메뉴 건너뛰기




Volumn 54, Issue 5, 2015, Pages 1628-1639

Scheduling of operations in a large-scale scientific services facility via multicommodity flow and an optimization-based algorithm

Author keywords

[No Author keywords available]

Indexed keywords

SCHEDULING; SERVICE INDUSTRY;

EID: 84923066267     PISSN: 08885885     EISSN: 15205045     Source Type: Journal    
DOI: 10.1021/ie503660f     Document Type: Article
Times cited : (13)

References (38)
  • 1
    • 84877017717 scopus 로고    scopus 로고
    • Optimal Selection of Raw Materials for Pharmaceutical Drug Product Design and Manufacture using Mixed Integer Nonlinear Programming and Multivariate Latent Variable Regression Models
    • Garcia-Munoz, S.; Mercado, J. Optimal Selection of Raw Materials for Pharmaceutical Drug Product Design and Manufacture using Mixed Integer Nonlinear Programming and Multivariate Latent Variable Regression Models. Ind. Eng. Chem. Res. 2013, 52 (17), 5934-5942.
    • (2013) Ind. Eng. Chem. Res. , vol.52 , Issue.17 , pp. 5934-5942
    • Garcia-Munoz, S.1    Mercado, J.2
  • 2
    • 84861575795 scopus 로고    scopus 로고
    • Integrated supply chain planning for multinational pharmaceutical enterprises
    • Susarla, N.; Karimi, I. A. Integrated supply chain planning for multinational pharmaceutical enterprises. Comput. Chem. Eng. 2008, 42, 168-177.
    • (2008) Comput. Chem. Eng. , vol.42 , pp. 168-177
    • Susarla, N.1    Karimi, I.A.2
  • 3
    • 84865403169 scopus 로고    scopus 로고
    • A modeling study of the effect of carbon dioxide mitigation strategies, natural gas prices and steam consumption on the Canadian Oil Sands operations
    • Betancourt-Torcat, A.; Elkamel, A.; Ricardez-Sandoval, L. A. A modeling study of the effect of carbon dioxide mitigation strategies, natural gas prices and steam consumption on the Canadian Oil Sands operations. Energy 2012, 45 (1), 1018-1033.
    • (2012) Energy , vol.45 , Issue.1 , pp. 1018-1033
    • Betancourt-Torcat, A.1    Elkamel, A.2    Ricardez-Sandoval, L.A.3
  • 4
    • 84908191718 scopus 로고    scopus 로고
    • Optimal Infrastructure of the Upgrading Operations in the Oil Sands under Uncertainty: A Multiscenario MINLP Approach
    • Ubirajara, G.; Patil, B. P.; Betancourt-Torcat, A.; Ricardez-Sandoval, L. A. Optimal Infrastructure of the Upgrading Operations in the Oil Sands under Uncertainty: A Multiscenario MINLP Approach. Ind. Eng. Chem. Res. 2014, 53 (42), 16406-16424.
    • (2014) Ind. Eng. Chem. Res. , vol.53 , Issue.42 , pp. 16406-16424
    • Ubirajara, G.1    Patil, B.P.2    Betancourt-Torcat, A.3    Ricardez-Sandoval, L.A.4
  • 5
    • 84898037535 scopus 로고    scopus 로고
    • An optimization energy model for the upgrading processes of Canadian unconventional oil
    • Charry-Sanchez, J.; Betancourt-Torcat, A.; Ricardez-Sandoval, L. A. An optimization energy model for the upgrading processes of Canadian unconventional oil. Energy 2014, 68, 629-643.
    • (2014) Energy , vol.68 , pp. 629-643
    • Charry-Sanchez, J.1    Betancourt-Torcat, A.2    Ricardez-Sandoval, L.A.3
  • 6
    • 84906535265 scopus 로고    scopus 로고
    • A survey on current advanced IGCC power plant technologies, sensors and control systems
    • Sahraei, M. H.; McCalden, D.; Hughes, R.; Ricardez-Sandoval, L. A. A survey on current advanced IGCC power plant technologies, sensors and control systems. Fuel 2014, 137, 168-177.
