-
5
-
-
0020783525
-
The effect of workload dependent due dates on job shop performance
-
Bertrand JWM. The effect of workload dependent due dates on job shop performance. Management Science 1983;29(7): 799-816.
-
(1983)
Management Science
, vol.29
, Issue.7
, pp. 799-816
-
-
Bertrand, J.W.M.1
-
7
-
-
0027565391
-
Mixing static and dynamic estimates for due date assignment
-
Vig MM, Dooley KJ. Mixing static and dynamic estimates for due date assignment. Journal of Operations Management 1993;11:67-79.
-
(1993)
Journal of Operations Management
, vol.11
, pp. 67-79
-
-
Vig, M.M.1
Dooley, K.J.2
-
8
-
-
0027642739
-
Selecting allowance policies for improved job shop performance
-
Gee ES, Smith CH. Selecting allowance policies for improved job shop performance. International Journal of Production Research 1993;31(8):1839-52.
-
(1993)
International Journal of Production Research
, vol.31
, Issue.8
, pp. 1839-1852
-
-
Gee, E.S.1
Smith, C.H.2
-
9
-
-
0023983109
-
Simulation study of job shop scheduling withdue dates
-
Cheng TCE. Simulation study of job shop scheduling withdue dates. International Journal of Systems Science 1988;19(3):383-90.
-
(1988)
International Journal of Systems Science
, vol.19
, Issue.3
, pp. 383-390
-
-
Cheng, T.C.E.1
-
10
-
-
0024303531
-
Survey of scheduling research involving due date determination decisions
-
Cheng TCE, Gupta MC. Survey of scheduling research involving due date determination decisions. European Journal of Operational Research 1989;38:156-66.
-
(1989)
European Journal of Operational Research
, vol.38
, pp. 156-166
-
-
Cheng, T.C.E.1
Gupta, M.C.2
-
11
-
-
0001173515
-
Priority dispatching and job lateness in a jop shop
-
Conway RW. Priority dispatching and job lateness in a jop shop. Journal of Industrial Engineering 1965;16:228-37.
-
(1965)
Journal of Industrial Engineering
, vol.16
, pp. 228-237
-
-
Conway, R.W.1
-
13
-
-
0027657253
-
Job shop flowtime prediction and tardiness control using queueing analysis
-
Enns ST. Job shop flowtime prediction and tardiness control using queueing analysis. International Journal of Production Research 1993;31:2045-57.
-
(1993)
International Journal of Production Research
, vol.31
, pp. 2045-2057
-
-
Enns, S.T.1
-
14
-
-
0019540666
-
Combined scheduling system for reducing job tardiness in a job shop
-
Miyazaki S. Combined scheduling system for reducing job tardiness in a job shop. International Journal of Production Research 1981;19(2):201-11.
-
(1981)
International Journal of Production Research
, vol.19
, Issue.2
, pp. 201-211
-
-
Miyazaki, S.1
-
15
-
-
0020179396
-
Estimating job flowtimes in a job shop for contractually negotiated due dates
-
Taylor BW, Moore LJ. Estimating job flowtimes in a job shop for contractually negotiated due dates. Journal of Operational Research Society 1982;33:845-54.
-
(1982)
Journal of Operational Research Society
, vol.33
, pp. 845-854
-
-
Taylor, B.W.1
Moore, L.J.2
-
16
-
-
0000538802
-
Job shop leadtime requirements under conditions of controlled delivery performance
-
Enns ST. Job shop leadtime requirements under conditions of controlled delivery performance. European Journal of Operational Research 1994;77:429-39.
-
(1994)
European Journal of Operational Research
, vol.77
, pp. 429-439
-
-
Enns, S.T.1
-
17
-
-
0001153814
-
A dynamic forecasting model for job shop flowtime prediction and tardiness control
-
Enns ST. A dynamic forecasting model for job shop flowtime prediction and tardiness control. International Journal of Production Research 1995;33(5):1295-312.
-
(1995)
International Journal of Production Research
, vol.33
, Issue.5
, pp. 1295-1312
-
-
Enns, S.T.1
-
18
-
-
0022681492
-
Due date determination for a single machine shop with SPT dispatching
-
Cheng TCE. Due date determination for a single machine shop with SPT dispatching. Engineering Costs and Production Economics 1986;10:35-41.
-
(1986)
Engineering Costs and Production Economics
, vol.10
, pp. 35-41
-
-
Cheng, T.C.E.1
-
21
-
-
0022092442
-
On approximate queueing models of dynamic job shops
-
Buzacott JA, Shanthikumar JG. On approximate queueing models of dynamic job shops. Management Science 1985;31:870-87.
