The trouble with earned schedule
-
Abba W (2008) The trouble with earned schedule. The Measurable News Fall:29-30
-
(2008)
The Measurable News Fall
, pp. 29-30
-
-
Abba, W.1
-
2
-
-
0030121344
-
Dagen: A generator of testsets for project activity nets
-
Agrawal M, Elmaghraby S, Herroelen W (1996) DAGEN: a generator of testsets for project activity nets. Eur J Oper Res 90:376-382
-
(1996)
Eur J Oper Res
, vol.90
, pp. 376-382
-
-
Agrawal, M.1
Elmaghraby, S.2
Herroelen, W.3
-
3
-
-
13444270579
-
Network decomposition-based benchmark results for the discrete time-cost tradeoff problem
-
Akkan C, Drexl A, Kimms A (2005) Network decomposition-based benchmark results for the discrete time-cost tradeoff problem. Eur J Oper Res 165:339-358
-
(2005)
Eur J Oper Res
, vol.165
, pp. 339-358
-
-
Akkan, C.1
Drexl, A.2
Kimms, A.3
-
5
-
-
2142812265
-
An efficient approximation procedure for project composite learning curves
-
Amsterdam Amor J, Teplitz C (1998) An efficient approximation procedure for project composite learning curves. Proj Manag J 29:28-42
-
(1998)
Proj Manag J
, vol.29
, pp. 28-42
-
-
Amsterdam Amor, J.1
Teplitz, C.2
-
6
-
-
8644266554
-
Scheduling programs with repetitive projects using composite learning curve approximations
-
Amor J (2002) Scheduling programs with repetitive projects using composite learning curve approximations. Proj Manage J 33:16-29
-
(2002)
Proj Manage J
, vol.33
, pp. 16-29
-
-
Amor, J.1
-
7
-
-
0040651491
-
Improving cpm’s accuracy using learning curves
-
Amor J, Teplitz C (1993) Improving CPM’s accuracy using learning curves. Proj Manage J 24:1519
-
(1993)
Proj Manage J
, vol.24
, pp. 1519
-
-
Amor, J.1
Teplitz, C.2
-
8
-
-
33645957411
-
Earned value project management method and extensions
-
Anbari F (2003) Earned value project management method and extensions. Proj Manag J 34(4): 12-23
-
(2003)
Proj Manag J
, vol.34
, Issue.4
, pp. 12-23
-
-
Anbari, F.1
-
10
-
-
0041033427
-
The effects of learning, forgetting, and relearning on decision rule performance in multiproject scheduling
-
Ash R, Smith-Daniels DE (1999) The effects of learning, forgetting, and relearning on decision rule performance in multiproject scheduling. Decis Sci 30:47-82
-
(1999)
Decis Sci
, vol.30
, pp. 47-82
-
-
Ash, R.1
Smith-Daniels, D.E.2
-
11
-
-
8644228338
-
Incorporating learning curve effects into critical resource diagramming
-
Badiru A (1995) Incorporating learning curve effects into critical resource diagramming. Proj Manage J 2:38-45
-
(1995)
Proj Manage J
, vol.2
, pp. 38-45
-
-
Badiru, A.1
-
12
-
-
34250094949
-
Scheduling project networks with resource constraints and time windows
-
Bartusch M, Mohring R, Radermacher F (1988) Scheduling project networks with resource constraints and time windows. Ann Oper Res 16(1):199-240
-
(1988)
Ann Oper Res
, vol.16
, Issue.1
, pp. 199-240
-
-
Bartusch, M.1
Mohring, R.2
Radermacher, F.3
-
13
-
-
0000728410
-
Optimal reduction of two-terminal directed acyclic graphs
-
Bein W, Kamburowski J, Stallmann M (1992) Optimal reduction of two-terminal directed acyclic graphs. SIAM J Comput 21:1112-1129
-
(1992)
SIAM J Comput
, vol.21
, pp. 1112-1129
-
-
Bein, W.1
Kamburowski, J.2
Stallmann, M.3
-
15
-
-
0019342681
-
Scheduling subject to resource constraints: Classification and complexity
-
Blazewicz J, Lenstra J, Rinnooy Kan A (1983) Scheduling subject to resource constraints: classification and complexity. Discret Appl Math 5:11-24
-
(1983)
Discret Appl Math
, vol.5
, pp. 11-24
-
-
Blazewicz, J.1
Lenstra, J.2
Rinnooy Kan, A.3
-
16
-
-
84855863702
-
Correction note: “earned schedule” and its possible unreliability as an indicator
-
Book S (2006a) Correction note: “earned schedule” and its possible unreliability as an indicator. The Measurable News Fall:22-24
-
(2006)
The Measurable News Fall
, pp. 22-24
-
-
Book, S.1
-
17
-
-
84855868818
-
Earned schedule
-
its possible unreliability as an indicator
-
Book S (2006b) “Earned schedule” and its possible unreliability as an indicator. The Measurable News Spring:24-30
-
(2006)
The Measurable News Spring:
, pp. 24-30
-
-
Book, S.1
-
18
-
-
0032736579
-
