메뉴 건너뛰기




Volumn 37, Issue , 2015, Pages 362-374

Simulation-based experimental design and statistical modeling for lead time quotation

Author keywords

Design of experiments; Flow time estimation; Lead time due date quoting; Regression; Simulation

Indexed keywords

DESIGN; MANUFACTURE; QUALITY CONTROL; SEMICONDUCTOR DEVICE MANUFACTURE; STATISTICAL METHODS;

EID: 84953358669     PISSN: 02786125     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.jmsy.2014.07.012     Document Type: Article
Times cited : (31)

References (37)
  • 2
    • 0001200692 scopus 로고
    • Due-date setting and priority sequencing in a multiclass m/g/1 queue
    • L.M. Wein Due-date setting and priority sequencing in a multiclass m/g/1 queue Manage Sci 37 7 1991 834 850
    • (1991) Manage Sci , vol.37 , Issue.7 , pp. 834-850
    • Wein, L.M.1
  • 3
    • 0002987480 scopus 로고
    • Quoting customer lead times
    • I. Duenyas, and W.J. Hopp Quoting customer lead times Manage Sci 41 1 1995 43 57
    • (1995) Manage Sci , vol.41 , Issue.1 , pp. 43-57
    • Duenyas, I.1    Hopp, W.J.2
  • 4
    • 0032630294 scopus 로고    scopus 로고
    • Optimal lead time policies
    • M.L. Spearman, and R.Q. Zhang Optimal lead time policies Manage Sci 45 2 1999 290 295
    • (1999) Manage Sci , vol.45 , Issue.2 , pp. 290-295
    • Spearman, M.L.1    Zhang, R.Q.2
  • 5
    • 77951179143 scopus 로고    scopus 로고
    • Dynamic lead-time quotation for an m/m/1 base-stock inventory queue
    • S. Savasaneril, P.M. Griffin, and P. Keskinocak Dynamic lead-time quotation for an m/m/1 base-stock inventory queue Oper Res 58 2 2010 383 395
    • (2010) Oper Res , vol.58 , Issue.2 , pp. 383-395
    • Savasaneril, S.1    Griffin, P.M.2    Keskinocak, P.3
  • 6
    • 78651338856 scopus 로고    scopus 로고
    • An analytical model for service level and tardiness in a single machine MTO production system
    • K. Altendorfer, and H. Jodlbauer An analytical model for service level and tardiness in a single machine MTO production system Int J Prod Res 49 7 2011 1827 1850
    • (2011) Int J Prod Res , vol.49 , Issue.7 , pp. 1827-1850
    • Altendorfer, K.1    Jodlbauer, H.2
  • 7
    • 0029393210 scopus 로고
    • Estimating flowtimes and setting due-dates in complex production systems
    • S.R. Lawrence Estimating flowtimes and setting due-dates in complex production systems IIE Trans 27 1995 657 668
    • (1995) IIE Trans , vol.27 , pp. 657-668
    • Lawrence, S.R.1
  • 8
    • 33646526306 scopus 로고    scopus 로고
    • Manufacturing lead time estimation using data mining
    • A. Öztürk, S. Kayaligil, and N.E. Özdemirel Manufacturing lead time estimation using data mining Eur J Oper Res 173 2006 683 700
    • (2006) Eur J Oper Res , vol.173 , pp. 683-700
    • Öztürk, A.1    Kayaligil, S.2    Özdemirel, N.E.3
  • 9
    • 34248190308 scopus 로고    scopus 로고
    • Due-date assignment for wafer fabrication under demand variate environment
    • W.L. Pearn, S.H. Chung, and C.M. Lai Due-date assignment for wafer fabrication under demand variate environment IEEE Trans Semicond Manuf 20 2 2007 165 175
    • (2007) IEEE Trans Semicond Manuf , vol.20 , Issue.2 , pp. 165-175
    • Pearn, W.L.1    Chung, S.H.2    Lai, C.M.3
  • 10
    • 35848966779 scopus 로고    scopus 로고
    • New approaches to due date assignment in job shops
    • A. Baykasoʇlu, M. Göcken, and Z.D. Unutmaz New approaches to due date assignment in job shops Eur J Oper Res 187 2008 31 45
    • (2008) Eur J Oper Res , vol.187 , pp. 31-45
    • Baykasoʇlu, A.1    Göcken, M.2    Unutmaz, Z.D.3
  • 11
    • 0034275944 scopus 로고    scopus 로고
    • Quoting manufacturing due dates subject to a service level constraint
