Volumn 30, Issue 1, 1999, Pages 47-82

The effects of learning, forgetting, and relearning on decision rule performance in multiproject scheduling

Author keywords

Heuristics; Project management

Indexed keywords


EID: 0041033427     PISSN: 00117315     EISSN: None     Source Type: Journal    
DOI: 10.1111/j.1540-5915.1999.tb01601.x     Document Type: Article
Times cited : (40)

References (38)
  • 1
    • 0000559680 scopus 로고
    • Reliability of progress curves in air-frame production
    • Alchian, A. (1963). Reliability of progress curves in air-frame production. Econometrica, 31(4), 679-693.
    • (1963) Econometrica , vol.31 , Issue.4 , pp. 679-693
    • Alchian, A.1
  • 3
    • 84985756243 scopus 로고
    • A comparison of due date setting, resource assignment, and job preemption heuristics for the multiproject scheduling problem
    • Bock, D., & Patterson, J. H. (1990). A comparison of due date setting, resource assignment, and job preemption heuristics for the multiproject scheduling problem. Decision Sciences, 21(3), 387-402.
    • (1990) Decision Sciences , vol.21 , Issue.3 , pp. 387-402
    • Bock, D.1    Patterson, J.H.2
  • 5
    • 0006620114 scopus 로고
    • The rate of technical progress: The Indianapolis 500
    • Brazel, Y. (1972). The rate of technical progress: The Indianapolis 500. Journal of Economic Theory, 4, 72-81.
    • (1972) Journal of Economic Theory , vol.4 , pp. 72-81
    • Brazel, Y.1
  • 6
    • 0016993277 scopus 로고
    • How much does forgetting cost
    • Carlson, J. G., & Rowe, A. J. (1976). How much does forgetting cost. Industrial Engineering, 8(9), 40-47.
    • (1976) Industrial Engineering , vol.8 , Issue.9 , pp. 40-47
    • Carlson, J.G.1    Rowe, A.J.2
  • 8
    • 0016972372 scopus 로고
    • Heuristics for scheduling resource constrained projects: An experimental investigation
    • Cooper, D. F. (1976). Heuristics for scheduling resource constrained projects: An experimental investigation. Management Science, 22(11), 1186-1194.
    • (1976) Management Science , vol.22 , Issue.11 , pp. 1186-1194
    • Cooper, D.F.1
  • 9
    • 0015725454 scopus 로고
    • Project scheduling under resource constraints - Historical review and categorization of procedures
    • Davis, E. W. (1973). Project scheduling under resource constraints - Historical review and categorization of procedures. AIIE Transactions, 5(4), 297-313.
    • (1973) AIIE Transactions , vol.5 , Issue.4 , pp. 297-313
    • Davis, E.W.1
  • 10
    • 0016520377 scopus 로고
    • Project network summary measures constrained-resource scheduling
    • Davis, E. W. (1975). Project network summary measures constrained-resource scheduling. AIIE Transactions, 7(2), 132-142.
    • (1975) AIIE Transactions , vol.7 , Issue.2 , pp. 132-142
    • Davis, E.W.1
  • 11
    • 0016498438 scopus 로고
    • A comparison of heuristic and optimum solutions in resource-constrained project scheduling
    • Davis, E. W., & Patterson, J. H. (1975). A comparison of heuristic and optimum solutions in resource-constrained project scheduling. Management Science, 21(8), 944-955.
    • (1975) Management Science , vol.21 , Issue.8 , pp. 944-955
    • Davis, E.W.1    Patterson, J.H.2
  • 12
    • 0002907360 scopus 로고
    • A branch-and-bound procedure for the multiple resource-constrained project scheduling problem
    • Demeulemeester, E., & Herroelen, W. S. (1992). A branch-and-bound procedure for the multiple resource-constrained project scheduling problem. Management Science, 38(12), 1803-1818.
    • (1992) Management Science , vol.38 , Issue.12 , pp. 1803-1818
    • Demeulemeester, E.1    Herroelen, W.S.2
  • 13
    • 0023824517 scopus 로고
    • Evaluating project scheduling and due date assignment procedures: An experimental analysis
    • Dumond, J., & Mabert, V. A. (1988). Evaluating project scheduling and due date assignment procedures: An experimental analysis. Management Science, 34, 101-118.
    • (1988) Management Science , vol.34 , pp. 101-118
    • Dumond, J.1    Mabert, V.A.2
  • 14
    • 0012233675 scopus 로고
    • The influence of job related variables on the predictability power of three learning curve models
    • Globerson, S. (1980). The influence of job related variables on the predictability power of three learning curve models. AIIE Transactions, 12(1), 64-69.
    • (1980) AIIE Transactions , vol.12 , Issue.1 , pp. 64-69
    • Globerson, S.1
  • 15
    • 0024905372 scopus 로고
    • The impact of breaks on forgetting when performing a repetitive task
    • Globerson, S., Levin, N., & Shtub, A. (1989). The impact of breaks on forgetting when performing a repetitive task. IIE Transactions, 21(4), 376-381.
    • (1989) IIE Transactions , vol.21 , Issue.4 , pp. 376-381
    • Globerson, S.1    Levin, N.2    Shtub, A.3
  • 16
    • 0001627565 scopus 로고
    • Firm progress ratios
    • Hirsch, W. Z. (1956). Firm progress ratios. Econometrica, 24(2), 136-143.
    • (1956) Econometrica , vol.24 , Issue.2 , pp. 136-143
    • Hirsch, W.Z.1
  • 18
    • 0039466055 scopus 로고