Resource-constrained project scheduling: Notation, classification, models, and methods
-
Brucker P, Drexl A, Mohring R, Neumann K, Pesch E (1999) Resource-constrained project scheduling: notation, classification, models, and methods. Eur J Oper Res 112:3-41
-
(1999)
Eur J Oper Res
, vol.112
, pp. 3-41
-
-
Brucker, P.1
Drexl, A.2
Mohring, R.3
Neumann, K.4
Pesch, E.5
-
19
-
-
0031257870
-
An uncertainty importance measure of activities in pert networks
-
Cho J, Yum B (1997) An uncertainty importance measure of activities in PERT networks. Int J Prod Res 35:2737-2758
-
(1997)
Int J Prod Res
, vol.35
, pp. 2737-2758
-
-
Cho, J.1
Yum, B.2
-
20
-
-
18544371010
-
The estimate at completion problem: A review of three studies
-
Christensen D (1993) The estimate at completion problem: a review of three studies. Proj Manag J 24:37-42
-
(1993)
Proj Manag J
, vol.24
, pp. 37-42
-
-
Christensen, D.1
-
21
-
-
0016972372
-
Heuristics for scheduling resource-constrained projects: An experimental investigation
-
Cooper D (1976) Heuristics for scheduling resource-constrained projects: an experimental investigation. Manag Sci 22:1186-1194
-
(1976)
Manag Sci
, vol.22
, pp. 1186-1194
-
-
Cooper, D.1
-
22
-
-
1642265781
-
Your project’s real price tag? Letters to the editor
-
Cooper K (2003) Your project’s real price tag? Letters to the editor. Harv Bus Rev 81:122-122
-
(2003)
Harv Bus Rev
, vol.81
, pp. 122
-
-
Cooper, K.1
-
23
-
-
0014928334
-
Network reduction and solution
-
Crowston W (1970) Network reduction and solution. Oper Res Q 21:435-450
-
(1970)
Oper Res Q
, vol.21
, pp. 435-450
-
-
Crowston, W.1
-
24
-
-
0001267414
-
Decision cpm: A method for simultaneous planning, scheduling and control of projects
-
Crowston W, Thompson G (1967) Decision CPM: a method for simultaneous planning, scheduling and control of projects. Oper Res 15:407-426
-
(1967)
Oper Res
, vol.15
, pp. 407-426
-
-
Crowston, W.1
Thompson, G.2
-
25
-
-
0015727839
-
Malb - a heuristic technique for balancing large single-model assembly lines
-
Dar-El E (1973) MALB - A heuristic technique for balancing large single-model assembly lines. IIE Trans 5:343-356
-
(1973)
IIE Trans
, vol.5
, pp. 343-356
-
-
Dar-El, E.1
-
26
-
-
0015715095
-
An experimental investigation of resource allocation in multiactivity projects
-
Davies E (1974) An experimental investigation of resource allocation in multiactivity projects. Oper Res Q 24:587-591
-
(1974)
Oper Res Q
, vol.24
, pp. 587-591
-
-
Davies, E.1
-
27
-
-
0016520377
-
Project network summary measures constrained-resource scheduling
-
Davis E (1975) Project network summary measures constrained-resource scheduling. AIIE Trans 7:132-142
-
(1975)
AIIE Trans
, vol.7
, pp. 132-142
-
-
Davis, E.1
-
28
-
-
0031236393
-
On modelling payments in projects
-
Dayanand N, Padman R (1997) On modelling payments in projects. J Oper Res Soc 48:906-918
-
(1997)
J Oper Res Soc
, vol.48
, pp. 906-918
-
-
Dayanand, N.1
Padman, R.2
-
29
-
-
0035708796
-
Project contracts and payment schedules: The client’s problem
-
Dayanand N, Padman R (2001a) Project contracts and payment schedules: the client’s problem. Manag Sci 47:1654-1667
-
(2001)
Manag Sci
, vol.47
, pp. 1654-1667
-
-
Dayanand, N.1
Padman, R.2
-
30
-
-
0035612932
-
A two stage search heuristic for scheduling payments in projects
-
Dayanand N, Padman R (2001b) A two stage search heuristic for scheduling payments in projects. Ann Oper Res 102:197-220
-
(2001)
Ann Oper Res
, vol.102
, pp. 197-220
-
-
Dayanand, N.1
Padman, R.2
-
32
-
-
0029632618
-
The discrete time-cost tradeoff problem revisited
-
De P, Dunne E, Ghosh J, Wells C (1995) The discrete time-cost tradeoff problem revisited. Eur J Oper Res 81:225-238
-
(1995)
Eur J Oper Res
, vol.81
, pp. 225-238
-
-
De, P.1
Dunne, E.2
Ghosh, J.3
Wells, C.4
-
33
-
-
0031102411
-
Complexity of the discrete time/cost trade-off problem for project networks
-
De P, Dunne E, Ghosh J, Wells C (1997) Complexity of the discrete time/cost trade-off problem for project networks. Oper Res 45:302-306
-
(1997)
Oper Res
, vol.45
, pp. 302-306
-
-
De, P.1
Dunne, E.2
Ghosh, J.3
Wells, C.4
-
34
-
-
1642528341
-
Would the real project management language please stand up?
