메뉴 건너뛰기




Volumn 38, Issue 5, 2010, Pages 359-370

Using activity sensitivity and network topology information to monitor project time performance

Author keywords

Project management; Simulation

Indexed keywords

DECISION MAKING; INFORMATION MANAGEMENT; NETWORK TOPOLOGY;

EID: 77953177108     PISSN: 03050483     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.omega.2009.10.001     Document Type: Article
Times cited : (95)

References (37)
  • 1
    • 5244364936 scopus 로고
    • Bias in PERT project completion time calculations for a real network
    • Klingel A. Bias in PERT project completion time calculations for a real network. Management Science 1966, 13:B194-B201.
    • (1966) Management Science , vol.13
    • Klingel, A.1
  • 2
    • 0038654496 scopus 로고
    • Why projects are "always" late: a rationale based on manual simulation of a PERT/CPM network
    • Schonberger R. Why projects are "always" late: a rationale based on manual simulation of a PERT/CPM network. Interfaces 1981, 11:65-70.
    • (1981) Interfaces , vol.11 , pp. 65-70
    • Schonberger, R.1
  • 3
    • 0026207547 scopus 로고
    • Parkinson's law and its implications for project management
    • Gutierrez G., Kouvelis P. Parkinson's law and its implications for project management. Management Science 1991, 37:990-1001.
    • (1991) Management Science , vol.37 , pp. 990-1001
    • Gutierrez, G.1    Kouvelis, P.2
  • 4
    • 80053398525 scopus 로고    scopus 로고
    • Schedule risk analysis simplified
    • Project Management Network, July
    • Hulett D. Schedule risk analysis simplified. Project Management Network, July 1996.
    • (1996)
    • Hulett, D.1
  • 5
    • 85167856402 scopus 로고    scopus 로고
    • Schedule is different. The Measurable News;Summer:31-34.
    • Lipke W. Schedule is different. The Measurable News 2003;Summer:31-34.
    • (2003)
    • Lipke, W.1
  • 6
    • 33645967441 scopus 로고    scopus 로고
    • A comparison of different project duration forecasting methods using earned value metrics
    • Vandevoorde S., Vanhoucke M. A comparison of different project duration forecasting methods using earned value metrics. International Journal of Project Management 2006, 24:289-302.
    • (2006) International Journal of Project Management , vol.24 , pp. 289-302
    • Vandevoorde, S.1    Vanhoucke, M.2
  • 7
    • 35448944883 scopus 로고    scopus 로고
    • A simulation and evaluation of earned value metrics to forecast the project duration
    • Vanhoucke M., Vandevoorde S. A simulation and evaluation of earned value metrics to forecast the project duration. Journal of the Operational Research Society 2007, 58:1361-1374.
    • (2007) Journal of the Operational Research Society , vol.58 , pp. 1361-1374
    • Vanhoucke, M.1    Vandevoorde, S.2
  • 8
    • 64449085007 scopus 로고    scopus 로고
    • Prediction of project outcome: The application of statistical methods to earned value management and earned schedule performance indexes
    • Lipke W., Zwikael O., Henderson K., Anbari F. Prediction of project outcome: The application of statistical methods to earned value management and earned schedule performance indexes. International Journal of Project Management 2009, 27:400-407.
    • (2009) International Journal of Project Management , vol.27 , pp. 400-407
    • Lipke, W.1    Zwikael, O.2    Henderson, K.3    Anbari, F.4
  • 10
    • 0034559444 scopus 로고    scopus 로고
    • On criticality and sensitivity in activity networks
    • Elmaghraby S. On criticality and sensitivity in activity networks. European Journal of Operational Research 2000, 127:220-238.
    • (2000) European Journal of Operational Research , vol.127 , pp. 220-238
    • Elmaghraby, S.1
  • 11
    • 34249865056 scopus 로고    scopus 로고
    • A new approximation algorithm for obtaining the probability distribution function for project completion time
    • Yao M.-J., Chu W.-M. A new approximation algorithm for obtaining the probability distribution function for project completion time. Computers & Mathematics with Applications 2007, 54:282-295.
    • (2007) Computers & Mathematics with Applications , vol.54 , pp. 282-295
    • Yao, M.-J.1    Chu, W.-M.2
  • 12
    • 85167849822 scopus 로고    scopus 로고
    • PMBOK. A guide to the project management body of knowledge, 3rd ed. Newtown Square, PA: Project Management Institute, Inc.
    • PMBOK. A guide to the project management body of knowledge, 3rd ed. Newtown Square, PA: Project Management Institute, Inc.; 2004.
    • (2004)
  • 13
    • 0003107787 scopus 로고
    • Distribution of the time through a directed, acyclic network