    • The learning curve: A case history in its application
    • Kottler, J. L. (1964). The learning curve: A case history in its application. The Journal of Industrial Engineering, 15, 176-180.
    • (1964) The Journal of Industrial Engineering , vol.15 , pp. 176-180
    • Kottler, J.L.1
  • 19
    • 33751552022 scopus 로고
    • Multiproject scheduling: Analysis of scheduling strategies under unequal delay penalties
    • Kurtulus, I. S. (1985). Multiproject scheduling: Analysis of scheduling strategies under unequal delay penalties. Journal of Operations Management, 5(3), 291-307.
    • (1985) Journal of Operations Management , vol.5 , Issue.3 , pp. 291-307
    • Kurtulus, I.S.1
  • 20
    • 0020087944 scopus 로고
    • Multiproject scheduling: Categorization of heuristic rules performance
    • Kurtulus, I. S., & Davis, E. W. (1982). Multiproject scheduling: Categorization of heuristic rules performance. Management Science, 28(2), 161-172.
    • (1982) Management Science , vol.28 , Issue.2 , pp. 161-172
    • Kurtulus, I.S.1    Davis, E.W.2
  • 21
    • 0022025928 scopus 로고
    • Multiproject scheduling: Analysis of project performance
    • Kurtulus, I. S., & Narula, S. C. (1985). Multiproject scheduling: Analysis of project performance. IIE Transactions, 17(1), 58-66.
    • (1985) IIE Transactions , vol.17 , Issue.1 , pp. 58-66
    • Kurtulus, I.S.1    Narula, S.C.2
  • 24
    • 0038873370 scopus 로고    scopus 로고
    • Redmond, WA: Microsoft Corporation
    • Microsoft Corporation (1997). User's guide for Microsoft Project 98. Redmond, WA: Microsoft Corporation.
    • (1997) User's Guide for Microsoft Project 98
  • 25
    • 0009970479 scopus 로고
    • Up to speed: The cost of learning on a white-collar project
    • Nevison, J. M. (1994). Up to speed: The cost of learning on a white-collar project. Project Management Journal, 25(2), 11-15.
    • (1994) Project Management Journal , vol.25 , Issue.2 , pp. 11-15
    • Nevison, J.M.1
  • 26
  • 28
    • 0016935106 scopus 로고
    • Project scheduling: The effects of problem structure on heuristic performance
    • Patterson, J. H. (1976). Project scheduling: The effects of problem structure on heuristic performance. Naval Research Logistics Quarterly, 23(1), 95-123.
    • (1976) Naval Research Logistics Quarterly , vol.23 , Issue.1 , pp. 95-123
    • Patterson, J.H.1
  • 29
    • 0021460636 scopus 로고
    • A comparison of exact approaches for solving the multiple constrained resource, project scheduling problem
    • Patterson, J. H. (1984). A comparison of exact approaches for solving the multiple constrained resource, project scheduling problem. Management Science, 30(7), 854-867.
    • (1984) Management Science , vol.30 , Issue.7 , pp. 854-867
    • Patterson, J.H.1
  • 30
    • 0014574409 scopus 로고
    • Multiproject scheduling with limited resources: A zero-one programming approach
    • Pritsker, A. B., Watters, L. J., & Wolfe, P. M. (1969). Multiproject scheduling with limited resources: A zero-one programming approach. Management Science, 16(1), 93-109.
    • (1969) Management Science , vol.16 , Issue.1 , pp. 93-109
    • Pritsker, A.B.1    Watters, L.J.2    Wolfe, P.M.3
  • 31
    • 0018444529 scopus 로고
    • A theory of progress functions
    • Sahal, D. (1979). A theory of progress functions. AIIE Transactions, 11(1), 23-29.
    • (1979) AIIE Transactions , vol.11 , Issue.1 , pp. 23-29
    • Sahal, D.1
  • 32
    • 0013370739 scopus 로고
    • Scheduling of programs with repetitive projects
    • Shtub, A. (1991). Scheduling of programs with repetitive projects. Project Management Journal, 22(4), 49-53.
    • (1991) Project Management Journal , vol.22 , Issue.4 , pp. 49-53
    • Shtub, A.1
  • 33
    • 84985848287 scopus 로고
    • A comparison of learning curve analysis and moving average ratio analysis for detailed operational planning
    • Smunt, T. L. (1986). A comparison of learning curve analysis and moving average ratio analysis for detailed operational planning. Decision Sciences, 17(4), 475-494.
    • (1986) Decision Sciences , vol.17 , Issue.4 , pp. 475-494
    • Smunt, T.L.1
  • 35
    • 0040651491 scopus 로고
    • Improving CPM's accuracy using learning curves
    • Teplitz, C. J., & Amor, J. P. (1993). Improving CPM's accuracy using learning curves. Project Management Journal, 26(4), 15-19.
    • (1993) Project Management Journal , vol.26 , Issue.4 , pp. 15-19
    • Teplitz, C.J.1    Amor, J.P.2
  • 37
    • 0001250106 scopus 로고
    • Factors affecting the cost of airplanes
    • Wright, T. P. (1936). Factors affecting the cost of airplanes. Journal of Aeronautical Science, 3(4), 112-128.
    • (1936) Journal of Aeronautical Science , vol.3 , Issue.4 , pp. 112-128
    • Wright, T.P.1
  • 38
    • 84989431553 scopus 로고
    • The learning curve: Historical review and comprehensive survey
    • Yelle, L. E. (1979). The learning curve: Historical review and comprehensive survey. Decision Sciences, 10, 302-328.
    • (1979) Decision Sciences , vol.10 , pp. 302-328
    • Yelle, L.E.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.