    • (2014) Fuel , vol.137 , pp. 168-177
    • Sahraei, M.H.1    McCalden, D.2    Hughes, R.3    Ricardez-Sandoval, L.A.4
  • 7
    • 84900538121 scopus 로고    scopus 로고
    • Flexible Operation Scheduling of a Power Plant Integrated with PCC Processes under Market Dynamics
    • Khalilpour, R. Flexible Operation Scheduling of a Power Plant Integrated with PCC Processes under Market Dynamics. Ind. Eng. Chem. Res. 2014, 53 (19), 8132-8146.
    • (2014) Ind. Eng. Chem. Res. , vol.53 , Issue.19 , pp. 8132-8146
    • Khalilpour, R.1
  • 8
    • 0031140322 scopus 로고    scopus 로고
    • A mixed-integer linear programming model for short-term scheduling of single-stage multiproduct batch plants with parallel lines
    • Cerda, J.; Henning, G. P.; Grossmann, I. E. A mixed-integer linear programming model for short-term scheduling of single-stage multiproduct batch plants with parallel lines. Ind. Eng. Chem. Res. 1997, 36 (5), 1695-1707.
    • (1997) Ind. Eng. Chem. Res. , vol.36 , Issue.5 , pp. 1695-1707
    • Cerda, J.1    Henning, G.P.2    Grossmann, I.E.3
  • 9
    • 79961086795 scopus 로고    scopus 로고
    • Optimal multiperiod scheduling of multiproduct batch plants under demand uncertainty
    • Zhu, J.; Gu, X.; Gu, W. Optimal multiperiod scheduling of multiproduct batch plants under demand uncertainty. KYBERNETES 2011, 40 (5-6), 871-882.
    • (2011) KYBERNETES , vol.40 , Issue.5-6 , pp. 871-882
    • Zhu, J.1    Gu, X.2    Gu, W.3
  • 10
    • 77956400080 scopus 로고    scopus 로고
    • Single-Stage Scheduling of Multiproduct Batch Plants: An Edible-Oil Deodorizer Case Study
    • Liu, S.; Pinto, J. M.; Papageorgiou, L. G. Single-Stage Scheduling of Multiproduct Batch Plants: An Edible-Oil Deodorizer Case Study. Ind. Eng. Chem. Res. 2010, 49 (18), 8657-8669.
    • (2010) Ind. Eng. Chem. Res. , vol.49 , Issue.18 , pp. 8657-8669
    • Liu, S.1    Pinto, J.M.2    Papageorgiou, L.G.3
  • 11
    • 0037503184 scopus 로고    scopus 로고
    • An improved MILP formulation for scheduling multiproduct, multistage batch plants
    • Gupta, S.; Karimi, I. A. An improved MILP formulation for scheduling multiproduct, multistage batch plants. Ind. Eng. Chem. Res. 2003, 42 (11), 2365-2380.
    • (2003) Ind. Eng. Chem. Res. , vol.42 , Issue.11 , pp. 2365-2380
    • Gupta, S.1    Karimi, I.A.2
  • 12
    • 38849149625 scopus 로고    scopus 로고
    • A framework for addressing stochastic and combinatorial aspects of scheduling and resource allocation in pharmaceutical R&D pipelines
    • Varma, V. A.; Pekny, J. F.; Blau, G. E.; Reklaitis, G. V. A framework for addressing stochastic and combinatorial aspects of scheduling and resource allocation in pharmaceutical R&D pipelines. Comput. Chem. Eng. 2008, 32 (4-5), 1000-1015.
    • (2008) Comput. Chem. Eng. , vol.32 , Issue.4-5 , pp. 1000-1015
    • Varma, V.A.1    Pekny, J.F.2    Blau, G.E.3    Reklaitis, G.V.4
  • 13
    • 84866929231 scopus 로고    scopus 로고
    • Production Scheduling of a Large-Scale Steelmaking Continuous Casting Process via Unit-Specific Event-Based Continuous-Time Models: Short-Term and Medium-Term Scheduling
    • Li, J.; Xiao, X.; Tang, Q.; Floudas, C. A. Production Scheduling of a Large-Scale Steelmaking Continuous Casting Process via Unit-Specific Event-Based Continuous-Time Models: Short-Term and Medium-Term Scheduling. Ind. Eng. Chem. Res. 2012, 51 (21), 7300-7319.
