메뉴 건너뛰기




Volumn 45, Issue 1, 2007, Pages 65-82

Development of a regression-based method with case-based tuning to solve the due date assignment problem

Author keywords

Due date assignment; Dynamic tuning; Regression based method

Indexed keywords

PARAMETER ESTIMATION; PRODUCT DESIGN; RANDOM PROCESSES; REGRESSION ANALYSIS; RESEARCH AND DEVELOPMENT MANAGEMENT; SCHEDULING;

EID: 33751501444     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207540500507435     Document Type: Article
Times cited : (31)

References (28)
  • 1
    • 0028730645 scopus 로고
    • A study of factors affecting due-date predictability in a simulated dynamic job shop
    • Chang, F.C.R., A study of factors affecting due-date predictability in a simulated dynamic job shop. J. Manuf. Syst., 1994, 13, 393-400.
    • (1994) J. Manuf. Syst. , vol.13 , pp. 393-400
    • Chang, F.C.R.1
  • 2
    • 19344367489 scopus 로고    scopus 로고
    • A bottleneck based due date assignment methodology
    • Chang, Y.J. and Lee, C.E., A bottleneck based due date assignment methodology. Int. J. Manuf. Tech. Manage., 2000, 1, 318-327.
    • (2000) Int. J. Manuf. Tech. Manage. , vol.1 , pp. 318-327
    • Chang, Y.J.1    Lee, C.E.2
  • 3
    • 0032041372 scopus 로고    scopus 로고
    • Job shop scheduling for missed due-date performance
    • Cheng, T.C.E. and Jiang, J., Job shop scheduling for missed due-date performance. Comp. & Indust. Eng., 1998, 34, 297-307.
    • (1998) Comp. & Indust. Eng. , vol.34 , pp. 297-307
    • Cheng, T.C.E.1    Jiang, J.2
  • 4
    • 0031246943 scopus 로고    scopus 로고
    • The design of due date assignment model and the determination of flow time control parameters for the wafer fabrication factories
    • Chung, S.H., Yang, M.H. and Cheng, C.M., The design of due date assignment model and the determination of flow time control parameters for the wafer fabrication factories. IEEE Trans. on Camp., Pack., Manuf. Tech.-Part C, 1997, 20, 278-287.
    • (1997) IEEE Trans. on Camp., Pack., Manuf. Tech.-part C , vol.20 , pp. 278-287
    • Chung, S.H.1    Yang, M.H.2    Cheng, C.M.3
  • 5
    • 0001173515 scopus 로고
    • Priority dispatching and job lateness in a job shop
    • Conway, R.W., Priority dispatching and job lateness in a job shop. J. Indust. Eng., 1965, 16, 228-237.
    • (1965) J. Indust. Eng. , vol.16 , pp. 228-237
    • Conway, R.W.1
  • 6
    • 0016929914 scopus 로고
    • Due date in job shop scheduling
    • Eilon, S. and Chowdhury, I.G., Due date in job shop scheduling. Int. J. Prod. Res., 1976, 14, 223-238.
    • (1976) Int. J. Prod. Res. , vol.14 , pp. 223-238
    • Eilon, S.1    Chowdhury, I.G.2
  • 7
    • 0027657253 scopus 로고
    • Job shop flow time prediction and tardiness control using queue analysis
    • Enns, S.T., Job shop flow time prediction and tardiness control using queue analysis. Int. J. Prod. Res., 1993, 31, 2045-2057.
    • (1993) Int. J. Prod. Res. , vol.31 , pp. 2045-2057
    • Enns, S.T.1
  • 9
    • 0027642739 scopus 로고
    • Selecting allowance policies for improved job shop performance
    • Gee, E.S. and Smith, C.H., Selecting allowance policies for improved job shop performance. Int. J. Prod. Res., 1993, 31, 1839-1852.
    • (1993) Int. J. Prod. Res. , vol.31 , pp. 1839-1852
    • Gee, E.S.1    Smith, C.H.2
  • 10
    • 1942472554 scopus 로고    scopus 로고
    • Due date assignment using artificial neural networks under different shop floor control strategies
    • Hsu, S.Y. and Sha, D.Y., Due date assignment using artificial neural networks under different shop floor control strategies. Int. J. Prod. Res., 2004, 42, 1727-1745.
    • (2004) Int. J. Prod. Res. , vol.42 , pp. 1727-1745
    • Hsu, S.Y.1    Sha, D.Y.2
  • 11
    • 0032002955 scopus 로고    scopus 로고
    • Due-date based scheduling and control policies in a multiproduct semiconductor wafer fabrication facility
    • Kim, Y.D., Kim, J.U., Lim, S.K. and Jun, H.B., Due-date based scheduling and control policies in a multiproduct semiconductor wafer fabrication facility. IEEE Trans. Semicon. Manuf., 1998, 11, 155-164.
    • (1998) IEEE Trans. Semicon. Manuf. , vol.11 , pp. 155-164
    • Kim, Y.D.1    Kim, J.U.2    Lim, S.K.3    Jun, H.B.4
  • 13
    • 13644284218 scopus 로고    scopus 로고
    • Real-time due-date promising by build-to-order environments
    • Moses, S., Grant, H., Gruenwald, L. and Pulat, S., Real-time due-date promising by build-to-order environments. Int. J. Prod. Res., 2004, 42, 4353-4375.
    • (2004) Int. J. Prod. Res. , vol.42 , pp. 4353-4375
