided vehicle system using coloured Petri net
    • Aized T., Takahashi K., and Hagiwara I. Modelling and analysis of an integrated automated guided vehicle system using coloured Petri net. World Congress on Engineering (2007) 1038-1043
    • (2007) World Congress on Engineering , pp. 1038-1043
    • Aized, T.1    Takahashi, K.2    Hagiwara, I.3
  • 5
    • 0029404820 scopus 로고
    • A time window approach to simultaneous scheduling of machines and material handling system in an FMS
    • Bilge U., and Ulusoy G. A time window approach to simultaneous scheduling of machines and material handling system in an FMS. Operations Research 43/6 (1995) 1058-1070
    • (1995) Operations Research , Issue.43-6 , pp. 1058-1070
    • Bilge, U.1    Ulusoy, G.2
  • 6
    • 0000432952 scopus 로고
    • Simultaneous optimization of several response variables
    • Derringer G., and Suich R. Simultaneous optimization of several response variables. Journal of Quality Technology 12 (1980) 214-219
    • (1980) Journal of Quality Technology , vol.12 , pp. 214-219
    • Derringer, G.1    Suich, R.2
  • 8
    • 0035895120 scopus 로고    scopus 로고
    • Analysis of automated guided vehicle configurations in flexible manufacturing systems
    • Farling B.E., Mosier C.T., and Mahmood F. Analysis of automated guided vehicle configurations in flexible manufacturing systems. International Journal of Production Research 39 18 (2001) 4239-4260
    • (2001) International Journal of Production Research , vol.39 , Issue.18 , pp. 4239-4260
    • Farling, B.E.1    Mosier, C.T.2    Mahmood, F.3
  • 13
    • 0039140289 scopus 로고
    • On an automated two-machine flow shop scheduling problem with infinite buffer
    • Kise H. On an automated two-machine flow shop scheduling problem with infinite buffer. Journal of the Operations Research Society of Japan 1991 (1991) 34,354-361
    • (1991) Journal of the Operations Research Society of Japan , vol.1991
    • Kise, H.1
  • 14
    • 0242333159 scopus 로고    scopus 로고
    • Unidirectional AGV guide path network design: A heuristic algorithm
    • Ko K.C., and Egbelu P.J. Unidirectional AGV guide path network design: A heuristic algorithm. International Journal of Production Research 41 10 (2003) 2325-2343
    • (2003) International Journal of Production Research , vol.41 , Issue.10 , pp. 2325-2343
    • Ko, K.C.1    Egbelu, P.J.2
  • 16
    • 0028698360 scopus 로고
    • Integrated scheduling of flexible manufacturing systems employing automated guided vehicles
    • Lee D.Y., and DiCesare F. Integrated scheduling of flexible manufacturing systems employing automated guided vehicles. IEEE Transactions on Industrial Electronics 41/6 (1994) 602-610
    • (1994) IEEE Transactions on Industrial Electronics , Issue.41-6 , pp. 602-610
    • Lee, D.Y.1    DiCesare, F.2
  • 17
    • 0344427189 scopus 로고    scopus 로고
    • Machine scheduling with transportation considerations
    • Lee C.Y., and Chen Z.L. Machine scheduling with transportation considerations. Journal of Scheduling 4 (2001) 3-24
    • (2001) Journal of Scheduling , vol.4 , pp. 3-24
    • Lee, C.Y.1    Chen, Z.L.2
  • 18
    • 0041763613 scopus 로고
    • On 2 × n sequencing problem with transportation times of jobs
    • Maggu P.L., and Das G. On 2 × n sequencing problem with transportation times of jobs. Pure and Applied Mathematika Sciences 12 (1980) 1-6
    • (1980) Pure and Applied Mathematika Sciences , vol.12 , pp. 1-6
    • Maggu, P.L.1    Das, G.2
  • 19
    • 0041587599 scopus 로고
    • On equivalent job-for-job block in 2 × n sequencing problem with transportation times
    • Maggu P.L., Das G., and Kumar R. On equivalent job-for-job block in 2 × n sequencing problem with transportation times. Journal of the OR society of Japan 24 (1981) 36-146
    • (1981) Journal of the OR society of Japan , vol.24 , pp. 36-146
    • Maggu, P.L.1    Das, G.2    Kumar, R.3
  • 20
    • 0026188481 scopus 로고
    • Scheduling of two-machine flow shop with travel times to minimize maximum lateness
    • Panwalker S.S. Scheduling of two-machine flow shop with travel times to minimize maximum lateness. International Journal of Operational Research Society 42 (1991) 609-613
    • (1991) International Journal of Operational Research Society , vol.42 , pp. 609-613
    • Panwalker, S.S.1
  • 21
    • 0032123167 scopus 로고    scopus 로고
    • An heuristic for configuring a mixed uni/bidirectional flow path for an AGV system
    • Rajotia S., Shankar K., and Batra J.L. An heuristic for configuring a mixed uni/bidirectional flow path for an AGV system. International Journal of Production Research 36 7 (1998) 1779-1799
    • (1998) International Journal of Production Research , vol.36 , Issue.7 , pp. 1779-1799
    • Rajotia, S.1    Shankar, K.2    Batra, J.L.3
  • 22
    • 0036923791 scopus 로고    scopus 로고
    • A statistical process control approach for estimating the warm-up period
    • Robinson, S. (2002). A statistical process control approach for estimating the warm-up period. In Proc. winter simulation conference (pp. 439-445).
    • (2002) Proc. winter simulation conference , pp. 439-445
    • Robinson, S.1
  • 23
    • 0026898533 scopus 로고
    • Experimental investigation of FMS machine and AGV scheduling rules against the mean flow time criterion
    • Sabuncuoglu I., and Hommertzheim D. Experimental investigation of FMS machine and AGV scheduling rules against the mean flow time criterion. International Journal of Production Research 30/7 (1992) 1617-1635
    • (1992) International Journal of Production Research , Issue.30-7 , pp. 1617-1635
    • Sabuncuoglu, I.1    Hommertzheim, D.2
  • 24
    • 0026866144 scopus 로고
    • Dynamic dispatching algorithm for scheduling machines and automated guided vehicles in a flexible manufacturing system
    • Sabuncuoglu I., and Hommertzheim D. Dynamic dispatching algorithm for scheduling machines and automated guided vehicles in a flexible manufacturing system. International Journal of Production Research 30/5 (1992) 1059-1079
    • (1992) International Journal of Production Research , Issue.30-5 , pp. 1059-1079
    • Sabuncuoglu, I.1    Hommertzheim, D.2
  • 26
    • 84974857090 scopus 로고
    • Scheduling parts in a combined production-transportation work cell
    • Stern H.I., and Vitner G. Scheduling parts in a combined production-transportation work cell. Journal of the Operational Research Society 41 (1990) 625-632
    • (1990) Journal of the Operational Research Society , vol.41 , pp. 625-632
    • Stern, H.I.1    Vitner, G.2
  • 28
  • 29
    • 27744600972 scopus 로고    scopus 로고
    • Survey of research in the design and control of automated guided vehicle systems
    • Vis I.F.A. Survey of research in the design and control of automated guided vehicle systems. European Journal of Operational Research 170 (2006) 677-709
    • (2006) European Journal of Operational Research , vol.170 , pp. 677-709
    • Vis, I.F.A.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.