Volumn 30, Issue 6, 2002, Pages 423-442

Operation-based flowtime estimation in a dynamic job shop

Author keywords

Due date assignment; Flowtime estimation; Scheduling; Simulation

Indexed keywords

COMPUTER INTEGRATED MANUFACTURING SYSTEM; DUE-DATE ASSIGNMENT; ESTIMATION METHODS; ESTIMATION PROCESS; FLOW TIME ESTIMATION; FLOW-TIME; JOB-SHOP; ROUTE INFORMATION; SCHEDULING; SIMULATION;

EID: 0036889382     PISSN: 03050483     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0305-0483(02)00058-0     Document Type: Article
Times cited : (46)

References (35)
  • 5
    • 0020783525 scopus 로고
    • The effect of workload dependent due dates on job shop performance
    • Bertrand JWM. The effect of workload dependent due dates on job shop performance. Management Science 1983;29(7): 799-816.
    • (1983) Management Science , vol.29 , Issue.7 , pp. 799-816
    • Bertrand, J.W.M.1
  • 7
    • 0027565391 scopus 로고
    • Mixing static and dynamic estimates for due date assignment
    • Vig MM, Dooley KJ. Mixing static and dynamic estimates for due date assignment. Journal of Operations Management 1993;11:67-79.
    • (1993) Journal of Operations Management , vol.11 , pp. 67-79
    • Vig, M.M.1    Dooley, K.J.2
  • 8
    • 0027642739 scopus 로고
    • Selecting allowance policies for improved job shop performance
    • Gee ES, Smith CH. Selecting allowance policies for improved job shop performance. International Journal of Production Research 1993;31(8):1839-52.
    • (1993) International Journal of Production Research , vol.31 , Issue.8 , pp. 1839-1852
    • Gee, E.S.1    Smith, C.H.2
  • 9
    • 0023983109 scopus 로고
    • Simulation study of job shop scheduling withdue dates
    • Cheng TCE. Simulation study of job shop scheduling withdue dates. International Journal of Systems Science 1988;19(3):383-90.
    • (1988) International Journal of Systems Science , vol.19 , Issue.3 , pp. 383-390
    • Cheng, T.C.E.1
  • 10
    • 0024303531 scopus 로고
    • Survey of scheduling research involving due date determination decisions
    • Cheng TCE, Gupta MC. Survey of scheduling research involving due date determination decisions. European Journal of Operational Research 1989;38:156-66.
    • (1989) European Journal of Operational Research , vol.38 , pp. 156-166
    • Cheng, T.C.E.1    Gupta, M.C.2
  • 11
    • 0001173515 scopus 로고
    • Priority dispatching and job lateness in a jop shop
    • Conway RW. Priority dispatching and job lateness in a jop shop. Journal of Industrial Engineering 1965;16:228-37.
    • (1965) Journal of Industrial Engineering , vol.16 , pp. 228-237
    • Conway, R.W.1
  • 13
    • 0027657253 scopus 로고
    • Job shop flowtime prediction and tardiness control using queueing analysis
    • Enns ST. Job shop flowtime prediction and tardiness control using queueing analysis. International Journal of Production Research 1993;31:2045-57.
    • (1993) International Journal of Production Research , vol.31 , pp. 2045-2057
    • Enns, S.T.1
  • 14
    • 0019540666 scopus 로고
    • Combined scheduling system for reducing job tardiness in a job shop
    • Miyazaki S. Combined scheduling system for reducing job tardiness in a job shop. International Journal of Production Research 1981;19(2):201-11.
    • (1981) International Journal of Production Research , vol.19 , Issue.2 , pp. 201-211
    • Miyazaki, S.1
  • 15
    • 0020179396 scopus 로고
    • Estimating job flowtimes in a job shop for contractually negotiated due dates
    • Taylor BW, Moore LJ. Estimating job flowtimes in a job shop for contractually negotiated due dates. Journal of Operational Research Society 1982;33:845-54.
    • (1982) Journal of Operational Research Society , vol.33 , pp. 845-854
    • Taylor, B.W.1    Moore, L.J.2
  • 16
    • 0000538802 scopus 로고
    • Job shop leadtime requirements under conditions of controlled delivery performance
    • Enns ST. Job shop leadtime requirements under conditions of controlled delivery performance. European Journal of Operational Research 1994;77:429-39.
    • (1994) European Journal of Operational Research , vol.77 , pp. 429-439
    • Enns, S.T.1
  • 17
    • 0001153814 scopus 로고
    • A dynamic forecasting model for job shop flowtime prediction and tardiness control
    • Enns ST. A dynamic forecasting model for job shop flowtime prediction and tardiness control. International Journal of Production Research 1995;33(5):1295-312.
    • (1995) International Journal of Production Research , vol.33 , Issue.5 , pp. 1295-1312
    • Enns, S.T.1
  • 18
    • 0022681492 scopus 로고
    • Due date determination for a single machine shop with SPT dispatching