-
(1985)
Management Science
, vol.31
, pp. 870-887
-
-
Buzacott, J.A.1
Shanthikumar, J.G.2
-
22
-
-
0024064120
-
Approximations for the time spent in a dynamic job shop with applications to due date assignment
-
Shanthikumar JG, Sumita U. Approximations for the time spent in a dynamic job shop with applications to due date assignment. International Journal of Production Research 1988;26(8):1329-52.
-
(1988)
International Journal of Production Research
, vol.26
, Issue.8
, pp. 1329-1352
-
-
Shanthikumar, J.G.1
Sumita, U.2
-
23
-
-
0029393210
-
Estimating flowtimes and setting due dates in complex production systems
-
Lawrence SR. Estimating flowtimes and setting due dates in complex production systems. IIE Transactions 1995;27: 657-68.
-
(1995)
IIE Transactions
, vol.27
, pp. 657-668
-
-
Lawrence, S.R.1
-
24
-
-
0000728790
-
Lead time selection and the behavior of work flow in job shops
-
Enns ST. Lead time selection and the behavior of work flow in job shops. European Journal of Operational Research 1998;109:122-36.
-
(1998)
European Journal of Operational Research
, vol.109
, pp. 122-136
-
-
Enns, S.T.1
-
25
-
-
0018454859
-
A simulation study of predictable due dates
-
Weeks JK. A simulation study of predictable due dates. Management Science 1979;25(4):363-73.
-
(1979)
Management Science
, vol.25
, Issue.4
, pp. 363-373
-
-
Weeks, J.K.1
-
26
-
-
0024656096
-
Manufacturing systems with forbidden early shipment: Implications for setting manufacturing lead times
-
Kanet JJ, Christy DP. Manufacturing systems with forbidden early shipment: implications for setting manufacturing lead times. International Journal of Production Research 1989;27(5):783-92.
-
(1989)
International Journal of Production Research
, vol.27
, Issue.5
, pp. 783-792
-
-
Kanet, J.J.1
Christy, D.P.2
-
28
-
-
0027850894
-
A probabilistic cost-based due date assignment model for job shops
-
Kaplan AC, Unal AT. A probabilistic cost-based due date assignment model for job shops. International Journal of Production Research 1993;31(12):2817-34.
-
(1993)
International Journal of Production Research
, vol.31
, Issue.12
, pp. 2817-2834
-
-
Kaplan, A.C.1
Unal, A.T.2
-
29
-
-
84990604706
-
Using neural networks to determine internally-set due date assignments for job shop scheduling
-
Philipoom PR, Rees LP, Wiegmann L. Using neural networks to determine internally-set due date assignments for job shop scheduling. Decision Sciences 1994;25(5/6):825-51.
-
(1994)
Decision Sciences
, vol.25
, Issue.5-6
, pp. 825-851
-
-
Philipoom, P.R.1
Rees, L.P.2
Wiegmann, L.3
-
31
-
-
0004009033
-
Introduction to simulation using SIMAN
-
New Jersey: McGraw-Hill
-
Pegden CD, Shannon RE, Sadowski RP. Introduction to simulation using SIMAN. New Jersey: McGraw-Hill, 1990.
-
(1990)
-
-
Pegden, C.D.1
Shannon, R.E.2
Sadowski, R.P.3
-
32
-
-
0003558340
-
Applied linear regression
-
New York: Wiley
-
Weisberg S. Applied linear regression. New York: Wiley, 1985.
-
(1985)
-
-
Weisberg, S.1
-
33
-
-
0004149270
-
Applied linear statistical models
-
Boston: IRWIN
-
Neter J, Wasserman W, Kutner MH. Applied linear statistical models. Boston: IRWIN, 1990.
-
(1990)
-
-
Neter, J.1
Wasserman, W.2
Kutner, M.H.3
-
34
-
-
0024303126
-
An expediting heuristic for the shortest processing time dispatching rule
-
Schultz CR. An expediting heuristic for the shortest processing time dispatching rule. International Journal of Production Research 1989;27(1):31-41.
-
(1989)
International Journal of Production Research
, vol.27
, Issue.1
, pp. 31-41
-
-
Schultz, C.R.1
-
35
-
-
0004312378
-
Simulation modeling and analysis
-
New York: McGraw-Hill
-
Law AM, Kelton WD. Simulation modeling and analysis. New York: McGraw-Hill, 1991.
-
(1991)
-
-
Law, A.M.1
Kelton, W.D.2
|