-
Delisle C, Olson D (2004) Would the real project management language please stand up? Int J Proj Manag 22:327-337
-
(2004)
Int J Proj Manag
, vol.22
, pp. 327-337
-
-
Delisle, C.1
Olson, D.2
-
35
-
-
0000463458
-
Minimizing resource availability costs in time-limited project networks
-
Demeulemeester E (1995) Minimizing resource availability costs in time-limited project networks. Manag Sci 41:1590-1598
-
(1995)
Manag Sci
, vol.41
, pp. 1590-1598
-
-
Demeulemeester, E.1
-
36
-
-
0030122629
-
An efficient optimal solution for the preemptive resource-constrained project scheduling problem
-
Demeulemeester E, Herroelen W (1996) An efficient optimal solution for the preemptive resource-constrained project scheduling problem. Eur J Oper Res 90:334-348
-
(1996)
Eur J Oper Res
, vol.90
, pp. 334-348
-
-
Demeulemeester, E.1
Herroelen, W.2
-
39
-
-
0032205606
-
New computational results on the discrete time/cost trade-off problem in project networks
-
Demeulemeester E, De Reyck B, Foubert B, Herroelen W, Vanhoucke M (1998) New computational results on the discrete time/cost trade-off problem in project networks. J Oper Res Soc 49:1153-1163
-
(1998)
J Oper Res Soc
, vol.49
, pp. 1153-1163
-
-
Demeulemeester, E.1
De Reyck, B.2
Foubert, B.3
Herroelen, W.4
Vanhoucke, M.5
-
40
-
-
3543055794
-
Rangen: A random network generator for activity-on-the-node networks
-
Demeulemeester E, Vanhoucke M, Herroelen W (2003) Rangen: a random network generator for activity-on-the-node networks. J Sched 6:17-38
-
(2003)
J Sched
, vol.6
, pp. 17-38
-
-
Demeulemeester, E.1
Vanhoucke, M.2
Herroelen, W.3
-
42
-
-
0033722085
-
Progen/wx - an instance generator for resource-constrained project scheduling problems with partially renewable resources and further extensions
-
Drexl A, Nissen R, Patterson J, Salewski F (2000) ProGen/wx - an instance generator for resource-constrained project scheduling problems with partially renewable resources and further extensions. Eur J Oper Res 125:59-72
-
(2000)
Eur J Oper Res
, vol.125
, pp. 59-72
-
-
Drexl, A.1
Nissen, R.2
Patterson, J.3
Salewski, F.4
-
43
-
-
12444344998
-
Resource-driven scheduling of repetitive activities
-
El-Rayes K, Moselhi O (1998) Resource-driven scheduling of repetitive activities. Constr Manage Econ 16:433-446
-
(1998)
Constr Manage Econ
, vol.16
, pp. 433-446
-
-
El-Rayes, K.1
Moselhi, O.2
-
45
-
-
0029635345
-
Activity nets: A guided tour through some recent developments
-
Elmaghraby S (1995) Activity nets: a guided tour through some recent developments. Eur J Oper Res 82:383-408
-
(1995)
Eur J Oper Res
, vol.82
, pp. 383-408
-
-
Elmaghraby, S.1
-
46
-
-
0034559444
-
On criticality and sensitivity in activity networks
-
Elmaghraby S (2000) On criticality and sensitivity in activity networks. Eur J Oper Res 127: 220-238
-
(2000)
Eur J Oper Res
, vol.127
, pp. 220-238
-
-
Elmaghraby, S.1
-
47
-
-
0011717131
-
On the measurement of complexity in activity networks
-
Elmaghraby S, Herroelen W (1980) On the measurement of complexity in activity networks. Eur J Oper Res 5:223-234
-
(1980)
Eur J Oper Res
, vol.5
, pp. 223-234
-
-
Elmaghraby, S.1
Herroelen, W.2
-
48
-
-
0001215033
-
The analysis of activity networks under generalized precedence relations
-
Elmaghraby S, Kamburowsky R (1992) The analysis of activity networks under generalized precedence relations. Manag Sci 38:1245-1263
-
(1992)
Manag Sci
, vol.38
, pp. 1245-1263
-
-
Elmaghraby, S.1
Kamburowsky, R.2
-
49
-
-
0032646635
-
On the sensitivity of project variability to activity mean duration
-
Elmaghraby S, Fathi Y, Taner M (1999) On the sensitivity of project variability to activity mean duration. Int J Prod Econ 62:219-232
-
(1999)
Int J Prod Econ
, vol.62
, pp. 219-232
-
-
Elmaghraby, S.1
Fathi, Y.2
Taner, M.3
-
50
-
-
0032761234
-
Scheduling project activities to maximize the net present value - the case of linear time-dependent cash flows
-
Etgar R, Shtub A (1999) Scheduling project activities to maximize the net present value - the case of linear time-dependent cash flows. Int J Prod Res 37:329-339
-
(1999)
Int J Prod Res
, vol.37
, pp. 329-339
-
-
Etgar, R.1
Shtub, A.2
-
51
-
-
1642343821
-
What’s your project’s real price tag?