    • (2012) Ind. Eng. Chem. Res. , vol.51 , Issue.21 , pp. 7300-7319
    • Li, J.1    Xiao, X.2    Tang, Q.3    Floudas, C.A.4
  • 14
    • 84901242416 scopus 로고    scopus 로고
    • Robust optimization and stochastic programming approaches for mediumterm production scheduling of a large-scale steelmaking continuous casting process under demand uncertainty
    • Ye, Y.; Li, J.; Li, Z.; Tang, Q.; Xiao, X.; Floudas, C. A. Robust optimization and stochastic programming approaches for mediumterm production scheduling of a large-scale steelmaking continuous casting process under demand uncertainty. Comput. Chem. Eng. 2014, 66, 165-185.
    • (2014) Comput. Chem. Eng. , vol.66 , pp. 165-185
    • Ye, Y.1    Li, J.2    Li, Z.3    Tang, Q.4    Xiao, X.5    Floudas, C.A.6
  • 15
    • 38849148294 scopus 로고    scopus 로고
    • Process scheduling under uncertainty: Review and challenges
    • Li, Z.; Ierapetritou, M. Process scheduling under uncertainty: Review and challenges. Comput. Chem. Eng. 2008, 32 (4-5), 715-727.
    • (2008) Comput. Chem. Eng. , vol.32 , Issue.4-5 , pp. 715-727
    • Li, Z.1    Ierapetritou, M.2
  • 16
    • 9744281931 scopus 로고    scopus 로고
    • Scheduling of batch processes: An industrial application in paint industry
    • Orcun, S.; Discioglu, A.; Altinel, I. K.; Hortacsu, O. Scheduling of batch processes: An industrial application in paint industry. Comput. Chem. Eng. 1997, 21, S673-S678.
    • (1997) Comput. Chem. Eng. , vol.21 , pp. S673-S678
    • Orcun, S.1    Discioglu, A.2    Altinel, I.K.3    Hortacsu, O.4
  • 17
    • 4243990575 scopus 로고    scopus 로고
    • Optimal planning and scheduling of batch plants with operational uncertainties: An industrial application to baker's yeast product
    • Orcun, S.; Cebe, T.; Altinel, I. K.; Hortacsu, O. Optimal planning and scheduling of batch plants with operational uncertainties: An industrial application to baker's yeast product. Comput. Chem. Eng. 1999, 23, S183-S186.
    • (1999) Comput. Chem. Eng. , vol.23 , pp. S183-S186
    • Orcun, S.1    Cebe, T.2    Altinel, I.K.3    Hortacsu, O.4
  • 18
    • 83655190657 scopus 로고    scopus 로고
    • Algorithm for Long-Term Scheduling of Multiproduct Pipelines
    • MirHassani, S. A.; Moradi, S.; Taghinezhad, N. Algorithm for Long-Term Scheduling of Multiproduct Pipelines. Ind. Eng. Chem. Res. 2011, 50 (24), 13899-13910.
    • (2011) Ind. Eng. Chem. Res. , vol.50 , Issue.24 , pp. 13899-13910
    • MirHassani, S.A.1    Moradi, S.2    Taghinezhad, N.3
  • 19
    • 84893349868 scopus 로고    scopus 로고
    • MPEC strategies for efficient and stable scheduling of hydrogen pipeline network operation
    • Zhou, L.; Liao, Z.; Wang, J.; Jiang, B.; Yang, Y. MPEC strategies for efficient and stable scheduling of hydrogen pipeline network operation. Appl. Energy 2014, 119, 296-305.
    • (2014) Appl. Energy , vol.119 , pp. 296-305
    • Zhou, L.1    Liao, Z.2    Wang, J.3    Jiang, B.4    Yang, Y.5
  • 20
    • 78449273902 scopus 로고    scopus 로고
    • Scheduling multi-product treestructure pipelines
    • MirHassani, S.A.; Jahromi, H. F. Scheduling multi-product treestructure pipelines. Comput. Chem. Eng. 2011, 35 (1), 165-176.
    • (2011) Comput. Chem. Eng. , vol.35 , Issue.1 , pp. 165-176
    • MirHassani, S.A.1    Jahromi, H.F.2
  • 21
    • 18244395059 scopus 로고    scopus 로고
    • Optimal scheduling of a lube oil and paraffin production plant
    • Casas-Liza, J.; Pinto, J. M. Optimal scheduling of a lube oil and paraffin production plant. Comput. Chem. Eng. 2005, 29 (6), 1329-1344.
