-
1
-
-
0034321178
-
Identification of aggregate resource and job set characteristics for predicting job set makespan in batch process industries
-
Raaymakers W.H.M., and Fransoo J.C. Identification of aggregate resource and job set characteristics for predicting job set makespan in batch process industries. International Journal of Production Economics 68 (2000) 137-149
-
(2000)
International Journal of Production Economics
, vol.68
, pp. 137-149
-
-
Raaymakers, W.H.M.1
Fransoo, J.C.2
-
2
-
-
0031539946
-
A comparison of software effort estimation techniques: using function points with neural networks, case-based reasoning and regression models
-
Finnie G.R., Witting G.E., and Desharnais J.-M. A comparison of software effort estimation techniques: using function points with neural networks, case-based reasoning and regression models. Journal of Systems and Software 39 3 (1997) 281-289
-
(1997)
Journal of Systems and Software
, vol.39
, Issue.3
, pp. 281-289
-
-
Finnie, G.R.1
Witting, G.E.2
Desharnais, J.-M.3
-
3
-
-
0029393210
-
Estimating flow times and setting due dates in complex production systems
-
Lawrence S.R. Estimating flow times and setting due dates in complex production systems. IIE Transactions 27 (1995) 657-668
-
(1995)
IIE Transactions
, vol.27
, pp. 657-668
-
-
Lawrence, S.R.1
-
5
-
-
0001153814
-
A dynamic forecasting model for job shop flow time prediction and tardiness control
-
Enns S.T. A dynamic forecasting model for job shop flow time prediction and tardiness control. International Journal of Production Research 33 (1995) 1295-1312
-
(1995)
International Journal of Production Research
, vol.33
, pp. 1295-1312
-
-
Enns, S.T.1
-
6
-
-
0027657253
-
Job shop flow time prediction and tardiness control using queuing analysis
-
Enns S.T. Job shop flow time prediction and tardiness control using queuing analysis. International Journal of Production Research 31 (1993) 2045-2057
-
(1993)
International Journal of Production Research
, vol.31
, pp. 2045-2057
-
-
Enns, S.T.1
-
8
-
-
0027565391
-
Mixing static and dynamic flow time estimates for due-date assignment
-
Vig M.M., and Dooley K.J. Mixing static and dynamic flow time estimates for due-date assignment. Journal of Operations Management 11 (1993) 67-79
-
(1993)
Journal of Operations Management
, vol.11
, pp. 67-79
-
-
Vig, M.M.1
Dooley, K.J.2
-
9
-
-
0018454859
-
A simulation study of predictable due-dates
-
Weeks J.K. A simulation study of predictable due-dates. Management Science 25 (1979) 363-373
-
(1979)
Management Science
, vol.25
, pp. 363-373
-
-
Weeks, J.K.1
-
10
-
-
0034655066
-
Neural networks for cost estimation: simulations and pilot application
-
Bode J. Neural networks for cost estimation: simulations and pilot application. International Journal of Production Research 38 6 (2000) 1231-1254
-
(2000)
International Journal of Production Research
, vol.38
, Issue.6
, pp. 1231-1254
-
-
Bode, J.1
-
11
-
-
0028445840
-
Neural network models for intelligent support of managerial decision making
-
Hill T., and Remus W. Neural network models for intelligent support of managerial decision making. Decision Support Systems 11 (1994) 449-459
-
(1994)
Decision Support Systems
, vol.11
, pp. 449-459
-
-
Hill, T.1
Remus, W.2
-
12
-
-
0013195987
-
Neural network applications for scheduling jobs on parallel machines
-
Lee Y.H., and Kim S. Neural network applications for scheduling jobs on parallel machines. Computer and Industrial Engineering 25 (1993) 227-230
-
(1993)
Computer and Industrial Engineering
, vol.25
, pp. 227-230
-
-
Lee, Y.H.1
Kim, S.2
-
13
-
-
0031627997
-
Scheduling with neural networks - a review of the literature and new research directions
-
Sabuncuoglu I. Scheduling with neural networks - a review of the literature and new research directions. Production Planning and Control 9 1 (1998) 2-12
