![]() |
Volumn 15, Issue 3, 1997, Pages 187-192
|
Optimization of float use in risk analysis-based network scheduling
a
|
Author keywords
Float; Network scheduling; Optimization; Risk analysis
|
Indexed keywords
COSTS;
OPTIMIZATION;
RESOURCE ALLOCATION;
RISK ASSESSMENT;
SCHEDULING;
STRATEGIC PLANNING;
RISK ANALYSIS BASED NETWORK SCHEDULING;
TIME DEPENDENT COST (TDC);
PROJECT MANAGEMENT;
BRIDGE PROJECT;
FLOAT USE;
NETWORK SCHEDULING;
OPTIMIZATION;
RISK ANALYSIS;
|
EID: 0031153881
PISSN: 02637863
EISSN: None
Source Type: Journal
DOI: 10.1016/S0263-7863(95)00083-6 Document Type: Article |
Times cited : (26)
|
References (11)
|