    • Cheng TCE. Due date determination for a single machine shop with SPT dispatching. Engineering Costs and Production Economics 1986;10:35-41.
    • (1986) Engineering Costs and Production Economics , vol.10 , pp. 35-41
    • Cheng, T.C.E.1
  • 21
    • 0022092442 scopus 로고
    • On approximate queueing models of dynamic job shops
    • Buzacott JA, Shanthikumar JG. On approximate queueing models of dynamic job shops. Management Science 1985;31:870-87.
    • (1985) Management Science , vol.31 , pp. 870-887
    • Buzacott, J.A.1    Shanthikumar, J.G.2
  • 22
    • 0024064120 scopus 로고
    • Approximations for the time spent in a dynamic job shop with applications to due date assignment
    • Shanthikumar JG, Sumita U. Approximations for the time spent in a dynamic job shop with applications to due date assignment. International Journal of Production Research 1988;26(8):1329-52.
    • (1988) International Journal of Production Research , vol.26 , Issue.8 , pp. 1329-1352
    • Shanthikumar, J.G.1    Sumita, U.2
  • 23
    • 0029393210 scopus 로고
    • Estimating flowtimes and setting due dates in complex production systems
    • Lawrence SR. Estimating flowtimes and setting due dates in complex production systems. IIE Transactions 1995;27: 657-68.
    • (1995) IIE Transactions , vol.27 , pp. 657-668
    • Lawrence, S.R.1
  • 24
    • 0000728790 scopus 로고    scopus 로고
    • Lead time selection and the behavior of work flow in job shops
    • Enns ST. Lead time selection and the behavior of work flow in job shops. European Journal of Operational Research 1998;109:122-36.
    • (1998) European Journal of Operational Research , vol.109 , pp. 122-136
    • Enns, S.T.1
  • 25
    • 0018454859 scopus 로고
    • A simulation study of predictable due dates
    • Weeks JK. A simulation study of predictable due dates. Management Science 1979;25(4):363-73.
    • (1979) Management Science , vol.25 , Issue.4 , pp. 363-373
    • Weeks, J.K.1
  • 26
    • 0024656096 scopus 로고
    • Manufacturing systems with forbidden early shipment: Implications for setting manufacturing lead times
    • Kanet JJ, Christy DP. Manufacturing systems with forbidden early shipment: implications for setting manufacturing lead times. International Journal of Production Research 1989;27(5):783-92.
    • (1989) International Journal of Production Research , vol.27 , Issue.5 , pp. 783-792
    • Kanet, J.J.1    Christy, D.P.2
  • 28
    • 0027850894 scopus 로고
    • A probabilistic cost-based due date assignment model for job shops
    • Kaplan AC, Unal AT. A probabilistic cost-based due date assignment model for job shops. International Journal of Production Research 1993;31(12):2817-34.
    • (1993) International Journal of Production Research , vol.31 , Issue.12 , pp. 2817-2834
    • Kaplan, A.C.1    Unal, A.T.2
  • 29
    • 84990604706 scopus 로고
    • Using neural networks to determine internally-set due date assignments for job shop scheduling
    • Philipoom PR, Rees LP, Wiegmann L. Using neural networks to determine internally-set due date assignments for job shop scheduling. Decision Sciences 1994;25(5/6):825-51.
    • (1994) Decision Sciences , vol.25 , Issue.5-6 , pp. 825-851
    • Philipoom, P.R.1    Rees, L.P.2    Wiegmann, L.3
  • 31
    • 0004009033 scopus 로고
    • Introduction to simulation using SIMAN
    • New Jersey: McGraw-Hill
    • Pegden CD, Shannon RE, Sadowski RP. Introduction to simulation using SIMAN. New Jersey: McGraw-Hill, 1990.
    • (1990)
    • Pegden, C.D.1    Shannon, R.E.2    Sadowski, R.P.3
  • 32
    • 0003558340 scopus 로고
    • Applied linear regression
    • New York: Wiley
    • Weisberg S. Applied linear regression. New York: Wiley, 1985.
    • (1985)
    • Weisberg, S.1
  • 33
    • 0004149270 scopus 로고
    • Applied linear statistical models
    • Boston: IRWIN
    • Neter J, Wasserman W, Kutner MH. Applied linear statistical models. Boston: IRWIN, 1990.
    • (1990)
    • Neter, J.1    Wasserman, W.2    Kutner, M.H.3
  • 34
    • 0024303126 scopus 로고
    • An expediting heuristic for the shortest processing time dispatching rule
    • Schultz CR. An expediting heuristic for the shortest processing time dispatching rule. International Journal of Production Research 1989;27(1):31-41.
    • (1989) International Journal of Production Research , vol.27 , Issue.1 , pp. 31-41
    • Schultz, C.R.1
  • 35
    • 0004312378 scopus 로고
    • Simulation modeling and analysis
    • New York: McGraw-Hill
    • Law AM, Kelton WD. Simulation modeling and analysis. New York: McGraw-Hill, 1991.
    • (1991)
    • Law, A.M.1    Kelton, W.D.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.