-
Fleming Q, Koppelman J (2003) What’s your project’s real price tag? Harv Bus Rev 81:20-21
-
(2003)
Harv Bus Rev
, vol.81
, pp. 20-21
-
-
Fleming, Q.1
Koppelman, J.2
-
53
-
-
0003732093
-
Sequencing and scheduling: An introduction to the mathematics of the job-shop
-
French S (1982) Sequencing and scheduling: an introduction to the mathematics of the Job-shop. Ellis Horwood/Wiley
-
(1982)
Ellis Horwood/Wiley
-
-
French, S.1
-
54
-
-
2042546673
-
-
Great Barrington Goldratt E, Cox J, The goal. North River Press, Croton-on-Hudson
-
Goldratt E (1997) Critical chain. North River Press, Great Barrington Goldratt E, Cox J (1984) The goal. North River Press, Croton-on-Hudson
-
(1997)
Critical Chain. North River Press
, pp. 1984
-
-
Goldratt, E.1
-
55
-
-
0031153881
-
Optimization of float use in risk analysis-based network scheduling
-
Gong D (1997) Optimization of float use in risk analysis-based network scheduling. Int J Proj Manag 15:187-192
-
(1997)
Int J Proj Manag
, vol.15
, pp. 187-192
-
-
Gong, D.1
-
56
-
-
84954607206
-
Maximizing net present value for generalized resource constrained project scheduling problem
-
Nomura Research Institute, Japan
-
Goto E, Joko T, Fujisawa K, Katoh N, Furusaka S (2000) Maximizing net present value for generalized resource constrained project scheduling problem. Working paper, Nomura Research Institute, Japan
-
(2000)
Working Paper
-
-
Goto, E.1
Joko, T.2
Fujisawa, K.3
Katoh, N.4
Furusaka, S.5
-
57
-
-
0034313858
-
Analysis of the effects of uncertainty, risk-pooling, and subcontracting mechanisms on project performance
-
Gutierrez G, Paul A (2000) Analysis of the effects of uncertainty, risk-pooling, and subcontracting mechanisms on project performance. Oper Res 48:927-938
-
(2000)
Oper Res
, vol.48
, pp. 927-938
-
-
Gutierrez, G.1
Paul, A.2
-
58
-
-
0000674566
-
Scheduling projects with repeating activities
-
Harris R, Ioannou P (1998) Scheduling projects with repeating activities. J Constr Eng Manag 124:269-278
-
(1998)
J Constr Eng Manag
, vol.124
, pp. 269-278
-
-
Harris, R.1
Ioannou, P.2
-
59
-
-
77953872383
-
A survey of variants and extensions of the resource-constrained project scheduling problem
-
Hartmann S, Briskorn D (2010) A survey of variants and extensions of the resource-constrained project scheduling problem. Eur J Oper Res 207:1-15
-
(2010)
Eur J Oper Res
, vol.207
, pp. 1-15
-
-
Hartmann, S.1
Briskorn, D.2
-
60
-
-
77349123567
-
Scheduling and staffing multiple projects with a multi-skilled workforce
-
Heimerl C, Kolisch R (2010) Scheduling and staffing multiple projects with a multi-skilled workforce. OR Spectr 32:343-368
-
(2010)
OR Spectr
, vol.32
, pp. 343-368
-
-
Heimerl, C.1
Kolisch, R.2
-
61
-
-
0033077946
-
Phase transitions in project scheduling
-
Herroelen W, De Reyck B (1999) Phase transitions in project scheduling. J Oper Res Soc 50: 148-156
-
(1999)
J Oper Res Soc
, vol.50
, pp. 148-156
-
-
Herroelen, W.1
De Reyck, B.2
-
62
-
-
0035480172
-
On the merits and pitfalls of critical chain scheduling
-
Herroelen W, Leus R (2001) On the merits and pitfalls of critical chain scheduling. J Oper Manag 19:559-577
-
(2001)
J Oper Manag
, vol.19
, pp. 559-577
-
-
Herroelen, W.1
Leus, R.2
-
63
-
-
0031190476
-
Project network models with discounted cash flows a guided tour through recent developments
-
Herroelen W, Van Dommelen P, Demeulemeester E (1997) Project network models with discounted cash flows a guided tour through recent developments. Eur J Oper Res 100:97-121
-
(1997)
Eur J Oper Res
, vol.100
, pp. 97-121
-
-
Herroelen, W.1
Van Dommelen, P.2
Demeulemeester, E.3
-
64
-
-
0032042933
-
Resource-constrained project scheduling: A survey of recent developments
-
Herroelen W, De Reyck B, Demeulemeester E (1998) Resource-constrained project scheduling: a survey of recent developments. Comput Oper Res 25:279-302
-
(1998)
Comput Oper Res
, vol.25
, pp. 279-302
-
-
Herroelen, W.1
De Reyck, B.2
Demeulemeester, E.3
-
65
-
-
0002812653
-
A classification scheme for project scheduling problem
-
Weglarz J, Kluwer Academic Publishers, Dortrecht
-
Herroelen W, Demeulemeester E, De Reyck B (1999) A classification scheme for project scheduling problem. In: Weglarz J (ed) Project scheduling - Recent models, algorithms and applications. Kluwer Academic Publishers, Dortrecht, pp 1-26
-
(1999)
Project Scheduling - Recent Models, Algorithms and Applications
, pp. 1-26
-
-
Herroelen, W.1
Demeulemeester, E.2
De Reyck, B.3
-
66
-
-
1542422015
-
Critical chain project scheduling: Do not oversimplify
-
Herroelen W, Leus R, Demeulemeester E (2002) Critical chain project scheduling: do not oversimplify. Proj Manag J 33:48-60
-
(2002)
Proj Manag J
, vol.33
, pp. 48-60
-
-
Herroelen, W.1
Leus, R.2
Demeulemeester, E.3
-
67
-
-
0018444440
-
A dynamic programming algorithm for decision cpm networks
-
Hindelang T, Muth J (1979) A dynamic programming algorithm for decision CPM networks. Oper Res 27:225-241
-
(1979)
Oper Res
, vol.27
, pp. 225-241
-
-
Hindelang, T.1
Muth, J.2
-
68
-
-
0013408112
-
Schedule risk analysis simplified
-
July
-
Hulett D (1996) Schedule risk analysis simplified. Project Management Network July:23-30
-
(1996)
Project Management Network
, pp. 23-30
-
-
Hulett, D.1
-
70
-
-
65249138825
-
Forecasting project schedule completion with earned value metrics
-
March
-
Jacob D (2003) Forecasting project schedule completion with earned value metrics. The Measurable News March:1, 7-9
-
(2003)
The Measurable News
, vol.1
, pp. 7-9
-
-
Jacob, D.1
-
71
-
-
84855869965
-
Is “earned schedule” an unreliable indicator?
