메뉴 건너뛰기




Volumn 42, Issue 9, 2004, Pages 1727-1745

Due date assignment using artificial neural networks under different shop floor control strategies

Author keywords

[No Author keywords available]

Indexed keywords

COMPETITION; COMPUTER SIMULATION; CONSUMER PRODUCTS; CONTROL SYSTEM ANALYSIS; CONTROLLABILITY; CUSTOMER SATISFACTION; DATA COMPRESSION; DECISION MAKING; INFORMATION ANALYSIS; NEURAL NETWORKS; PARALLEL PROCESSING SYSTEMS; PARAMETER ESTIMATION; SENSITIVITY ANALYSIS; STATISTICAL METHODS; STRATEGIC PLANNING;

EID: 1942472554     PISSN: 00207543     EISSN: None     Source Type: Journal    
DOI: 10.1080/00207540310001624375     Document Type: Review
Times cited : (38)

References (20)
  • 1
    • 0028730645 scopus 로고
    • A study of factors affecting due-date predictability in a simulation dynamic job shops
    • CHANG, F. C. R., 1994, A study of factors affecting due-date predictability in a simulation dynamic job shops. Journal of Manufacturing System, 13, 393-400.
    • (1994) Journal of Manufacturing System , vol.13 , pp. 393-400
    • Chang, F.C.R.1
  • 2
    • 0024303531 scopus 로고
    • Survey of scheduling research involving due date determination decisions
    • CHENG, T. C. E. and GUPTA, M. C., 1989, Survey of scheduling research involving due date determination decisions. European Journal of Operation Research, 38, 156-166.
    • (1989) European Journal of Operation Research , vol.38 , pp. 156-166
    • Cheng, T.C.E.1    Gupta, M.C.2
  • 3
    • 0031246943 scopus 로고    scopus 로고
    • The design of due date assignment model and the determination of flow time control parameters for the wafer fabrication factories
    • CHUNG, S. H., YANG, M. H. and CHENG, C. M., 1997, The design of due date assignment model and the determination of flow time control parameters for the wafer fabrication factories. IEEE Transaction on Component, Packaging, and Manufacturing Technology - Part C, 20, 278-287.
    • (1997) IEEE Transaction on Component, Packaging, and Manufacturing Technology - Part C , vol.20 , pp. 278-287
    • Chung, S.H.1    Yang, M.H.2    Cheng, C.M.3
  • 5
    • 0027657253 scopus 로고
    • Job shop flow time prediction and tardiness control using queue analysis
    • ENNS, S. T., 1993, Job shop flow time prediction and tardiness control using queue analysis. International Journal of Production Research, 31, 2045-2057.
    • (1993) International Journal of Production Research , vol.31 , pp. 2045-2057
    • Enns, S.T.1
  • 8
    • 0027850894 scopus 로고
    • A probabilistic cost-based due date assignment model for job shops
    • KAPLAN, A. C. and URNAL, A. T., 1993, A probabilistic cost-based due date assignment model for job shops. International Journal of Production Research, 31, 2817-2834.
    • (1993) International Journal of Production Research , vol.31 , pp. 2817-2834
    • Kaplan, A.C.1    Urnal, A.T.2
  • 10
    • 84990604706 scopus 로고
    • Using artificial neural networks to determine internally-set due-date assignments for shop scheduling
    • PHILIPOOM, P. R., REES, L. R., and WIEGMANN, L., 1994, Using artificial neural networks to determine internally-set due-date assignments for shop scheduling. Decision Sciences, 25, 825-847.
    • (1994) Decision Sciences , vol.25 , pp. 825-847
    • Philipoom, P.R.1    Rees, L.R.2    Wiegmann, L.3
  • 11
  • 14
    • 0030129222 scopus 로고    scopus 로고
    • Using neural networks to predict component inspection requirements for aging aircraft
    • SHYUR, H. J., LUXHOJ, J. T. and WILLIAMS, T. P., 1996, Using neural networks to predict component inspection requirements for aging aircraft. Computers and Industrial Engineering, 30, 257-267.
    • (1996) Computers and Industrial Engineering , vol.30 , pp. 257-267
    • Shyur, H.J.1    Luxhoj, J.T.2    Williams, T.P.3
  • 15
    • 0001385963 scopus 로고
    • Regression-based due date assignment rules for improved assembly shop performance
    • SMITH, C. H., MINOR, E. D. and WEN, H. J., 1995, Regression-based due date assignment rules for improved assembly shop performance. International Journal of Production Research, 33, 2375-2385.
    • (1995) International Journal of Production Research , vol.33 , pp. 2375-2385
    • Smith, C.H.1    Minor, E.D.2    Wen, H.J.3
  • 17
    • 0026945242 scopus 로고
    • Neural networks applications in manufacturing process
    • UDO, G. J., 1992, Neural networks applications in manufacturing process. Computers and Industrial Engineering, 23, 97-100.
    • (1992) Computers and Industrial Engineering , vol.23 , pp. 97-100
    • Udo, G.J.1
  • 19
    • 0018454859 scopus 로고
    • A simulation study of predictable due-dates
    • WEEKS, J. K., 1979, A simulation study of predictable due-dates. Management Science, 25, 363-373.
    • (1979) Management Science , vol.25 , pp. 363-373
    • Weeks, J.K.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.