    • (2005) Comput. Chem. Eng. , vol.29 , Issue.6 , pp. 1329-1344
    • Casas-Liza, J.1    Pinto, J.M.2
  • 22
    • 64749088865 scopus 로고    scopus 로고
    • Scheduling of Loading and Unloading of Crude Oil in a Refinery with Optimal Mixture Preparation
    • Saharidis, G. K. D.; Ierapetritou, M. G. Scheduling of Loading and Unloading of Crude Oil in a Refinery with Optimal Mixture Preparation. Ind. Eng. Chem. Res. 2009, 48 (5), 2624-2633.
    • (2009) Ind. Eng. Chem. Res. , vol.48 , Issue.5 , pp. 2624-2633
    • Saharidis, G.K.D.1    Ierapetritou, M.G.2
  • 23
    • 84863839501 scopus 로고    scopus 로고
    • Short-Term Scheduling of Refinery Crude Oil Operations
    • Yadav, S.; Shaik, M. A. Short-Term Scheduling of Refinery Crude Oil Operations. Ind. Eng. Chem. Res. 2012, 51 (27), 9287-9299.
    • (2012) Ind. Eng. Chem. Res. , vol.51 , Issue.27 , pp. 9287-9299
    • Yadav, S.1    Shaik, M.A.2
  • 24
    • 84860436137 scopus 로고    scopus 로고
    • A Multiperiod Optimization Model for Hydrogen System Scheduling in Refinery
    • Jiao, Y.; Su, H.; Hou, W.; Liao, Z. A Multiperiod Optimization Model for Hydrogen System Scheduling in Refinery. Ind. Eng. Chem. Res. 2012, 51 (17), 6085-6098.
    • (2012) Ind. Eng. Chem. Res. , vol.51 , Issue.17 , pp. 6085-6098
    • Jiao, Y.1    Su, H.2    Hou, W.3    Liao, Z.4
  • 25
    • 77649187992 scopus 로고    scopus 로고
    • Cyclic scheduling for best profitability of industrial cracking furnace system
    • Liu, C.; Zhang, J.; Xu, Q.; Li, K. Cyclic scheduling for best profitability of industrial cracking furnace system. Comput. Chem. Eng. 2010, 34 (4), 544-554.
    • (2010) Comput. Chem. Eng. , vol.34 , Issue.4 , pp. 544-554
    • Liu, C.1    Zhang, J.2    Xu, Q.3    Li, K.4
  • 26
    • 64749085959 scopus 로고    scopus 로고
    • Proactive Scheduling Strategy Applied to Decoking Operations of an Industrial Naphtha Cracking Furnace System
    • Lim, H.; Choi, J.; Realff, M.; Lee, J. H.; Park, S. Proactive Scheduling Strategy Applied to Decoking Operations of an Industrial Naphtha Cracking Furnace System. Ind. Eng. Chem. Res. 2009, 48 (6), 3024-3032.
    • (2009) Ind. Eng. Chem. Res. , vol.48 , Issue.6 , pp. 3024-3032
    • Lim, H.1    Choi, J.2    Realff, M.3    Lee, J.H.4    Park, S.5
  • 27
    • 33748291808 scopus 로고    scopus 로고
    • Development of optimal decoking scheduling strategies for an industrial naphtha cracking furnace system
    • Lim, H.; Choi, J.; Realff, M.; Lee, J. H.; Park, S. Development of optimal decoking scheduling strategies for an industrial naphtha cracking furnace system. Ind. Eng. Chem. Res. 2006, 45 (16), 5738-5747.
    • (2006) Ind. Eng. Chem. Res. , vol.45 , Issue.16 , pp. 5738-5747
    • Lim, H.1    Choi, J.2    Realff, M.3    Lee, J.H.4    Park, S.5
  • 29
    • 0442269145 scopus 로고    scopus 로고
    • An MILP-based approach to the shortterm scheduling of make-and-pack continuous production plants
    • Mendez, C. A.; Cerda, J. An MILP-based approach to the shortterm scheduling of make-and-pack continuous production plants. OR Spectrum. 2002, 24 (4), 403-429.
    • (2002) OR Spectrum. , vol.24 , Issue.4 , pp. 403-429
    • Mendez, C.A.1    Cerda, J.2
  • 30
    • 84889808975 scopus 로고    scopus 로고
    • A dispatching algorithm for flexible jobshop scheduling with transfer batches: An industrial application
    • Calleja, G.; Pastor, R. A dispatching algorithm for flexible jobshop scheduling with transfer batches: an industrial application. Prod. Plan. Control 2014, 25 (2), 93-109.