-
Jacob D (2006) Is “earned schedule” an unreliable indicator? The Measurable News Fall:15-21
-
(2006)
The Measurable News Fall
, pp. 15-21
-
-
Jacob, D.1
-
72
-
-
35448950734
-
Forecasting schedule completion using earned value metrics? Revisited
-
Jacob D, Kane M (2004) Forecasting schedule completion using earned value metrics? Revisited. The Measurable News Summer:1, 11-17
-
(2004)
The Measurable News Summer
, vol.1
, pp. 11-17
-
-
Jacob, D.1
Kane, M.2
-
73
-
-
0039204681
-
Coefficient of network complexity
-
Kaimann R (1974) Coefficient of network complexity. Manag Sci 21:172-177
-
(1974)
Manag Sci
, vol.21
, pp. 172-177
-
-
Kaimann, R.1
-
74
-
-
0041461811
-
Coefficient of network complexity: Erratum
-
Kaimann R (1975) Coefficient of network complexity: erratum. Manag Sci 21:1211-1212
-
(1975)
Manag Sci
, vol.21
, pp. 1211-1212
-
-
Kaimann, R.1
-
75
-
-
0035454358
-
Optimal schedule planning for multiple, repetitive construction process
-
Kang L, Park IC, Lee BH (2001) Optimal schedule planning for multiple, repetitive construction process. J Constr Eng Manag 127:382-390
-
(2001)
J Constr Eng Manag
, vol.127
, pp. 382-390
-
-
Kang, L.1
Park, I.C.2
Lee, B.H.3
-
76
-
-
0020103084
-
On dynamic programming methods for assembly line balancing
-
Kao E, Queyranne M (1982) On dynamic programming methods for assembly line balancing. Oper Res 30:375-390
-
(1982)
Oper Res
, vol.30
, pp. 375-390
-
-
Kao, E.1
Queyranne, M.2
-
77
-
-
0030269124
-
Project scheduling with discounted cash flows and progress payments
-
Kazaz B, Sepil C (1996) Project scheduling with discounted cash flows and progress payments. J Oper Res Soc 47:1262-1272
-
(1996)
J Oper Res Soc
, vol.47
, pp. 1262-1272
-
-
Kazaz, B.1
Sepil, C.2
-
79
-
-
33845270624
-
Experimental investigation of heuristics for resource-constrained project scheduling: An update
-
Kolisch R, Hartmann S (2006) Experimental investigation of heuristics for resource-constrained project scheduling: an update. Eur J Oper Res 174:23-37
-
(2006)
Eur J Oper Res
, vol.174
, pp. 23-37
-
-
Kolisch, R.1
Hartmann, S.2
-
80
-
-
0000698758
-
Characterization and generation of a general class of resource-constrained project scheduling problems
-
Kolisch R, Sprecher A, Drexl A (1995) Characterization and generation of a general class of resource-constrained project scheduling problems. Manag Sci 41:1693-1703
-
(1995)
Manag Sci
, vol.41
, pp. 1693-1703
-
-
Kolisch, R.1
Sprecher, A.2
Drexl, A.3
-
81
-
-
0035399734
-
Use of fuzzy numbers in project risk (Criticality) assessment
-
Kuchta D (2001) Use of fuzzy numbers in project risk (criticality) assessment. Int J Proj Manag 19:305-310
-
(2001)
Int J Proj Manag
, vol.19
, pp. 305-310
-
-
Kuchta, D.1
-
83
-
-
0001620447
-
Critical path planning and scheduling: Mathematical basis
-
Kelley J (1961) Critical path planning and scheduling: mathematical basis. Oper Res 9:296-320
-
(1961)
Oper Res
, vol.9
, pp. 296-320
-
-
Kelley, J.1
-
85
-
-
35448998301
-
Connecting earned value to the schedule
-
Lipke W (2004) Connecting earned value to the schedule. The Measurable News Winter:1, 6-16
-
(2004)
The Measurable News Winter
, vol.1
, pp. 6-16
-
-
Lipke, W.1
-
86
-
-
84900631233
-
Applying earned schedule to critical path analysis and more
-
Lipke W (2006) Applying earned schedule to critical path analysis and more. The Measurable News Fall:26-30
-
(2006)
The Measurable News Fall
, pp. 26-30
-
-
Lipke, W.1
-
87
-
-
64449085007
-
Prediction of project outcome: The application of statistical methods to earned value management and earned schedule performance indexes
-
Lipke W, Zwikael O, Henderson K, Anbari F (2009) Prediction of project outcome: the application of statistical methods to earned value management and earned schedule performance indexes. Int J Proj Manage 27:400-407
-
(2009)
Int J Proj Manage
, vol.27
, pp. 400-407
-
-
Lipke, W.1
Zwikael, O.2
Henderson, K.3
Anbari, F.4
-
89
-
-
84954622213
-
An analytical study of the pert assumptions
-
Archibald, R.D. and Villoria, R.L, Wiley, New York
-
MacCrimmon K, Ryavec C (1967) An analytical study of the PERT assumptions. In: Archibald, R.D. and Villoria, R.L. (eds) Network-based management systems (PERT/CMP). Wiley, New York, pp 24-26
-
(1967)
Network-Based Management Systems (PERT/CMP)
, pp. 24-26
-
-
Mac Crimmon, K.1
Ryavec, C.2
-
90
-
-
0001636411
-
An experimental and comparative evaluation of production line balancing techniques
-
Mastor A (1970) An experimental and comparative evaluation of production line balancing techniques. Manag Sci 16:728-746
-
(1970)
Manag Sci
, vol.16
, pp. 728-746
-
-
Mastor, A.1
-
91
-
-
84955278998
-
Modelling setup times in project scheduling
-