    • W.J. Hopp, and L.S. Sturgis Quoting manufacturing due dates subject to a service level constraint IIE Trans 32 2000 771 784
    • (2000) IIE Trans , vol.32 , pp. 771-784
    • Hopp, W.J.1    Sturgis, L.S.2
  • 12
    • 0026186620 scopus 로고
    • Dynamic rules for due date assignment
    • M.M. Vig, and K.J. Dooley Dynamic rules for due date assignment Int J Prod Res 29 1991 1361 1377
    • (1991) Int J Prod Res , vol.29 , pp. 1361-1377
    • Vig, M.M.1    Dooley, K.J.2
  • 13
    • 1942472554 scopus 로고    scopus 로고
    • Due date assignment using artificial neural networks under different shop floor control strategies
    • S.Y. Hsu, and D.Y. Sha Due date assignment using artificial neural networks under different shop floor control strategies Int J Prod Res 42 9 2004 1727 1745
    • (2004) Int J Prod Res , vol.42 , Issue.9 , pp. 1727-1745
    • Hsu, S.Y.1    Sha, D.Y.2
  • 14
    • 0036889382 scopus 로고    scopus 로고
    • Operation-based flowtime estimation in a dynamic job shop
    • I. Sabuncuoglu, and A. Comlekci Operation-based flowtime estimation in a dynamic job shop Omega 30 2002 423 442
    • (2002) Omega , vol.30 , pp. 423-442
    • Sabuncuoglu, I.1    Comlekci, A.2
  • 15
    • 33751501444 scopus 로고    scopus 로고
    • Development of a regression-based method with case-based tuning to solve the due date assignment problem
    • D.Y. Sha, R.L. Storch, and C.H. Liu Development of a regression-based method with case-based tuning to solve the due date assignment problem Int J Prod Res 45 1 2007 65 82
    • (2007) Int J Prod Res , vol.45 , Issue.1 , pp. 65-82
    • Sha, D.Y.1    Storch, R.L.2    Liu, C.H.3
  • 16
    • 84990604706 scopus 로고
    • Using neural networks to determine internally-set due-date assignments for shop scheduling
    • P.R. Philipoom, L.P. Rees, and L. Wiegmann Using neural networks to determine internally-set due-date assignments for shop scheduling Decision Sci 25 5, 6 1994 825 851
    • (1994) Decision Sci , vol.25 , Issue.5-6 , pp. 825-851
    • Philipoom, P.R.1    Rees, L.P.2    Wiegmann, L.3
  • 17
    • 33847281811 scopus 로고    scopus 로고
    • A GA-based NN approach for makespan estimation
    • S.J. Li, Y. Li, Y. Liu, and Y.F. Xu A GA-based NN approach for makespan estimation Appl Math Comput 185 2007 1003 1014
    • (2007) Appl Math Comput , vol.185 , pp. 1003-1014
    • Li, S.J.1    Li, Y.2    Liu, Y.3    Xu, Y.F.4
  • 22
    • 0036468703 scopus 로고    scopus 로고
    • Using an optimized queueing network model to support wafer fab design
    • W.J. Hopp, M.L. Spearman, S. Chayet, K.L. Donohue, and E.S. Gel Using an optimized queueing network model to support wafer fab design IIE Trans 34 2 2002 119 130
    • (2002) IIE Trans , vol.34 , Issue.2 , pp. 119-130
    • Hopp, W.J.1    Spearman, M.L.2    Chayet, S.3    Donohue, K.L.4    Gel, E.S.5
  • 23
    • 0035485518 scopus 로고    scopus 로고
    • Queueing network models in the design and analysis of semiconductor wafer fabs
    • S. Kumar, and P.R. Kumar Queueing network models in the design and analysis of semiconductor wafer fabs IEEE Trans Robot Autom 17 5 2001 548 561
    • (2001) IEEE Trans Robot Autom , vol.17 , Issue.5 , pp. 548-561
    • Kumar, S.1    Kumar, P.R.2
  • 24
    • 3242671500 scopus 로고    scopus 로고
    • Batch size modeling in a multi-item, discrete manufacturing system via an open queuing network
    • G. Meng, and S.S. Heragu Batch size modeling in a multi-item, discrete manufacturing system via an open queuing network IIE Trans 36 8 2004 743 753
    • (2004) IIE Trans , vol.36 , Issue.8 , pp. 743-753
    • Meng, G.1    Heragu, S.S.2
  • 27