    • Moses, S.1    Grant, H.2    Gruenwald, L.3    Pulat, S.4
  • 14
    • 84990604706 scopus 로고
    • Using artificial neural networks to determine internally-set due date assignment for shop scheduling
    • Philipoom, P.R., Rees, L.P. and Wiegmann, L., Using artificial neural networks to determine internally-set due date assignment for shop scheduling. Decision Sci., 1994, 25, 825-847.
    • (1994) Decision Sci. , vol.25 , pp. 825-847
    • Philipoom, P.R.1    Rees, L.P.2    Wiegmann, L.3
  • 15
    • 0031078573 scopus 로고    scopus 로고
    • Cost-based due-date assignment with the use of classical and neural-network approaches
    • Philipoom, P.R., Wiegmann, L. and Rees, L.P., Cost-based due-date assignment with the use of classical and neural-network approaches. Naval Res. Logist., 1997, 44, 21-46.
    • (1997) Naval Res. Logist. , vol.44 , pp. 21-46
    • Philipoom, P.R.1    Wiegmann, L.2    Rees, L.P.3
  • 19
    • 0001870328 scopus 로고
    • A simulation analysis of due date assignment rules
    • Ragatz, G.L. and Mabert, V.A., A simulation analysis of due date assignment rules. J. Op. Manage., 1984, 5, 27-39.
    • (1984) J. Op. Manage. , vol.5 , pp. 27-39
    • Ragatz, G.L.1    Mabert, V.A.2
  • 20
    • 0030172572 scopus 로고    scopus 로고
    • Dynamic assignation of due dates in an assembly shop based in simulation
    • Roman, D.B. and Valle, A.G., Dynamic assignation of due dates in an assembly shop based in simulation. Int. J. Prod. Res., 1996, 34, 1539-1554.
    • (1996) Int. J. Prod. Res. , vol.34 , pp. 1539-1554
    • Roman, D.B.1    Valle, A.G.2
  • 21
    • 2942642529 scopus 로고    scopus 로고
    • Due-date assignment in wafer fabrication using artificial neural networks
    • Sha, D.Y. and Hsu, S.Y., Due-date assignment in wafer fabrication using artificial neural networks. Int. J. Adv. Manuf. Tech., 2004, 23, 768-775.
    • (2004) Int. J. Adv. Manuf. Tech. , vol.23 , pp. 768-775
    • Sha, D.Y.1    Hsu, S.Y.2
  • 22
    • 0001385963 scopus 로고
    • Regression based due date assignment rules for improved assembly shop performance
    • Smith, C.H., Minor, E.D. and Wen, H.J., Regression based due date assignment rules for improved assembly shop performance. Int. J. Prod. Res., 1995, 33, 2375-2385.
    • (1995) Int. J. Prod. Res. , vol.33 , pp. 2375-2385
    • Smith, C.H.1    Minor, E.D.2    Wen, H.J.3
  • 23
    • 0031332607 scopus 로고    scopus 로고
    • Integrating order release control with due-date assignment rules
    • Tsai, C.-H., Chang, C.-T. and Li, R.-K., Integrating order release control with due-date assignment rules. Int. J. Prod. Res., 1996, 35, 3379-3392.
    • (1996) Int. J. Prod. Res. , vol.35 , pp. 3379-3392
    • Tsai, C.-H.1    Chang, C.-T.2    Li, R.-K.3
  • 24
    • 0026945242 scopus 로고
    • Neural networks applications in manufacturing process
    • Udo, G.J., Neural networks applications in manufacturing process. Comp. Indust. Eng., 1992, 23, 97-100.
    • (1992) Comp. Indust. Eng. , vol.23 , pp. 97-100
    • Udo, G.J.1
  • 25
    • 0027565391 scopus 로고
    • Mixing static and dynamic estimates for due date assignment
    • Vig, M.M. and Dooley, K.J., Mixing static and dynamic estimates for due date assignment. J. Op. Manage., 1993, 11, 67-79.
    • (1993) J. Op. Manage. , vol.11 , pp. 67-79
    • Vig, M.M.1    Dooley, K.J.2
  • 26
    • 0026186620 scopus 로고
    • Dynamic rules for due date assignment
    • Vig, M.M. and Dooley, K.J., Dynamic rules for due date assignment. Int. J. Prod. Res., 1991, 29, 1361-1377.
    • (1991) Int. J. Prod. Res. , vol.29 , pp. 1361-1377
    • Vig, M.M.1    Dooley, K.J.2
  • 27
    • 0001717058 scopus 로고    scopus 로고
    • Induction of model trees for predicting continuous classes
    • University of Economics, Faculty of Informatics and Statistics, Prague
    • Wang, Y. and Witten, I.H., Induction of model trees for predicting continuous classes, in Proceedings of the Poster Papers of the European Conference on Machine Learning, University of Economics, Faculty of Informatics and Statistics, Prague, 1997, pp. 128-137.
    • (1997) Proceedings of the Poster Papers of the European Conference on Machine Learning , pp. 128-137
    • Wang, Y.1    Witten, I.H.2
  • 28
    • 0024055865 scopus 로고
    • Scheduling semiconductor wafer fabrication
    • Wein, L.M., Scheduling semiconductor wafer fabrication. IEEE Trans. Semicon. Manuf., 1988, 1, 115-130.
    • (1988) IEEE Trans. Semicon. Manuf. , vol.1 , pp. 115-130
    • Wein, L.M.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.