International series in operations research & management science. Springer, New York
-
Mika M (2006) Modelling setup times in project scheduling. In: Perspectives in modern project scheduling, vol 92, International series in operations research & management science. Springer, New York, pp 131-163
-
(2006)
Perspectives in Modern Project Scheduling
, vol.92
, pp. 131-163
-
-
Mika, M.1
-
93
-
-
0021161421
-
Minimizing costs of resource requirements in project networks subject to a fixed completion time
-
Mohring R (1984) Minimizing costs of resource requirements in project networks subject to a fixed completion time. Oper Res 32:89-120
-
(1984)
Oper Res
, vol.32
, pp. 89-120
-
-
Mohring, R.1
-
94
-
-
0027866760
-
Scheduling of repetitive projects with cost optimization
-
Moselhi O, El-Rayes K (1993) Scheduling of repetitive projects with cost optimization. J Constr Eng Manage 119:681-697
-
(1993)
J Constr Eng Manage
, vol.119
, pp. 681-697
-
-
Moselhi, O.1
El-Rayes, K.2
-
95
-
-
0034244772
-
An individual-based description of learning within an organization
-
Nembhard D, Uzumeri M (2000) An individual-based description of learning within an organization. IEEE Trans Eng Manag 47(3):370-378
-
(2000)
IEEE Trans Eng Manag
, vol.47
, Issue.3
, pp. 370-378
-
-
Nembhard, D.1
Uzumeri, M.2
-
96
-
-
0029393209
-
A survey on the resource-constrained project scheduling problem
-
Özdamar L, Ulusoy G (1995) A survey on the resource-constrained project scheduling problem. IIE Trans 27:574-586
-
(1995)
IIE Trans
, vol.27
, pp. 574-586
-
-
Özdamar, L.1
Ulusoy, G.2
-
98
-
-
0016935106
-
Project scheduling: The effects of problem structure on heuristic scheduling
-
Patterson J (1976) Project scheduling: the effects of problem structure on heuristic scheduling. Nav Res Logist 23:95-123
-
(1976)
Nav Res Logist
, vol.23
, pp. 95-123
-
-
Patterson, J.1
-
99
-
-
0005764899
-
An implicit enumeration algorithm for the time/cost trade-off problem in project network analysis
-
Patterson J (1979) An implicit enumeration algorithm for the time/cost trade-off problem in project network analysis. Found Control Eng 6:107-117
-
(1979)
Found Control Eng
, vol.6
, pp. 107-117
-
-
Patterson, J.1
-
100
-
-
84954586567
-
How do you measure the quality of your project management?
-
Pinnell S, Busch J (1993) How do you measure the quality of your project management? PM Network December:35-36
-
(1993)
PM Network December
, pp. 35-36
-
-
Pinnell, S.1
Busch, J.2
-
101
-
-
84954578599
-
Cpsim2: The critical path simulator (windows version). Richard ivey
-
London
-
Piper C (2005) Cpsim2: the critical path simulator (windows version). Richard Ivey School of Business, London
-
(2005)
School of Business
-
-
Piper, C.1
-
102
-
-
58049139009
-
-
3rd edn. Project Management Institute, Inc., Newtown Square Port O, Schiller Z, King R, Woodruff D
-
PMBOK (2004) A guide to the project management body of knowledge, 3rd edn. Project Management Institute, Inc., Newtown Square Port O, Schiller Z, King R, Woodruff D
-
(2004)
A Guide to the Project Management Body of Knowledge
-
-
-
104
-
-
0016566179
-
A dynamic programming solution to cost/time trade-off for cpm
-
Robinson D (1975) A dynamic programming solution to cost/time trade-off for CPM. Manag Sci 22:158-166
-
(1975)
Manag Sci
, vol.22
, pp. 158-166
-
-
Robinson, D.1
-
105
-
-
0042359838
-
A new problem generator for different resource-constrained project scheduling problems with minimal and maximal time lags
-
Institut fur Wirtschaftstheorie und Operations Research, University of Karlsruhe
-
Schwindt C (1995) A new problem generator for different resource-constrained project scheduling problems with minimal and maximal time lags. WIOR-Report-449, Institut fur Wirtschaftstheorie und Operations Research, University of Karlsruhe
-
(1995)
Wior-Report-449
-
-
Schwindt, C.1
-
106
-
-
0031271266
-
Performance of the heuristic procedures for constrained projects with progress payments
-
Sepil C, Ortac N (1997) Performance of the heuristic procedures for constrained projects with progress payments. J Oper Res Soc 48:1123-1130
-
(1997)
J Oper Res Soc
, vol.48
, pp. 1123-1130
-
-
Sepil, C.1
Ortac, N.2
-
107
-
-
0013370739
-
Scheduling of programs with repetitive projects
-
Shtub A (1991)
-
Shtub, A. (1991). Shtub A (1991) Scheduling of programs with repetitive projects. Proj Manage J 22:49-53
-
(1991)
Proj Manage J
, vol.22
, pp. 49-53
-
-
Shtub, A.1
-
109
-
-
0030571697
-
Scheduling programs with repetitive projects: A comparison of a simulated annealing, a genetic and a pair-wise swap algorithm
-
Shtub A, LeBlanc L, Cai Z (1996) Scheduling programs with repetitive projects: a comparison of a simulated annealing, a genetic and a pair-wise swap algorithm. Eur J Oper Res 88:124-138