    • 0031294467 scopus 로고    scopus 로고
    • Estimation in the three-parameter gamma distribution based on the empirical moment generating function
    • I.A. Koutrouvelis, and G.C. Canavos Estimation in the three-parameter gamma distribution based on the empirical moment generating function J Stat Comput Simul 59 1 1997 47 62
    • (1997) J Stat Comput Simul , vol.59 , Issue.1 , pp. 47-62
    • Koutrouvelis, I.A.1    Canavos, G.C.2
  • 28
    • 61349190420 scopus 로고    scopus 로고
    • Estimating cycle time percentile curves for manufacturing systems via simulation
    • F. Yang, B.E. Ankenman, and B.L. Nelson Estimating cycle time percentile curves for manufacturing systems via simulation INFORMS J Comput 20 4 2008 628 643
    • (2008) INFORMS J Comput , vol.20 , Issue.4 , pp. 628-643
    • Yang, F.1    Ankenman, B.E.2    Nelson, B.L.3
  • 29
    • 0041706979 scopus 로고    scopus 로고
    • Simple efficient estimation for the three-parameter gamma distribution
    • N. Balakrishnan, and J. Wang Simple efficient estimation for the three-parameter gamma distribution J Stat Plann Inference 85 2000 115 126
    • (2000) J Stat Plann Inference , vol.85 , pp. 115-126
    • Balakrishnan, N.1    Wang, J.2
  • 30
    • 0040685864 scopus 로고    scopus 로고
    • Construction of response surface designs for qualitative and quantitative factors
    • C.F.J. Wu, and Y. Ding Construction of response surface designs for qualitative and quantitative factors J Stat Plann Inference 71 1998 331 348
    • (1998) J Stat Plann Inference , vol.71 , pp. 331-348
    • Wu, C.F.J.1    Ding, Y.2
  • 31
    • 0024107086 scopus 로고
    • Response-surface designs for quantitative and qualitative variables
    • N.R. Draper, and J.A. John Response-surface designs for quantitative and qualitative variables Technometrics 30 4 1988 423 428
    • (1988) Technometrics , vol.30 , Issue.4 , pp. 423-428
    • Draper, N.R.1    John, J.A.2
  • 32
    • 33846676632 scopus 로고    scopus 로고
    • Efficient generation of cycle time-throughput curves through simulation and metamodeling
    • F. Yang, B.E. Ankenman, and B.L. Nelson Efficient generation of cycle time-throughput curves through simulation and metamodeling Nav Res Logist 54 2007 78 93
    • (2007) Nav Res Logist , vol.54 , pp. 78-93
    • Yang, F.1    Ankenman, B.E.2    Nelson, B.L.3
  • 33
    • 0012759124 scopus 로고    scopus 로고
    • On uniform design of experiments with restricted mixtures and generation of uniform distribution on some domains
    • K.T. Fang, and Z.H. Yang On uniform design of experiments with restricted mixtures and generation of uniform distribution on some domains Stat Probab Lett 46 2000 113 120
    • (2000) Stat Probab Lett , vol.46 , pp. 113-120
    • Fang, K.T.1    Yang, Z.H.2
  • 34
    • 62949099440 scopus 로고    scopus 로고
    • Uniform designs for highly constrained mixture experiments
    • J.J. Borkowski, and G.F. Piepel Uniform designs for highly constrained mixture experiments J Qual Technol 41 1 2009 35 47
    • (2009) J Qual Technol , vol.41 , Issue.1 , pp. 35-47
    • Borkowski, J.J.1    Piepel, G.F.2
  • 37
    • 0031381458 scopus 로고    scopus 로고
    • Focusing maintenance improvement efforts in a wafer fabrication facility operating under theory of constraints
    • D. Kayton, T. Teyner, C. Schwartz, and R. Uzsoy Focusing maintenance improvement efforts in a wafer fabrication facility operating under theory of constraints Prod Invent Manage J 38 4 1997 51 57
    • (1997) Prod Invent Manage J , vol.38 , Issue.4 , pp. 51-57
    • Kayton, D.1    Teyner, T.2    Schwartz, C.3    Uzsoy, R.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.