메뉴 건너뛰기




Volumn 19, Issue 2, 2006, Pages 252-258

Factory cycle-time prediction with a data-mining approach

Author keywords

Due date; Scheduling; Statistical models; Work in progress (WIP)

Indexed keywords

DUE DATE; STATISTICAL MODELS; WORK-IN-PROGRESS (WIP);

EID: 33646721935     PISSN: 08946507     EISSN: None     Source Type: Journal    
DOI: 10.1109/TSM.2006.873400     Document Type: Article
Times cited : (96)

References (15)
  • 2
    • 0036468403 scopus 로고    scopus 로고
    • Cycle time estimation for wafer fab with engineering lots
    • S.-H. Chung and H.-W. Huang, "Cycle time estimation for wafer fab with engineering lots," IIE Trans., vol. 34, pp. 105-118, 2002.
    • (2002) IIE Trans. , vol.34 , pp. 105-118
    • Chung, S.-H.1    Huang, H.-W.2
  • 3
    • 0031075934 scopus 로고    scopus 로고
    • Cost and cycle time performance of tabs based on integrated single-wafer processing
    • Feb.
    • J. C. Wood, "Cost and cycle time performance of tabs based on integrated single-wafer processing," IEEE Trans. Semiconduct. Manufact., vol. 10, no. 1, pp. 98-111, Feb. 1997.
    • (1997) IEEE Trans. Semiconduct. Manufact. , vol.10 , Issue.1 , pp. 98-111
    • Wood, J.C.1
  • 4
    • 0032002955 scopus 로고    scopus 로고
    • Due-date based scheduling and control policies in a multiproduct semiconductor wafer fabrication facility
    • Y. D. Kim, J.-U. Kim, S.-K. Lim, and H.-B. Jun, "Due-date based scheduling and control policies in a multiproduct semiconductor wafer fabrication facility," IEEE Tran. Semiconduct. Manufact., vol. 11, no. 1, pp. 155-164, 1998.
    • (1998) IEEE Tran. Semiconduct. Manufact. , vol.11 , Issue.1 , pp. 155-164
    • Kim, Y.D.1    Kim, J.-U.2    Lim, S.-K.3    Jun, H.-B.4
  • 7
    • 0001153814 scopus 로고
    • A dynamic forecasting model for Job shop flowing prediction and tardiness control
    • S. T. Enns, "A dynamic forecasting model for Job shop flowing prediction and tardiness control," Int. J. Production Res., vol. 33, no. 5, pp. 2817-2834, 1995.
    • (1995) Int. J. Production Res. , vol.33 , Issue.5 , pp. 2817-2834
    • Enns, S.T.1
  • 9
    • 3242671500 scopus 로고    scopus 로고
    • Batch size modeling in a multi-item, discrete manufacturing system via an open queuing network
    • in to appear
    • G. Meng and S. Heragu, "Batch size modeling in a multi-item, discrete manufacturing system via an open queuing network," (in to appear) IIE Trans..
    • IIE Trans.
    • Meng, G.1    Heragu, S.2
  • 10
    • 0027850894 scopus 로고
    • A probabilistic cost-based due date assignment model for job shops
    • A. C. Kaplan and A. T. Unal, "A probabilistic cost-based due date assignment model for job shops," Int. J. Production Res., vol. 31, no. 12, pp. 2817-2834, 1993.
    • (1993) Int. J. Production Res. , vol.31 , Issue.12 , pp. 2817-2834
    • Kaplan, A.C.1    Unal, A.T.2
  • 11
    • 4344590961 scopus 로고    scopus 로고
    • Neural-network-based delivery time estimates for prioritized 300-mm automatic material handling operations
    • D.Y. Liao and C.N. Wang, "Neural-network-based delivery time estimates for prioritized 300-mm automatic material handling operations," IEEE Trans. Semiconduct. Manufact., vol. 17, no. 3, pp. 324-332, 2004.
    • (2004) IEEE Trans. Semiconduct. Manufact. , vol.17 , Issue.3 , pp. 324-332
    • Liao, D.Y.1    Wang, C.N.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.