-
(1998)
Production Planning and Control
, vol.9
, Issue.1
, pp. 2-12
-
-
Sabuncuoglu, I.1
-
15
-
-
0031375936
-
An action strategy generation framework for on-line scheduling and control system in batch processing with neural networks
-
Chen W., and Muraki M. An action strategy generation framework for on-line scheduling and control system in batch processing with neural networks. International Journal of Production Research 35 (1997) 3483-3506
-
(1997)
International Journal of Production Research
, vol.35
, pp. 3483-3506
-
-
Chen, W.1
Muraki, M.2
-
16
-
-
84990604706
-
Using neural networks to determine internally-set due-date assignments for shop scheduling
-
Philipoom P.R., Rees L.P., and Wiegemann L. Using neural networks to determine internally-set due-date assignments for shop scheduling. Decision Sciences 25 (1994) 825-851
-
(1994)
Decision Sciences
, vol.25
, pp. 825-851
-
-
Philipoom, P.R.1
Rees, L.P.2
Wiegemann, L.3
-
17
-
-
0032656193
-
The construction of production performance prediction system for semiconductor manufacturing with artificial neural networks
-
Huang C.L., Huang Y.H., Chang T.Y., Chang S.H., Chung C.H., Huang D.T., and Li R.K. The construction of production performance prediction system for semiconductor manufacturing with artificial neural networks. International Journal of Production Research 37 (1999) 1387-1402
-
(1999)
International Journal of Production Research
, vol.37
, pp. 1387-1402
-
-
Huang, C.L.1
Huang, Y.H.2
Chang, T.Y.3
Chang, S.H.4
Chung, C.H.5
Huang, D.T.6
Li, R.K.7
-
18
-
-
33847310680
-
-
Shujuan Li, Yan Li, Multi-agent-based approach for determination of time-quota in integrated environment, in: The 10th International Conference Manufacturing and Management, 2002.
-
-
-
-
19
-
-
0041732027
-
Various hybrid methods based on genetic algorithms with fuzzy logic controller
-
Yun Y., Gen M., and Seo S. Various hybrid methods based on genetic algorithms with fuzzy logic controller. Journal of Intelligent Manufacturing 14 4 (2003) 401-419
-
(2003)
Journal of Intelligent Manufacturing
, vol.14
, Issue.4
, pp. 401-419
-
-
Yun, Y.1
Gen, M.2
Seo, S.3
-
24
-
-
0002903609
-
Genetic synthesis of neural network architecture
-
Davis L. (Ed), Van Nostrand Reinhold, New York
-
Harp S.A., and Samad T. Genetic synthesis of neural network architecture. In: Davis L. (Ed). Handbook of Genetic Algorithms (1991), Van Nostrand Reinhold, New York 202-221
-
(1991)
Handbook of Genetic Algorithms
, pp. 202-221
-
-
Harp, S.A.1
Samad, T.2
-
25
-
-
8844221983
-
Scheduling simulation system of hybrid flow shop and algorithms analysis
-
Chen Y.-w., and Yang G.-k. Scheduling simulation system of hybrid flow shop and algorithms analysis. Journal of System Simulation 16 10 (2004)
-
(2004)
Journal of System Simulation
, vol.16
, Issue.10
-
-
Chen, Y.-w.1
Yang, G.-k.2
-
26
-
-
0037871584
-
-
P. Arena, R. Caponetto, L. Fortuna, M.G. Xibilia, Genetic algorithm to select optimal neural network topology, in: Proceedings of the 35th Midwest Symposium on Circuit and Systems, 1992, pp. 1381-1383.
-
-
-
-
27
-
-
0026711747
-
General asymmetric neural networks and structure design by genetic algorithms
-
Bornholdt S., and Graudenz D. General asymmetric neural networks and structure design by genetic algorithms. Neural Networks 5 2 (1992) 327-334
-
(1992)
Neural Networks
, vol.5
, Issue.2
, pp. 327-334
-
-
Bornholdt, S.1
Graudenz, D.2
-
28
-
-
33847323350
-
-
G. Miller, P. Todd, S. Hedge, Designing neural networks using genetic algorithms, in: Proceeding of the Third International Joint Conference on Genetic Algorithms, 1989, pp. 379-384.
-
-
-
-
29
-
-
33847329494
-
-
Neurosolutions. NeuroSolutions Documentation. NeuroDimension, Inc., 2002.
-
-
-
|