-
(1996)
Eur J Oper Res
, vol.88
, pp. 124-138
-
-
Shtub, A.1
Le Blanc, L.2
Cai, Z.3
-
110
-
-
0032208139
-
Approximation algorithms for the discrete time-cost tradeoff problem
-
Skutella M (1998) Approximation algorithms for the discrete time-cost tradeoff problem. Math Oper Res 23:909-929
-
(1998)
Math Oper Res
, vol.23
, pp. 909-929
-
-
Skutella, M.1
-
112
-
-
0343953621
-
The risk of delay of a project in terms of the morphology of its network
-
Tavares L, Ferreira J, Coelho J (1999) The risk of delay of a project in terms of the morphology of its network. Eur J Oper Res 119:510-537
-
(1999)
Eur J Oper Res
, vol.119
, pp. 510-537
-
-
Tavares, L.1
Ferreira, J.2
Coelho, J.3
-
113
-
-
0017537769
-
Measures of the restrictiveness of project networks
-
Thesen A (1977) Measures of the restrictiveness of project networks. Networks 7:193-208
-
(1977)
Networks
, vol.7
, pp. 193-208
-
-
Thesen, A.1
-
114
-
-
0034561525
-
An equitable approach to the payment scheduling problem in project management
-
Ulusoy G, Cebelli S (2000) An equitable approach to the payment scheduling problem in project management. Eur J Oper Res 127:262-278
-
(2000)
Eur J Oper Res
, vol.127
, pp. 262-278
-
-
Ulusoy, G.1
Cebelli, S.2
-
116
-
-
33645967441
-
A comparison of different project duration forecasting methods using earned value metrics
-
Vandevoorde S, Vanhoucke M (2006) A comparison of different project duration forecasting methods using earned value metrics. Int J Proj Manag 24:289-302
-
(2006)
Int J Proj Manag
, vol.24
, pp. 289-302
-
-
Vandevoorde, S.1
Vanhoucke, M.2
-
117
-
-
13444280108
-
New computational results for the discrete time/cost trade-off problem with time-switch constraints
-
Vanhoucke M (2005) New computational results for the discrete time/cost trade-off problem with time-switch constraints. Eur J Oper Res 165:359-374
-
(2005)
Eur J Oper Res
, vol.165
, pp. 359-374
-
-
Vanhoucke, M.1
-
118
-
-
33745792731
-
An efficient hybrid search algorithm for various optimization problems
-
Vanhoucke M (2006a) An efficient hybrid search algorithm for various optimization problems. Lect Notes Comput Sci 3906:272-283
-
(2006)
Lect Notes Comput Sci
, vol.3906
, pp. 272-283
-
-
Vanhoucke, M.1
-
119
-
-
33645501149
-
Work continuity constraints in project scheduling
-
Vanhoucke M (2006b) Work continuity constraints in project scheduling. J Constr Eng Manag 132:14-25
-
(2006)
J Constr Eng Manag
, vol.132
, pp. 14-25
-
-
Vanhoucke, M.1
-
120
-
-
41449118277
-
Work continuity optimization for the westerscheldetunnel project in the netherlands
-
Vanhoucke M (2007) Work continuity optimization for the Westerscheldetunnel project in the Netherlands. Tijdschrift voor Economie en Management 52:435-449
-
(2007)
Tijdschrift Voor Economie En Management
, vol.52
, pp. 435-449
-
-
Vanhoucke, M.1
-
123
-
-
41449117771
-
Setup times and fast tracking in resource-constrained project scheduling
-
Vanhoucke M (2008c) Setup times and fast tracking in resource-constrained project scheduling. Comput Ind Eng 54:1062-1070
-
(2008)
Comput Ind Eng
, vol.54
, pp. 1062-1070
-
-
Vanhoucke, M.1
-
124
-
-
84952004004
-
Static and dynamic determinants of earned value based time forecast accuracy
-
Kidd T, Information Science Reference, Hershey
-
Vanhoucke M (2009) Static and dynamic determinants of earned value based time forecast accuracy. In: Kidd T (ed) Handbook of research on technology project management, planning, and operations. Information Science Reference, Hershey, pp 361-374
-
(2009)
Handbook of Research on Technology Project Management, Planning, and Operations
, pp. 361-374
-
-
Vanhoucke, M.1
-
126
-
-
77953177108
-
Using activity sensitivity and network topology information to monitor project time performance
-
Vanhoucke M (2010b) Using activity sensitivity and network topology information to monitor project time performance. Omega Int J Manag Sci 38:359-370
-
(2010)
Omega Int J Manag Sci
, vol.38
, pp. 359-370
-
-
Vanhoucke, M.1
-
127
-
-
78649854792
-
On the dynamic use of project performance and schedule risk information during project tracking
-
Vanhoucke M (2011) On the dynamic use of project performance and schedule risk information during project tracking. Omega Int J Manag Sci 39:416-426
-
(2011)
Omega Int J Manag Sci
, vol.39
, pp. 416-426
-
-
Vanhoucke, M.1
-
128
-
-
34848917527
-
The discrete time/cost trade-off problem: Extensions and heuristic procedures
-
Vanhoucke M, Debels D (2007) The discrete time/cost trade-off problem: extensions and heuristic procedures. J Sched 10:311-326
-
(2007)
J Sched
, vol.10
, pp. 311-326
-
-
Vanhoucke, M.1
Debels, D.2