    • (2014) Prod. Plan. Control , vol.25 , Issue.2 , pp. 93-109
    • Calleja, G.1    Pastor, R.2
  • 31
    • 84891453494 scopus 로고    scopus 로고
    • Improved Swing-Cut Modeling for Planning and Scheduling of Oil-Refinery Distillation Units
    • Menezes, B. C.; Kelly, J. D.; Grossmann, I. E. Improved Swing-Cut Modeling for Planning and Scheduling of Oil-Refinery Distillation Units. Ind. Eng. Chem. Res. 2013, 52 (51), 18324-18333.
    • (2013) Ind. Eng. Chem. Res. , vol.52 , Issue.51 , pp. 18324-18333
    • Menezes, B.C.1    Kelly, J.D.2    Grossmann, I.E.3
  • 32
    • 84875936813 scopus 로고    scopus 로고
    • A hybrid VNS approach for the short-term production planning and scheduling: A case study in the pulp and paper industry
    • Figueira, G.; Santos, M. O.; Almada-Lobo, B. A hybrid VNS approach for the short-term production planning and scheduling: A case study in the pulp and paper industry. Comput. Chem. Eng. 2013, 40 (7), 1804-1818.
    • (2013) Comput. Chem. Eng. , vol.40 , Issue.7 , pp. 1804-1818
    • Figueira, G.1    Santos, M.O.2    Almada-Lobo, B.3
  • 34
    • 77957358328 scopus 로고    scopus 로고
    • Rolling horizon based planning and scheduling integration with production capacity consideration
    • Li, Z.; Ierapetritou, M. G. Rolling horizon based planning and scheduling integration with production capacity consideration. Chem. Eng. Sci. 2010, 65 (22), 5887-5900.
    • (2010) Chem. Eng. Sci. , vol.65 , Issue.22 , pp. 5887-5900
    • Li, Z.1    Ierapetritou, M.G.2
  • 35
    • 77952403402 scopus 로고    scopus 로고
    • Integration of Operational Planning and Medium-Term Scheduling for Large-Scale Industrial Batch Plants under Demand and Processing Time Uncertainty
    • Verderame, P. M.; Floudas, C. A. Integration of Operational Planning and Medium-Term Scheduling for Large-Scale Industrial Batch Plants under Demand and Processing Time Uncertainty. Ind. Eng. Chem. Res. 2010, 49 (10), 4948-4965.
    • (2010) Ind. Eng. Chem. Res. , vol.49 , Issue.10 , pp. 4948-4965
    • Verderame, P.M.1    Floudas, C.A.2
  • 36
    • 84899008060 scopus 로고    scopus 로고
    • Simultaneous regular and non-regular production scheduling of multipurpose batch plants: A real chemical-pharmaceutical case study
    • Moniz, S.; Barbosa-Povoa, A. P.; de Sousa, J. P. Simultaneous regular and non-regular production scheduling of multipurpose batch plants: A real chemical-pharmaceutical case study. Comput. Chem. Eng. 2014, 67, 83-102.
    • (2014) Comput. Chem. Eng. , vol.67 , pp. 83-102
    • Moniz, S.1    Barbosa-Povoa, A.P.2    De Sousa, J.P.3
  • 37
    • 84880017587 scopus 로고    scopus 로고
    • Procurement planning in oil refining industries considering blending operations
    • Oddsdottir, T. A.; Grunow, M.; Akkerman, R. Procurement planning in oil refining industries considering blending operations. Comput. Chem. Eng. 2013, 58, 1-13.
    • (2013) Comput. Chem. Eng. , vol.58 , pp. 1-13
    • Oddsdottir, T.A.1    Grunow, M.2    Akkerman, R.3
  • 38
    • 78449270823 scopus 로고    scopus 로고
    • Optimal scheduling of continuous plants with energy constraints
    • Castro, P. M.; Harjunkoski, I.; Grossmann, I. E. Optimal scheduling of continuous plants with energy constraints. Comput. Chem. Eng. 2011, 35 (2), 372-387.
    • (2011) Comput. Chem. Eng. , vol.35 , Issue.2 , pp. 372-387
    • Castro, P.M.1    Harjunkoski, I.2    Grossmann, I.E.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.