    • Martin J. Distribution of the time through a directed, acyclic network. Operations Research 1965, 13:46-66.
    • (1965) Operations Research , vol.13 , pp. 46-66
    • Martin, J.1
  • 14
    • 0000738834 scopus 로고
    • Monte Carlo methods and the PERT problem
    • Van Slyke R. Monte Carlo methods and the PERT problem. Operations Research 1963, 11:839-860.
    • (1963) Operations Research , vol.11 , pp. 839-860
    • Van Slyke, R.1
  • 15
    • 0022012461 scopus 로고
    • Approximating the criticality indices of the activities in PERT networks
    • Dodin B., Elmaghraby S. Approximating the criticality indices of the activities in PERT networks. Management Science 1985, 31:207-223.
    • (1985) Management Science , vol.31 , pp. 207-223
    • Dodin, B.1    Elmaghraby, S.2
  • 17
    • 0031257870 scopus 로고    scopus 로고
    • An uncertainty importance measure of activities in PERT networks
    • Cho J., Yum B. An uncertainty importance measure of activities in PERT networks. International Journal of Production Research 1997, 35:2737-2758.
    • (1997) International Journal of Production Research , vol.35 , pp. 2737-2758
    • Cho, J.1    Yum, B.2
  • 19
    • 0035399734 scopus 로고    scopus 로고
    • Use of fuzzy numbers in project risk (criticality) assessment
    • Kuchta D. Use of fuzzy numbers in project risk (criticality) assessment. International Journal of Project Management 2001, 19:305-310.
    • (2001) International Journal of Project Management , vol.19 , pp. 305-310
    • Kuchta, D.1
  • 21
    • 0034313858 scopus 로고    scopus 로고
    • Analysis of the effects of uncertainty, risk-pooling, and subcontracting mechanisms on project performance
    • Gutierrez G., Paul A. Analysis of the effects of uncertainty, risk-pooling, and subcontracting mechanisms on project performance. Operations Research 2000, 48:927-938.
    • (2000) Operations Research , vol.48 , pp. 927-938
    • Gutierrez, G.1    Paul, A.2
  • 25
    • 84859862587 scopus 로고    scopus 로고
    • Measuring the accuracy of earned value/earned schedule forecasting predictors
    • The Measurable News;Winter:26-30.
    • Vanhoucke M, Vandevoorde S. Measuring the accuracy of earned value/earned schedule forecasting predictors. The Measurable News 2007;Winter:26-30.
    • (2007)
    • Vanhoucke, M.1    Vandevoorde, S.2
  • 26
    • 78649808154 scopus 로고    scopus 로고
    • Earned value forecast accuracy and activity criticality
    • The Measurable News;Summer:13-16.
    • Vanhoucke M, Vandevoorde S. Earned value forecast accuracy and activity criticality. The Measurable News 2008;Summer:13-16.
    • (2008)
    • Vanhoucke, M.1    Vandevoorde, S.2
  • 27
    • 0001636411 scopus 로고
    • An experimental and comparative evaluation of production line balancing techniques
    • Mastor A. An experimental and comparative evaluation of production line balancing techniques. Management Science 1970, 16:728-746.
    • (1970) Management Science , vol.16 , pp. 728-746
    • Mastor, A.1
  • 31
    • 0001083779 scopus 로고    scopus 로고
    • The triangular distribution as a proxy for the beta distribution in risk analysis
    • Johnson D. The triangular distribution as a proxy for the beta distribution in risk analysis. Statistician 1997, 46:387-398.
    • (1997) Statistician , vol.46 , pp. 387-398
    • Johnson, D.1
  • 32
    • 49749100423 scopus 로고    scopus 로고
    • Introduction to modeling and generating probabilistic input processes for simulations
    • In: Henderson S, Biller B, Hsieh M, Shortle J, Tew J, Barton R, editors. Proceedings of the 2007 winter simulation conference. New Jersey: Institute of Electrical and Electronics Engineers
    • Kuhl ME, Lada EK, Steiger NM, Wagner MA, Wilson JR. Introduction to modeling and generating probabilistic input processes for simulation. In: Henderson S, Biller B, Hsieh M, Shortle J, Tew J, Barton R, editors. Proceedings of the 2007 winter simulation conference. New Jersey: Institute of Electrical and Electronics Engineers; 2007. p. 63-76.
    • (2007) , pp. 63-76
    • Kuhl, M.E.1    Lada, E.K.2    Steiger, N.M.3    Wagner, M.A.4    Wilson, J.R.5
  • 36
    • 85167854903 scopus 로고    scopus 로고
    • The effect of project schedule adherence and rework on the duration forecast accuracy of earned value metrics
    • Technical Report, Ghent University, Ghent, Belgium
    • Vanhoucke M. The effect of project schedule adherence and rework on the duration forecast accuracy of earned value metrics. Technical Report, Ghent University, Ghent, Belgium; 2008.
    • (2008)
    • Vanhoucke, M.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.