-
129
-
-
36048993713
-
The impact of various activity assumptions on the lead time and resource utilization of resource-constrained projects
-
Vanhoucke M, Debels D (2008) The impact of various activity assumptions on the lead time and resource utilization of resource-constrained projects. Comput Ind Eng 54:140-154
-
(2008)
Comput Ind Eng
, vol.54
, pp. 140-154
-
-
Vanhoucke, M.1
Debels, D.2
-
130
-
-
70449475514
-
Measuring the accuracy of earned value/earned schedule forecasting predictors. The measurable news
-
Vanhoucke M, Vandevoorde S (2007a) Measuring the accuracy of earned value/earned schedule forecasting predictors. The Measurable News, Winter:26-30
-
(2007)
Winter
, pp. 26-30
-
-
Vanhoucke, M.1
Vandevoorde, S.2
-
131
-
-
35448944883
-
A simulation and evaluation of earned value metrics to forecast the project duration
-
Vanhoucke M, Vandevoorde S (2007b) A simulation and evaluation of earned value metrics to forecast the project duration. J Oper Res Soc 58:1361-1374
-
(2007)
J Oper Res Soc
, vol.58
, pp. 1361-1374
-
-
Vanhoucke, M.1
Vandevoorde, S.2
-
133
-
-
84866254968
-
Forecasting a project’s duration under various topological structures
-
Vanhoucke M, Vandevoorde S (2009) Forecasting a project’s duration under various topological structures. The Measurable News Spring:26-30
-
(2009)
The Measurable News Spring
, pp. 26-30
-
-
Vanhoucke, M.1
Vandevoorde, S.2
-
134
-
-
0035922498
-
Maximizing the net present value of a project with linear time-dependent cash flows
-
Vanhoucke M, Demeulemeester E, Herroelen W (2001a) Maximizing the net present value of a project with linear time-dependent cash flows. Int J Prod Res 39:3159-3181
-
(2001)
Int J Prod Res
, vol.39
, pp. 3159-3181
-
-
Vanhoucke, M.1
Demeulemeester, E.2
Herroelen, W.3
-
135
-
-
0035435965
-
On maximizing the net present value of a project under renewable resource constraints
-
Vanhoucke M, Demeulemeester E, Herroelen W (2001b) On maximizing the net present value of a project under renewable resource constraints. Manag Sci 47:1113-1121
-
(2001)
Manag Sci
, vol.47
, pp. 1113-1121
-
-
Vanhoucke, M.1
Demeulemeester, E.2
Herroelen, W.3
-
136
-
-
0036639255
-
Discrete time/cost trade-offs in project scheduling with time-switch constraints
-
Vanhoucke M, Demeulemeester E, Herroelen W (2002) Discrete time/cost trade-offs in project scheduling with time-switch constraints. J Oper Res Soc 53:741-751
-
(2002)
J Oper Res Soc
, vol.53
, pp. 741-751
-
-
Vanhoucke, M.1
Demeulemeester, E.2
Herroelen, W.3
-
138
-
-
36048990558
-
An evaluation of the adequacy of project network generators with systematically sampled networks
-
Vanhoucke M, Coelho J, Debels D, Maenhout B, Tavares L (2008) An evaluation of the adequacy of project network generators with systematically sampled networks. Eur J Oper Res 187: 511-524
-
(2008)
Eur J Oper Res
, vol.187
, pp. 511-524
-
-
Vanhoucke, M.1
Coelho, J.2
Debels, D.3
Maenhout, B.4
Tavares, L.5
-
139
-
-
70349276753
-
A genetic algorithm for the preemptive and non-preemtive multi-mode resource-constrained project scheduling problem
-
Van Peteghem V, Vanhoucke M (2010a) A genetic algorithm for the preemptive and non-preemtive multi-mode resource-constrained project scheduling problem. Eur J Oper Res 201:409-418
-
(2010)
Eur J Oper Res
, vol.201
, pp. 409-418
-
-
Van Peteghem, V.1
Vanhoucke, M.2
-
140
-
-
84954591112
-
Introducing learning effects in resource-constrained project scheduling. Technical report
-
Ghent, Belgium
-
Van Peteghem V, Vanhoucke M (2010b) Introducing learning effects in resource-constrained project scheduling. Technical report, Ghent University, Ghent, Belgium
-
(2010)
Ghent University
-
-
Van Peteghem, V.1
Vanhoucke, M.2
-
142
-
-
84930479504
-
A management guide to pert/cpm: With gert/pdm/dcpm and other networks
-
Inc, Englewood Cliffs
-
Wiest J, Levy F (1977) A management guide to PERT/CPM: with GERT/PDM/DCPM and other networks. Prentice-Hall, Inc, Englewood Cliffs
-
(1977)
Prentice-Hall
-
-
Wiest, J.1
Levy, F.2
-
143
-
-
0026854670
-
Criticality in stochastic networks
-
Williams T (1992) Criticality in stochastic networks. J Oper Res Soc 43:353-357
-
(1992)
J Oper Res Soc
, vol.43
, pp. 353-357
-
-
Williams, T.1
-
144
-
-
0001250106
-
Factors affecting the cost of airplanes
-
Wright T (1936) Factors affecting the cost of airplanes. J Aeronaut Sci 3:122-128
-
(1936)
J Aeronaut Sci
, vol.3
, pp. 122-128
-
-
Wright, T.1
-
145
-
-
84989431553
-
The learning curves: Historical review and comprehensive survey
-
Yelle L (1979) The learning curves: historical review and comprehensive survey. Decis Sci 10(2):302-328
-
(1979)
Decis Sci
, vol.10
, Issue.2
, pp. 302-328
-
-
Yelle, L.1
|